18.01.2014 Views

implementation of a ppp transaction in the rural water sector in uganda

implementation of a ppp transaction in the rural water sector in uganda

implementation of a ppp transaction in the rural water sector in uganda

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Results <strong>of</strong> <strong>the</strong> Tender Process<br />

• The majority <strong>of</strong> <strong>the</strong> <strong>in</strong>vestment is funded by GPOBA <strong>in</strong> Busembatia<br />

• However <strong>the</strong> new Private Operator needs to pre-f<strong>in</strong>ance <strong>the</strong> GPOBA grant<br />

(approx USD270,000)<br />

• The GPOBA grant is released upon certificate <strong>of</strong> commission<strong>in</strong>g and<br />

verification <strong>of</strong> output<br />

• The tariff level and <strong>the</strong> tariff adjustment procedures are predef<strong>in</strong>ed and<br />

<strong>in</strong>cluded <strong>in</strong> <strong>the</strong> contracts with <strong>the</strong> private operators<br />

24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!