- Page 1 and 2: PUBLIC-PRIVATE PARTNERSHIP (PPP) OP
- Page 3: CONTENTS Executive Summary ........
- Page 7 and 8: • The existing Energy Law is bein
- Page 9 and 10: hydro tenders) and also clarificati
- Page 11 and 12: • Interviews with selected intern
- Page 13 and 14: 2. BACKGROUND - THE CURRENT SITUATI
- Page 15 and 16: issuing various permits for new pow
- Page 17 and 18: One way forward of course is to int
- Page 19 and 20: implementing the PPP project) and f
- Page 21 and 22: As has been highlighted in the tabl
- Page 23 and 24: scheme or RESS) in order to meet th
- Page 25 and 26: For “undiscovered” resources, t
- Page 27 and 28: certain period, and would proceed t
- Page 29 and 30: • Exploit Montenegro’s natural
- Page 31 and 32: • Developers and financial invest
- Page 33 and 34: In terms of the first of these dime
- Page 35 and 36: several laws, in comparison with th
- Page 37 and 38: 5. THE EMERGING PPP FRAMEWORK IN MO
- Page 39 and 40: Table 5.1: Key Activities and Roles
- Page 41 and 42: In the following sub-sections, we r
- Page 43 and 44: Comments We do not have specific co
- Page 45 and 46: Comments • Energy Sector Particip
- Page 47 and 48: 2. The role of the Enterprise for t
- Page 49 and 50: an investor has a guarantee of priv
- Page 51 and 52: asis to the legal situation by addi
- Page 53 and 54: tariffs for supply of tariff custom
- Page 55 and 56:
dealt with in the tender process an
- Page 57 and 58:
Draft Energy Law (see Section 5.2.2
- Page 59 and 60:
adhered to. If projects are deemed
- Page 61 and 62:
costs (e.g., connection and use-of-
- Page 63 and 64:
As noted above, one of the reasons
- Page 65 and 66:
Plan (either at the State or Munici
- Page 67 and 68:
14 Obtain Authorisation for Constru
- Page 69 and 70:
We see this as a potential advantag
- Page 71 and 72:
ensure adequate social impact asses
- Page 73 and 74:
important than in other countries s
- Page 75 and 76:
network connections (both transmiss
- Page 77 and 78:
3. Developing many of the required
- Page 79 and 80:
adequate to support a perfectly com
- Page 81 and 82:
As an example, it seems clear that
- Page 83 and 84:
through off-grid or projects which
- Page 85 and 86:
1. Defining the Conceptual Approach
- Page 87 and 88:
Table6.1: Near-Term Actions No. Act
- Page 89 and 90:
Table 6.3: Longer-Term Actions No.
- Page 91 and 92:
Stucky Ltd: Antoine Dubas, Director
- Page 93 and 94:
tariff which a developer receives 2
- Page 95 and 96:
An additional approach to dealing w
- Page 97 and 98:
Note: This table reflects the most
- Page 99 and 100:
Shape of Tariff Within a Year Curre
- Page 101 and 102:
Detailed Design A set of project do
- Page 103 and 104:
Cultural Heritage Ministry of Cultu
- Page 105 and 106:
Figure A3.2: Process of Approval fr
- Page 107 and 108:
Figure A3.4: Process of Approval fr
- Page 109 and 110:
Figure A3.6: Process of Approval fr
- Page 111 and 112:
ANNEX 4: CONNECTION ISSUES FOR MONT
- Page 113 and 114:
or charged to all users (via either
- Page 115 and 116:
1. A Feed-in Tariff which is differ
- Page 117 and 118:
Development / Planning Risk: Conces
- Page 119 and 120:
ANNEX 6: A BRIEF OVERVIEW OF THE EN
- Page 121 and 122:
Table A6.1: Structure of electricit
- Page 123 and 124:
Figure A6.2: Power plants, transmis
- Page 125 and 126:
• Project design and development
- Page 127 and 128:
Victoria, Australia The federal str
- Page 129 and 130:
water and sanitation sector (manage
- Page 131 and 132:
• Infrastructure Development Comp