How to Strengthen and Stabilize the Wellbore during Drilling ...
How to Strengthen and Stabilize the Wellbore during Drilling ...
How to Strengthen and Stabilize the Wellbore during Drilling ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
The Lost Circulation Problem: High-Risk Operations<br />
Fractured <strong>Wellbore</strong><br />
Pressure Gradient / Mud Density<br />
Frac Gradient<br />
Mud Weight<br />
Stable <strong>Wellbore</strong><br />
Collapsed <strong>Wellbore</strong><br />
Mud<br />
Weight<br />
Weak zone (depleted)<br />
0 30 60 90<br />
Well Inclination<br />
Deviated <strong>Wellbore</strong>s<br />
Pore<br />
Pressure<br />
Depleted Zones<br />
Deep Water