04.05.2014 Views

OIL INDIA LIMITED (A Govt. of India Enterprise) Contracts ...

OIL INDIA LIMITED (A Govt. of India Enterprise) Contracts ...

OIL INDIA LIMITED (A Govt. of India Enterprise) Contracts ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Tender No. DCO9894P11/KB<br />

SOQ<br />

safe execution <strong>of</strong> the job are<br />

to be supplied by the<br />

contractor.<br />

- To clean Syphon <strong>of</strong><br />

Formation Water Tank. The job<br />

involvement is as<br />

follows:<br />

Dismantling <strong>of</strong> syphon system<br />

from the tank after opening<br />

all necessary<br />

tank fittings, bolts & nuts<br />

etc., cleaning <strong>of</strong> sand, scale<br />

etc. from<br />

inside the syphon pipe,<br />

refixing <strong>of</strong> syphon system to<br />

the tank. For<br />

lifting <strong>of</strong> syphon pipe etc.,<br />

necessary lifting arrangement<br />

will be<br />

provided by <strong>OIL</strong>.<br />

20 Emulsion Treater Cleaning: Job 200.000<br />

To clean 5000/ 3500 Bbls<br />

Emulsion Treaters. The job<br />

involvement is as<br />

follows:<br />

Isolation <strong>of</strong> the pressure<br />

vessel from the flow-stream<br />

<strong>of</strong> the<br />

installation and its<br />

depressurization, removal/<br />

skimming <strong>of</strong> oil, opening<br />

<strong>of</strong> 2 (two) nos. <strong>of</strong> oval<br />

shaped manhole doors by<br />

unscrewing bolts and<br />

nuts, removing <strong>of</strong> gaskets,<br />

use <strong>of</strong> pressurized water<br />

inside the vessel<br />

with flexible rubber hose,<br />

removing <strong>of</strong> sand, scale etc.<br />

using spade,<br />

shovel or tools <strong>of</strong> such kind<br />

to scrap <strong>of</strong>f any deposited<br />

sand, scale etc,<br />

fixing up <strong>of</strong> the manhole<br />

doors with proper gaskets,<br />

closing <strong>of</strong> 4" drain<br />

valve and testing the vessel<br />

up to the working pressure <strong>of</strong><br />

the vessel<br />

for 24 hours, removal <strong>of</strong><br />

sand, deposits etc. from the<br />

site <strong>of</strong> the vessel<br />

and transfer the same to<br />

suitable site shown by the<br />

Installation<br />

Contractor 2 Company

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!