26.05.2014 Views

Download this document

Download this document

Download this document

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Future Issue<br />

‣ Better location data to facilitate coordination<br />

• BPA Project Action Effectiveness may require “Juvenile<br />

Density” or “Adult Escapement” and does not want to<br />

duplicate effort between BPA and non BPA funded M&E<br />

‣ Limitation on ESA Take:<br />

• Proper planning to reduce take on populations below<br />

critical thresholds<br />

‣ Metadata <strong>document</strong>ation need to be complete<br />

‣ Completed reports (BPA executives have poor opinion of<br />

RM&E Reports and timeliness)<br />

‣ Provision of electronic data capture tools:<br />

• require standard method data entry forms<br />

• Managed under 1 BPA project to ensure cheep equipment<br />

‣ Data Sharing Agreements

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!