Bicol Integrated Fiber Coconut Processing Project
Bicol Integrated Fiber Coconut Processing Project
Bicol Integrated Fiber Coconut Processing Project
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
easibility Study of a Small Decorticating Machine<br />
NE MONTH OPERATION (2003) ONLY RAW FIBER<br />
Per month<br />
<strong>Project</strong>ed Expenses<br />
HUSKS (182,000) 9100<br />
HAULING 40,950<br />
LABOR 23,400<br />
ELECTRICITY 19500<br />
DRYING 6500<br />
BALING 3900<br />
BAGGING 8580<br />
SUPERVISOR 8000<br />
BOOKEEPER/CLERK 6000<br />
Misc.Off. Expenses 5,500<br />
Maintenance/Depreci<br />
ation<br />
8300<br />
TOTAL 139,730<br />
<strong>Project</strong>ed Income<br />
<strong>Fiber</strong> (26 tons) 143,000<br />
Cocopeat 5720<br />
sacks<br />
85,800<br />
TOTAL 228,800