Smokey Hills <strong>Platinum</strong> Mine<br />
Processing<br />
Standard MF2 design for treating UG2 Reef<br />
Planned throughput 60,000 tpm<br />
Planned production 90,000 ozs 4E per annum in concentrate<br />
Shipped to IRS in Rustenburg, South Africa for smelting & refining<br />
Power<br />
Eskom power connected (8 MVA with up to 12.5 MVA for future)<br />
8 MVA Diesel Generating Capacity Installed<br />
Water<br />
Lebalelo Water Scheme – 60,000 m3 per month 20 km pipeline<br />
PLA www.platinumaus.com 13