Organisational Kitchen Fittings Drawer and Front Extensions - Hafele
Organisational Kitchen Fittings Drawer and Front Extensions - Hafele
Organisational Kitchen Fittings Drawer and Front Extensions - Hafele
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Organisational</strong> <strong>Kitchen</strong> <strong>Fittings</strong><br />
<strong>Drawer</strong> <strong>and</strong> <strong>Front</strong> <strong>Extensions</strong><br />
Accessories<br />
TOUCH LATCH SENSO Synchronization unit<br />
• Area of application: To synchronize the runner<br />
• Material: Aluminium, zinc alloy<br />
Carcase width Panel thickness Cat. No.<br />
450 mm 16 mm 557.99.145<br />
600 mm 557.99.160<br />
900 mm 557.99.190<br />
1,200 mm 557.99.196<br />
450 mm 19 mm 557.99.146<br />
600 mm 557.99.161<br />
900 mm 557.99.191<br />
1,200 mm 557.99.197<br />
Packing: 1 pc.<br />
TOUCH LATCH SENSO Synchronization unit for cut to size<br />
Rail<br />
Lever<br />
Version<br />
Cat. No.<br />
Synchronization rail, length 1,080 mm 557.99.100<br />
Synchronization lever 557.99.101<br />
Packing: 1 pc.<br />
5<br />
TOUCH LATCH SENSO Drilling jig<br />
• Version: To accurately drill the locking unit for the<br />
TOUCH LATCH SENSO runner<br />
Cat. No.<br />
558.18.131<br />
Packing: 1 pc.<br />
We reserve the right to alter specifications without notice (SEA Basic 2008/09).<br />
Instructions for use:<br />
1. Depending on nominal length, insert the stop pin into the drilling jig<br />
<strong>and</strong> position jig against the cabinet.<br />
2. Position the drilling jig on the installed TOUCH LATCH SENSO runner.<br />
3. Drill the two fixing holes for the locking unit.<br />
New products <strong>and</strong> systems: www.hafele.com<br />
SEA 5.27