program - Sunshine Coast Council
program - Sunshine Coast Council
program - Sunshine Coast Council
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PROGRAM: PARKS AND GARDENS<br />
CAPITAL WORKS PROGRAM: 2012/2013 - 2021/2022 (Draft) ($'000's)<br />
SubProgram AssetName Description Comments Division RoadName Suburb ID LifeCycle<br />
Recreation Park and<br />
Landscape Amenity<br />
Arthur Roberts Park Arthur Roberts Park 2010-11 Flying fox non compliant to new AS4685.<br />
upgrade to new Kompan Flying fox or compliance<br />
existing unit. Compliance upgrade $8k or New<br />
Kompan runway 30K can't see the value in new<br />
flying fox old unit with compliance will last an extra<br />
5 years min.<br />
Avocado Park Avocado Carramar Park playground Avocado / Carramar Park playground. Upgrade<br />
playground to complement BBQ Shelters and<br />
infrastructure in park Rocker elements have been<br />
refurbished 2009. Playground needs extend<br />
footprint to include spinner and replace timber<br />
sleepers with 200 x 150 contin<br />
Battalion Park Battalion Park renew playground This playground is situated 2 streets away from<br />
Pittards Rd Jewel Court Playground which has a<br />
multi aged combo unit that was refurbished 09. this<br />
Battalion Playground should be a different play<br />
experience from the traditional playground 2 streets<br />
away. F<br />
Bellflower Park Bellflower Pk exercise equipment Bellflower Park - installation of exercise equipment<br />
around pavement circuit - estimate allows two<br />
stations each containing 3 x static units, set on<br />
concrete base with rubberised softfall surfaces.<br />
10 Murray Grey Drive Kureelpa 14437 Renewal<br />
5 Carramar Drive Flaxton 14608 Renewal<br />
7 Nirvarna Court Buderim 14416 Renewal<br />
6 Creekside Drive Sippy Downs 14513 Renewal<br />
Budget<br />
2012/2013<br />
Forecast<br />
2013/2014<br />
Forecast<br />
2014/2015<br />
Forecast<br />
2015/2016<br />
Forecast<br />
2016/2017<br />
Forecast<br />
2017/2018<br />
Forecast<br />
2018/2019<br />
Forecast<br />
2019/2020<br />
Forecast<br />
2020/2021<br />
Forecast<br />
2021/2022<br />
Grand<br />
Total<br />
$39 $39<br />
$30 $30<br />
$51 $51<br />
$76 $76<br />
Ben Lexcen Drive Park Ben Lexcen Dr Pk - playground renewal High use by older school students high vandalism.<br />
Elements don't meet user age demographics.<br />
Remove 1994 worn equipment and replace with<br />
older age vandal resistant elements. Replace<br />
edging with 200 x 150 concrete profile replace bark<br />
with takura - Playgro<br />
Bradman Avenue Foreshore Bradman Avenue Foreshore Precinct M'Plan Staged implementation of Precinct Masterplan<br />
considering street calming, open space parkland,<br />
land-use zoning and flood mitigation outcomes.<br />
Maroochy River Foreshore - Precinct Masterplan -<br />
Staged implementation of<br />
Bradman Avenue, Recreation Park<br />
and Landscape Amenity - REGIONAL<br />
Chambers Island Playground Renewal<br />
Chambers Island Playground high use extreme<br />
environment on water surrounded Island. Elements<br />
rusted installed 2001 high maintenance has been<br />
upgraded and refurbished but needs extreme<br />
environmemnt elements stainless steel or hot dip<br />
gal after manufacture.<br />
11 Ben Lexcen Drive Sunrise Beach 14648 Renewal<br />
8 Bradman Avenue Maroochydore 14360 Upgrade<br />
8 Bradman Avenue Maroochydore 14615 Renewal<br />
$51 $51<br />
$395 $200 $200 $200 $200 $1,195<br />
$80 $80<br />
Implement Maroochy River Foreshore<br />
Staged implementation of Maroochy River<br />
Foreshore - Precinct Masterplan considering street<br />
calming, open space parkland, land-use zoning and<br />
flood mitigation outcomes.<br />
Buderim District Park Buderim District Park Implementation of the master plan for Buderim<br />
District Park<br />
Buderim Lions Park Buderim Lions Park Playground well used upgrade works required to<br />
maintain service level. Lions Park 2, Syd Lingard<br />
Rd: Replace kompan boat, spring toy<br />
Buderim Street Exercise equipment stations development Exercise equipment / stations (following exercise<br />
equipment design development for SCRC Parks &<br />
Gardens Landscape Infrastructure Manual is<br />
undertaken in 09/10) - Place on 09/10 CWP. Park<br />
is well utilised and would benefit from such<br />
exercise equipment / s<br />
Bulcock Street Caloundra Tree Replacement Bulcock Street Implementation of the fig tree replacement in<br />
Bulcick Street Caloundra<br />
Burnett Street, Recreation Park and<br />
Landscape Amenity - REGIONAL<br />
Buderim Lions Park Final Stage Deck<br />
Buderim Lions Park - Construction, Final Stage<br />
Deck - Construction of viewing deck as per detailed<br />
drawings and to complete total masterplan for site.<br />
Refer to previous stages project files for<br />
documentation<br />
8 Bradman Avenue Maroochydore 14496 Upgrade<br />
6 King Street Buderim 16482 New<br />
6 Syd Lingard Drive Buderim 14367 Renewal<br />
3 Buderim Street Currimundi 14529 New<br />
2 Bulcock Street Caloundra 16481 Rehab<br />
6 Burnett Street Buderim 14479 Upgrade<br />
$200 $200<br />
$200 $100 $100 $100 $100 $100 $100 $100 $100 $100 $1,100<br />
$30 $30<br />
$90 $90<br />
$33 $60 $70 $163<br />
$120 $120 $240<br />
Bushlands Drive Bushland Dr Playground Renewal No visablity from road, consider relocate or clear 11 Bushlands Drive Noosaville 14641 Renewal<br />
for visablity.elements worn condition 4 Rust and<br />
peel. Replace - Playground safety management<br />
$49 $49<br />
system elements worn<br />
Carriage Crescent Veg clearing DNRW Permit depends works Veg clearing ˜ DNRW Permit - depends on exact 1 Carriage Crescent Beerburrum 14544 Renewal<br />
works location. Playground equipment such as a<br />
flying fox or climbing net Playground equipment to<br />
$70 $70<br />
meet needs of local community<br />
Chaplin Park Chaplin Park, Noosaville Chaplin Park is a moderately profiled area on the 11 Gympie Terrace Noosaville 14390 New<br />
Noosaville riverfront that is cleared and underdeveloped.<br />
A plan setting out future improvements<br />
and potential uses. Areas of useable public land<br />
$51 $100 $151<br />
adjacent to the river are in high demand for active<br />
and p<br />
Charles Clark Park Design a Masterplan for Charles Clark Pk Design a Masterplan for Charles Clark park that is 4 River Esplanade Mooloolaba 16497 New<br />
adequate and meets the needs<br />
$16 $100 $100 $216<br />
Chatswood Park Chatswood Pk renew playground Playground audit report advises equipment must be 1 Bellvista Boulevard Little Mountain 14408 Renewal<br />
replaced around 2013/14. (Lot 900 Plan<br />
RP880698) Chatswood Park: upgrade playground<br />
$43 $43<br />
equipment, namely: Man-O-War 4 Deck Unit<br />
including softfall and drainage.<br />
Clarke Place Clarke Place - Landscape Masterplan Landscape Master Plan 2 Bulcock Esplanade Caloundra 16592 New $50 $150 $150 $350<br />
Clarke Place Park Clarke Place Park, Replace Ozplay unit Peplace Ozplay Unit in Clarke Place Park 2 Bulcock Esplanade Caloundra 16483 Renewal $47 $47