10.04.2014 Views

NGI highlights

NGI highlights

NGI highlights

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>NGI</strong> annual OTC<br />

reception<br />

The best opportunity at OTC to meet<br />

friends and colleagues from the<br />

geosciences!<br />

8. May 2013 at ZaZa


<strong>NGI</strong> organization<br />

Managing Director<br />

Lars Andresen<br />

Ingrid Malnes<br />

Kjell Karlsrud, Knut H. Andersen,<br />

Farrokh Nadim<br />

Finance and Accounting<br />

Mimoun Bouhmidi<br />

HR and Information<br />

Inger Kristine Tovslid<br />

Quality Assurance and HSE<br />

Geraldine Sørum<br />

IT Services<br />

Stein Strandvik<br />

Subsidiary<br />

<strong>NGI</strong> Inc. (USA)<br />

Audun Hauge<br />

Technology innovation<br />

James Michael Strout<br />

Offshore Energy Environmental Engineering Natural Hazards Building, Construction and Transport.<br />

Karl Henrik Mokkelbost Anne Kibsgaard Anders Solheim Ørjan Nerland<br />

Offshore Geotechnics<br />

Thomas Langford<br />

Water and Resources<br />

Arne Pettersen<br />

Avalanches and Rock Slides<br />

Ulrik Domaas<br />

Onshore Foundations<br />

Magnus Rømoen<br />

Instrumentation and Monitoring<br />

Dag Tollefsrud<br />

Contaminants and Land Use<br />

Paul Sverdrup Cappelen<br />

Debris Slides and Georisk<br />

Bjørn G. Kalsnes<br />

Field Investigations<br />

Kristoffer Kåsin<br />

Petro.Geomech. and –physics (PGG)<br />

KH Mokkelbost<br />

Geomapping<br />

Andreas Aspmo Pfaffhuber<br />

<strong>NGI</strong> Trondheim<br />

Randi Skirstad Grini<br />

Computational Geomechanics<br />

Karin Norèn-Cosgriff<br />

Eng. Geology and Rock Mech.<br />

Roger Olsson<br />

Laboratory and Model Testing<br />

Morten Andreas Sjursen


Some practical issues<br />

• Safety<br />

• Parking validation<br />

• Email addresses & invitations + name tags<br />

The Boss<br />

Dewey, Cheetum and Howe<br />

59 Estreet


Your hosts this afternoon<br />

From <strong>NGI</strong> inc<br />

Audun Hauge<br />

Knut Schrøder<br />

Francisco Hernandez-Martinez<br />

Young Jae Choi<br />

Amir Rahim<br />

Victor Taboada<br />

Gokhan Saygili<br />

From <strong>NGI</strong><br />

Lars Andresen<br />

Suzanne Lacasse<br />

Maarten Vanneste<br />

James (Jim) Strout<br />

Øyvind Torgersrud<br />

Dag Tollefsrud<br />

Morten Saue<br />

Thomas Langford<br />

Karl Henrik Mokkelbost


Topics this afternoon<br />

<br />

<br />

<br />

<br />

<br />

Time effects on piles – outcome from JIP<br />

Schmertmann Research lab – operating<br />

Earth Quake loads on pipelines<br />

Offshore wind<br />

<br />

Proposal for new JIP on piles<br />

<br />

Final remark


From onland and offshore geotechnics<br />

Time effects on pile capacity<br />

A JIP project organized by <strong>NGI</strong><br />

Work by Dr Kjell Karslrud


Objective: Establish practical design<br />

procedures that account for effects of time<br />

on the axial bearing capacity of piles<br />

Elements:<br />

‣ Collect and sumarise available data on time effects axial bearing<br />

capacity<br />

‣ Perform new pile load tests in the field, with specific focus on time<br />

effects:<br />

• 6 test sites<br />

• Pile tested: Open pipe piles, typically D=400 mm, L= 20 m<br />

‣ Develop new design procedures<br />

‣ Disseminate results to ensure that they get incorporated into<br />

national and international design guidelines and codes


Selected test sites<br />

1. Normally consolidated medium plastic clay – Onsøy ,Norway<br />

2. Normally consolidated low plastic clay, Stjørdal, Norway<br />

3. Stiff overconsolidated low plastic clay, Cowden UK<br />

4. Highly plastic OC clay in the sea at Femern, German coast<br />

5. Loose sand, Larvik, Norway<br />

6. Medium dense sand, Ryggkollen near Drammen, Norway


Load testing program at each site<br />

1(2)<br />

3(4)<br />

6(8)<br />

12<br />

24<br />

Pile<br />

No.<br />

Months<br />

Months<br />

Months<br />

Months<br />

Months<br />

1 x x x x x<br />

2 x x x x<br />

3 x x x<br />

4 x x<br />

5 x<br />

6 x Sust.<br />

at<br />

60%<br />

Sust.<br />

at<br />

60%<br />

x


Some of the key findings<br />

‣ The results confirm a significant ageing effect.<br />

‣ For piles in clay the effect reduces with increasing<br />

plasticity index and OCR of the clay.<br />

‣ For piles in sand the ageing effect seems in general<br />

to be even larger than in clay! The capacity may<br />

double over a two year period.<br />

‣ Repeated load testing on the same pile gives an<br />

incorrect picture of ageing effects.<br />

‣ Still possible to join the JIP – there are more work<br />

and more info that can be extracted from the program<br />

Work by Dr Kjell Karslrud


Schmertmann Research lab (SRL) – running


New Carbon fibre triaxial cell for tests in CT scanner<br />

New carbon cell that allows for anisotropic<br />

consolidation of rock plug<br />

X-ray imaging of rock core and saturation<br />

during flow and deformation testing<br />

• Main Features<br />

• Sample dimension 38 mm diameter, 100 mm length<br />

• Axial load 100 kN (88 MPa on 38 mm sample)<br />

• Radial confinement: 70 MPa<br />

• Pore pressure: 70 MPa<br />

• Working temp. 140 deg C<br />

• Suitable for corrosive fluids<br />

• Balanced piston or external load frame.<br />

• Axial Vp, Vs, and R<br />

• Axial and radial strain measurements<br />

• 12 radial acoustic pinducers, fittings for 25 mm samples<br />

New


New direct shear box for testing on fractured material<br />

<br />

<br />

<br />

<br />

For testing of intact or fractured rock<br />

Measure direct shear strength, friction and<br />

deformation behavior<br />

Conductivity of fracture during normal<br />

stress and shear at high stresses<br />

Applications related to CO2 storage and<br />

testing of shale gas<br />

Main Features<br />

• Max specimen dimensions 150x150x300 mm.<br />

• Max shear force: 250 kN<br />

• Max shear displacement: 100 mm<br />

• Max normal force: 500 kN<br />

• Max pore pressure: 2 MPa<br />

• Max flow gradient: 4 MPa<br />

• Future option for ultrasonic velocity transducers<br />

Test on<br />

Natural<br />

Fracture in<br />

shale<br />

Before test<br />

After test


CGM<br />

Pipelines under earthquake-induced soil movements<br />

• Pipelines traversing slopes are<br />

subjected to down slope movements<br />

of slopes during earthquakes.<br />

• In moderate to steep slopes in deep<br />

water one could expect down slope<br />

displacements larger than 1 m under<br />

even moderate earthquake events.<br />

• As part of JIP (Earthquake Effects in<br />

Deep Water) at <strong>NGI</strong> a solution has<br />

been developed for computing forces<br />

in pipelines over slopes. The solution<br />

is based on computing accelerations<br />

along the slope, and applying them to<br />

3-D FE model of pipeline supported<br />

on strain-softening springs.<br />

Contours of permanent displacements<br />

Deformations due to earthquake<br />

Work by Amir Kaynia


Sample results of<br />

analyses<br />

Maximum forces along<br />

pipeline during<br />

earthquake<br />

Maximum axial force (kN)<br />

2 500<br />

2 000<br />

1 500<br />

1 000<br />

500<br />

0<br />

-500 0 500 1 000 1 500 2 000 2 500<br />

Distance along pipeline (m)<br />

Maximum bending<br />

moment along pipeline<br />

during earthquake<br />

Max. bending moment (kNm)<br />

80<br />

70<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

-500 0 500 1 000 1 500 2 000 2 500<br />

Distance along pipeline (m)<br />

Work by Amir Kaynia


From Offshore geotechnics<br />

Offshore wind energy development – North Sea<br />

<strong>NGI</strong> projects include the last 10 years:<br />

<br />

<br />

<br />

<br />

Classic soil investigations<br />

Laboratory testing<br />

Foundation design for jackets and<br />

Gravity base towers<br />

Studies on foundation types.<br />

More info OWF Thursday morning<br />

Morten Saue Key note at OTC<br />

Dolwin 2, Aibel


Dolwin 2, Aibel


Subsea Leak Detection (SLD) system<br />

In place overview


Concept:<br />

Modular instrument node on subsea network<br />

Lifting yoke<br />

with Imenco connector<br />

“Mobile”<br />

Instrument<br />

module<br />

In operation<br />

Bullseye<br />

Parking slots<br />

for ROV stabs<br />

“Permanent”<br />

Seabed frame


Instrument Module<br />

Not visible in this image:<br />

sensors for measuring<br />

dissolved methane<br />

Horizontal<br />

Scanning<br />

Sonar head<br />

Vertical<br />

Scanning<br />

Sonar head<br />

Parked<br />

Aquadopp<br />

Current meter


Prototype system installation<br />

Seabed frames<br />

Monitoring modules and riser umbilical<br />

Docking Instrument module to seabed frame<br />

Hooking up COM and power line<br />

“Watch tower” on duty<br />

Subsea images: DeepOcean (responsible for installation)<br />

Subsea image: Stinger Technology AS<br />

PM at <strong>NGI</strong> was Dag Tollefsrud<br />

Jim Strout


NEW JIP on pile design??<br />

Suzanne has some ideas on that!


Proposal for a JIP<br />

Reliability of API, <strong>NGI</strong>, ICP, UWA and Fugro<br />

Axial Pile Capacity Calculation Methods<br />

• A joint effort<br />

• Needs sponsorship


Motivation<br />

• In our designs, we need to ensure the same level<br />

of safety for the new pile capacity (read CPT)<br />

methods as for the API method.<br />

• The designer is required to select an appropriate<br />

safety factor when using the CPT methods.<br />

• One can choose to be conservative and apply a<br />

“high” safety factor, or one can document the<br />

level of safety and “calibrate” the required safety<br />

factor(s) that ensures a target level of safety.


Motivation<br />

The industry needs<br />

• Guidelines on the safety factor to use with the<br />

”newer” CPT methods.<br />

• A consensus on the model uncertainty in the methods<br />

(will reduce the uncertainty and thereby reduce the<br />

probability of failure).<br />

• The most cost-effective design as possible for piles<br />

(e.g. reduce pile penetration depth where possible).


Three targets<br />

• Calibration of material factor for enough case studies<br />

so that one can generalise conclusions (OTC paper<br />

gives results for two sites that are site-specific)<br />

• Consensus on pile load test database, and<br />

publication of the database on the web<br />

• Transfer conclusions to design guidelines (API,<br />

ISO/OGP)


Modus operandi - Operator and ”expert ” involvement<br />

Calibration of safety factor(s)<br />

3-4 sites mainly clays; 3-4 sites mainly sand;<br />

3-4 sites intermixed; 2-4 sites w/ ”unusual” cond.<br />

Each sponsor to provide 2-3 case studies<br />

Sponsors can send own staff to <strong>NGI</strong> to do analyses for their<br />

own case studies<br />

Consensus on pile load test database and web publication<br />

Start with UWA’s careful work<br />

Find new large dia pile load tests<br />

Panel of experts (e.g. Jardine, Lehane, Jeanjean, Gilbert,<br />

Senders, Frimann Clausen etc) to accept/reject load<br />

tests to be included in ”consensus database”<br />

(parameters, interpretation of pile load tests, backcalculation).<br />

Job is not done until we have agreement.<br />

Complete the work in first 2 ½ years of 4-yr project.


Deliverables<br />

Calibration of material factor<br />

• 14-16 case studies (3 already done)<br />

• Method and examples<br />

‣Quantify uncertainties in soil parameters<br />

‣Quantify model uncertainty, including how to include<br />

uncertainty for large pile diameters, low plasticity, etc<br />

‣Uncertainties in effects of cyclic loading and of time on<br />

pile capacity<br />

‣Uncertainty in pile capacity and P f<br />

‣Calibration of safety factor(s).


Deliverables<br />

Consensus on pile load test database<br />

• No more discussion on which test gave what result,<br />

on ”our interpretation is more reliable than yours”!<br />

• Flexible database where on can include new pile<br />

load tests<br />

• Solution for the custody of web site and database<br />

after the JIP is completed


Proposed budget and sponsorship<br />

Budget<br />

• Calibration of material factor<br />

USD 2,2 M over 4 years<br />

• Consensus on pile load test database<br />

USD 1 M over 2 ½ years<br />

Sponsorship<br />

• 8 sponsors @ USD 100,000/yr × 4 yrs or<br />

• 10 sponsors @ USD 80,000/yr × 4 yrs<br />

Next step


<strong>NGI</strong> Inc – Change of President<br />

Knut Schrøder 2002 – 2008<br />

Stein Strandvik 2008 – 2010<br />

Audun Hauge 2010 – 2013<br />

Morten Saue 2013 ->

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!