20.01.2014 Views

BMR HORSE RIDING WORK PLAN

BMR HORSE RIDING WORK PLAN

BMR HORSE RIDING WORK PLAN

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Action Reserve PoM Change Other actions<br />

required<br />

Timeframe<br />

Create “shared use” trails between<br />

horse riders and walkers:<br />

<br />

<br />

The Rock Lookout Trail<br />

Rileys Lookout Loop Trail<br />

Blue<br />

Mountains<br />

National Park<br />

(Rileys Mt<br />

Precinct)<br />

Requires<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Implement gate key<br />

borrowing system<br />

Years 2-3 – by March 2016<br />

Further investigate horse riding<br />

opportunity through the<br />

establishment of new bridle trails<br />

which link with existing trails:<br />

Waterboard Trail extension Blue<br />

Mountains<br />

National Park<br />

Requires<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Undertake environmental<br />

assessment<br />

Years 2-3 – by March 2016<br />

Jenolan River Trail extension Jenolan Karst<br />

Conservation<br />

Reserve<br />

Requires<br />

amendment and<br />

endorsement of<br />

Draft Plan of<br />

Management<br />

Undertake environmental<br />

assessment<br />

Not a priority<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!