Vigaun Bridge (PDF) - SSF Ingenieure
Vigaun Bridge (PDF) - SSF Ingenieure
Vigaun Bridge (PDF) - SSF Ingenieure
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1<br />
Steel girders<br />
The steel girders are cut in the steel plant according to the dowel<br />
cutting line. The necessary camber of the tension-free workshop<br />
form is achieved with the three-point bending method. In the<br />
workshop, the front plates are welded to the ends of the rolled<br />
girders with DHY welds.<br />
In the neighbouring coating plant, the steel girders were protected<br />
agains corrosion with the coating system for protection class<br />
S5 according to RVS.<br />
2<br />
3<br />
Picture credits: Florian Schreiber Fotografie for <strong>SSF</strong> <strong>Ingenieure</strong> GmbH<br />
Picture credits: 1 + 4 <strong>SSF</strong> <strong>Ingenieure</strong> GmbH / 2 Arcelor Mittal / 3 Florian Schreiber Fotografie for <strong>SSF</strong> <strong>Ingenieure</strong> GmbH<br />
4<br />
1 Cross section of <strong>Vigaun</strong> bridge<br />
2 Oxy-cutting of the rolled girders<br />
3 Corrosion-resistant girder after transport<br />
to the precasting plant<br />
4 Longitudinal section of <strong>Vigaun</strong> bridge