BUILDSOFT PTY LTD<br />
SUBSTRUCTURE<br />
SUBSTRUCTURE (Cont)<br />
(Cont) LEVEL B2<br />
(Cont) Reinforced concrete, to the<br />
following<br />
A Slab on ground, include for trimming<br />
and grading, termite treatment,<br />
basecourse, sand bed, waterpro<strong>of</strong><br />
membrane and monolithic finish, as<br />
required<br />
m2 2219 47.30 104,958.70<br />
Concrete blockwork, to the following<br />
B Lift pit walls<br />
C Eastern and Western perimeter<br />
retaining walls, include for<br />
reinforcement, core filling,<br />
waterpro<strong>of</strong> membrane, protection and<br />
special backfilling<br />
m2 46 174.80 8,040.80<br />
m2 248 129.31 32,068.88<br />
LEVEL B1<br />
Detailed excavation, to the following<br />
D Column footing pads (assumed 1300 x<br />
1300 x 1000 mm deep) :[10 No] m3 17<br />
E Footing to Western perimeter<br />
retaining walls<br />
F Strip footings to masonry walls<br />
m3 35 377.88 13,225.80<br />
m3 3 377.88 1,133.64<br />
Reinforced concrete, to the following<br />
G Column footing pads (assumed 1300 x<br />
1300 x 500 mm deep), include for<br />
formwork and reinforcement :[10 No] m3 11<br />
H Footing to Western perimeter<br />
retaining walls, include for<br />
formwork and reinforcement :[33 m]<br />
J Strip footings to masonry walls,<br />
include for formwork and<br />
reinforcement :[11 m]<br />
K Slab on ground, include for trimming<br />
and grading, termite treatment,<br />
basecourse, sand bed, waterpro<strong>of</strong><br />
membrane and monolithic finish, as<br />
required<br />
m3 22 377.88 8,313.36<br />
m3 2 377.88 755.76<br />
m2 547 47.02 25,719.94<br />
BQ/4<br />
To Collection $ 194,216.88