Download - ABN Newswire
Download - ABN Newswire
Download - ABN Newswire
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Bounty Oil & Gas NL Annual Report - 2011<br />
ATP 259P Naccowlah Block and Associated PL’s SW Queensland - Bounty 2%<br />
Location: Surrounding Jackson, Naccowlah and Watson Oilfields<br />
Background<br />
The Naccowlah Block comprises 3116<br />
km 2 approximately half of which is<br />
covered by ATP 259P (N) and the<br />
remainder in 22 production licences<br />
(PL’s) covering producing fields. This<br />
area has the capacity to produce 40 bopd<br />
net to Bounty. This year the operator has<br />
cut operating costs while progressing the<br />
tie in of new wells.<br />
The Jackson and Jackson South fields<br />
and associated production facilities are<br />
the largest in onshore Australia.<br />
Acquisition and 2010/11 Development<br />
The acquisition by Bounty of a 2% interest in ATP 259 Naccowlah Block from Drillsearch Energy Limited was<br />
closed on 28 January 2011 by the payment of balance purchase monies and adjustments for capital and other<br />
items at a cost of $1,254,048. As a result Bounty increased its 1P and 2P oil reserves and production.<br />
The effective date for adjustments was 1 April 2010. Revenue and expenses were accounted after closing of<br />
the contract.<br />
During the last year; three Near Field Exploration wells were drilled and Bounty participated at its interest.<br />
Watson West 1 and Irtalie East 1 were new oil discoveries. Wandilo South 1 failed to intersect commercial oil.<br />
The two discovery wells will be tied in during early 2011/12 and further development and appraisal drilling is<br />
planned. These wells continued the run of new field discoveries in the area over the past five years.<br />
A number of production enhancement operations on production wells were also undertaken during the period<br />
and were continuing.<br />
7