The SAFETEA-LU amendment to Section 5309(1)(2) also requires that FTA publish an annual report<br />

that analyzes the consistency <strong>and</strong> accuracy of cost <strong>and</strong> ridership forecasts prepared by contractors. To<br />

help fulfill this responsibility, FTA requires, as part of the before-<strong>and</strong>-after submissions, Grantees to<br />

identify the contractor(s) responsible for the forecasts <strong>and</strong> to include a description of the contractor’s<br />

role <strong>and</strong> responsibilities.<br />

3.0 OBJECTIVES<br />

The objectives of this OP are to ensure that the Grantee performing the following <strong>and</strong> submitting it to<br />

FTA in a timely manner:<br />

• Preserving the project scope <strong>and</strong> capital cost forecasts (predictions) at each stage of project<br />

development to a level sufficient for use in the predicted-versus-actual analysis for the<br />

<strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong>;<br />

• Documenting <strong>and</strong> analyzing changes in the project scope <strong>and</strong> capital cost forecasts since the<br />

previous phase of project development to a level sufficient for use in the predicted-versusactual<br />

analysis for the <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong>; <strong>and</strong><br />

• Developing the <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Plan for project scope <strong>and</strong> capital costs that identifies<br />

the appropriate work to be performed for their <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong>, including a sufficient<br />

allocation of cost to perform this work;<br />

• Developing interim reports as appropriate;<br />

• Developing the <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> Report that adequately achieves the project scope <strong>and</strong><br />

capital cost analysis objectives of FTA’s <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> requirements.<br />

4.0 REFERENCES<br />

The following are the principal, but by no means the only, references to <strong>Federal</strong> legislation,<br />

codification, regulation, <strong>and</strong> guidance with which the PMOC should have a good underst<strong>and</strong>ing as<br />

related to the Grantee’s work being reviewed under this OP:<br />

4.1 Legislative<br />

• The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users<br />

(SAFETEA-LU), Pub.L. 109-59<br />

4.2 United States Code<br />

• FTA Statues, 49 U.S.C. Chapter 53<br />

4.3 Regulations<br />

• Final Rule on Major Capital Investment Projects, 49 CFR Part 611<br />

4.4 FTA Circulars<br />

• C5200.1A, Full Funding Grant Agreements Guidance<br />

FOR FTA INTERNAL USE ONLY OP 27 <strong>Before</strong>-<strong>and</strong>-<strong>After</strong> <strong>Study</strong> <strong>Review</strong>s<br />

Rev. 2, May 2010<br />

Page 2 of 6