Why Porous Pavement? - Lake George Association
Why Porous Pavement? - Lake George Association
Why Porous Pavement? - Lake George Association
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Traffic Loads and Counts<br />
Maine Mall Road<br />
– .35 miles length<br />
Beach Road<br />
– .8 miles length<br />
– AADT 16,750 vehicles per day<br />
– AADT 8,200 vehicles per day<br />
– ESALs 3,277,700<br />
– ESALs ~1.2 the Maine #<br />
– Design hourly volume 2,412<br />
– Design hourly volume 772<br />
– Heavy Trucks 5%<br />
– Heavy Trucks 5%<br />
Summary: Beach Road is about ½ (or less) of the traffic<br />
loads than the Maine Mall Road <strong>Porous</strong> <strong>Pavement</strong> Project