CHPRC Monthly Performance Report March 2012<br />

<strong>and</strong> closed out RCR’s generated from the 90% design document review.<br />

CE assisted PFP staff in the resolution/actions taken section of condition report CR-2012-0662<br />

dealing with work planning <strong>and</strong> justification for energized work. This CR was initiated due to work<br />

associated with Lighting Panel J at PFP. The applicable references from PRC-PRO-SH-40435 Rev 0<br />

<strong>and</strong> DOE-0359 Rev 2 that should close the concern were provided to PFP staff.<br />

CE assisted PFP with AHJ approval on non-NRTL electrical connectors used on a roof load test<br />

robot. CE originated AHJ approval packages CHPRC-2012-05 <strong>and</strong> CHPRC-2012-06 that were AHJ<br />

approved on the basis of mil-spec st<strong>and</strong>ards <strong>and</strong> like-for-like replacement of existing legacy<br />

equipment.<br />

CE continued to chair <strong>and</strong> review/accept RCR dispositions for the Final design review of design<br />

documents for the 105 KW Annex Building. CE verified the acceptability of the 105 KW Annex<br />

Building contractor’s RCR dispositions <strong>and</strong> closed out RCR’s generated from the preliminary <strong>and</strong><br />

90% design document review.<br />

CE chaired the Quarterly Energy Facilities Contractor Group (EFCOG) Engineering Practices<br />

Working Group (EPWOG) teleconference. The focus of the call was on preparations for the EPWOG<br />

semi-annual meeting in Washington D.C. (Forrestal Building) May 1-2. Other upcoming meetings<br />

are a joint meeting in Las Vegas May 14-16 of the DOE <strong>Site</strong> Safety Officers, the DOE Facility<br />

Representatives, the EPWOG Cognizant System Engineers Subgroup <strong>and</strong> the EPWOG Fire<br />

Protection Subgroup <strong>and</strong> a meeting of the EPWOG Commercial Grade Dedication Subgroup in<br />

Vancouver Washington May 22-23.<br />

CE assisted W&FM with a work process to approve non-NRTL certified Ludlum br<strong>and</strong> radiation<br />

monitors. Current W&FM Ludlum br<strong>and</strong> radiation monitors in use have been accepted through<br />

NRTL certified through field evaluation. The AHJ has agreed to evaluate <strong>and</strong> approve future<br />

procurements of Ludlum br<strong>and</strong> radiation monitors of the same model type, based on the NRTL field<br />

evaluation. W&FM will contact CE in the future when the Ludlum br<strong>and</strong> radiation monitors are<br />

received to start the AHJ evaluation <strong>and</strong> approval process.<br />

CE assisted 100K with procurement of non-NRTL certified electrically powered pallet trucks. CE<br />

checked NRTL listing directories <strong>and</strong> found no alternative NRTL certified pallet trucks were<br />

manufactured. CE provided 100K with a procurement process to order the non-NRTL electrically<br />

powered pallet trucks <strong>and</strong> have them drop shipped to an NRTL field evaluator (CE provided an<br />

NRTL field evaluator Point of Contact to 100K).<br />

CE issued a <strong>Hanford</strong> Lessons Learned Information Bulletin regarding failed control components in<br />

wall-hung electric room heaters installed at S&GRP DX <strong>and</strong> HX pump <strong>and</strong> treat facilities.<br />

CE completed initial procurement paperwork <strong>and</strong> approved the procurement requisition within<br />

passport for procurement of HEPA filters for WCH at the 324 building.<br />

Communications<br />

Internal<br />

Published six issues of the Weekly Update, CHPRC’s weekly news bulletin, including one special<br />

issue with updates from the President’s Office. The bulletin included blog messages from Ty<br />

Blackford, Vice President of Waste & Fuels Management <strong>Project</strong>; Moses Jaraysi, Vice President of<br />

Environmental Program & Strategic Planning; Vicki Bogenberger, Vice President <strong>and</strong> Chief<br />

Financial Officer; John Lehew, President <strong>and</strong> Chief Executive Officer; <strong>and</strong> Al Cawrse, Director of<br />

Environmental Protection.<br />

Produced three episodes of In<strong>Site</strong>, the weekly internal news broadcast, <strong>and</strong> a special message from<br />

C-10<br />

CHPRC-2012-03, Rev. 0 · <strong>Appendix</strong> C