Self Rostering<br />
continued<br />
Deliverables:<br />
The project team will<br />
• Take the results of the feasibility/scoping studies to the Programme Board<br />
• Take the accommodation options, outline design <strong>and</strong> indicative costs for the proposed<br />
stations to the Programme Board<br />
• In collaboration with the relevant senior managers in <strong>Service</strong> Delivery directorate <strong>and</strong><br />
consultants agree, the design requirements for the accommodation sites<br />
• In collaboration with relevant consultants manage the building alterations for the<br />
accommodation sites<br />
• Procure <strong>and</strong> install the furniture <strong>and</strong> equipment in the accommodation sites<br />
• In collaboration with the relevant senior managers in People <strong>Service</strong>s <strong>and</strong> <strong>Service</strong><br />
Delivery directorates, draft relevant protocols such as mobilisation times <strong>and</strong> notice<br />
periods to come off shift pattern, Conditions of <strong>Service</strong> for the proposed shift pattern<br />
<strong>and</strong> criteria for filling posts in the Self Rostering stations<br />
• In collaboration with the relevant senior managers in <strong>Service</strong> Delivery establish <strong>and</strong><br />
manage the internal <strong>and</strong> external communications strategy with all stakeholders<br />
• In collaboration with the Head of Business Support set up facilities management related<br />
contracts for accommodation sites<br />
• In collaboration with the Head of Information Communication Technology to arrange<br />
for additional ICT equipment <strong>and</strong> broadb<strong>and</strong> access.<br />
• To identify <strong>and</strong> report potential <strong>and</strong> actual efficiency savings achieved by the project.<br />
• In collaboration with the relevant senior managers in <strong>Service</strong> Delivery establish <strong>and</strong><br />
manage the internal <strong>and</strong> external communications strategy with all stakeholders<br />
18