The corrosion monitoring of flash chambers (in the brine flashing zone) and water boxes<br />

in desal unit # 100 and 200 was carried out in lower (4, 6-9), middle (10-12) and last<br />

(19) stages of evaporator and 5-6, 7-8, 9-10 and 11-12 stages of water box. Weight loss<br />

and polarization resistance measurements were used to determine corrosion rates.<br />

Stainless retractable corrosion coupon holders carrying carbon steel or cupronickel<br />

samples were fixed in flash chambers or water boxes for weight loss measurements.<br />

Electro-chemical polarization probes fixed with carbon steel or cupronickel electrodes<br />

were used to measure corrosion rates at regular time intervals. For weight loss<br />

measurements in flash chambers or water boxes, the exposure time varied from 45 days<br />

to 130 days.<br />

Analysis of corrosion data from electrochemical studies and weight loss measurements<br />

indicated that by and large, overall corrosion rates of carbon steel and cupronickel in<br />

flashing brine and water box, respectively, were well within allowable range.<br />

Modification in the present methodology for improving the levels of accuracy and<br />

reliability and its implications on plant operation are discussed.<br />

<strong>Vapor</strong> Phase Corrosion Monitoring of Al-Khafji MSF Desalination Plant<br />

<strong>SWCC</strong> Al-Khafji MSF desalination plant was commissioned in 1985. It has a designed<br />

capacity of producing 22727 m 3 /d (5 MIGD). There are 2 desal units (# 100 and # 200),<br />

each unit has 22 stages. The material information and construction particulars for the<br />

evaporator and the water boxes are provided in Table 2. This plant is an additive dosed<br />

plant and in this plant no chemical scavenging of oxygen of make-up is carried out.<br />

<strong>Vapor</strong>-side corrosion monitoring for this project was carried out in unit # 100 of this<br />

plant.<br />

2. OBJECTIVES<br />

Following are the objectives of the project on Corrosion Monitoring in Al-Khafji<br />

Desalination Plant:<br />