You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>TORQUE</strong> <strong>WRENCHES</strong><br />
The importance of torque control<br />
Fastening a threaded fastener in a controlled manner is essential for<br />
operational safety and the long service life of screws and bolts. Manual<br />
fastening without any torque control is a safety risk.<br />
Depending on personal constitution, the screwed fi tting can be over-tightened<br />
and there is the risk of breakage or the screwed fi tting can become loose and<br />
open with very low application of force.<br />
A torque wrench that has been calibrated regularly helps to achieve the<br />
specifi ed fastening torques or avoids over-tightening.<br />
Confidence is good -<br />
torque control<br />
is better!<br />
Competence and service<br />
Our competence is expressed by the measuring instruments and test<br />
equipment used by us, which are monitored continuously and, if required,<br />
adjusted, by a laboratory that is accredited by the DKD (German Calibration<br />
Service). They are calibrated by comparing them with standard reference<br />
units, which are traceable to the national standards.<br />
This ensures our competency in the fi eld of controlled fastening of screws and,<br />
in the long term, the quality of our torque wrenches and equipment.<br />
Torque wrenches and torque test instruments are measuring tools; just as any<br />
other measuring tool, they must also be serviced regularly and calibrated with<br />
suitable measuring instruments and, if required, adjusted. The test interval<br />
periods depend on the frequency of use.<br />
Our service includes the affordable requirement of both<br />
the normal calibration certifi cate in accordance with<br />
DIN EN ISO 6789 and on request, the calibration<br />
certifi cate in accordance with DKD (German<br />
Calibration Service) guidelines.<br />
We maintain, calibrate and adjust those of our own<br />
manufacture within 5 working days after goods are<br />
received in accordance with the DIN EN ISO 6789<br />
standards including the factory test certifi cate and the<br />
control sticker.