26<br />
Independent <strong>Transport</strong> <strong>Safety</strong> & Reliability<br />
Regulator v Australian <strong>Rail</strong> Track<br />
Corporation 2010<br />
The ARTC was convicted over a rail line incident in the Hunter Valley<br />
that occurred three years ago which resulted in the death of two<br />
maintenance workers. ARTC was fined for a breach of the NSW <strong>Rail</strong><br />
<strong>Safety</strong> Act 2002 for the incident that occurred at Singleton on 16 July<br />
2007. The ARTC pleaded guilty to a number of offences including:<br />
• Failing to have its safety management system (SMS) audit “call out”<br />
work sites and audit associated with “call out” worksite protection<br />
documentation<br />
• Failing to ensure its SMS in place on 16 July 2007 complied with the<br />
prescribed requirements in respect to its corporate risk register<br />
• Failing to ensure that its employees complied with its SMS by, as<br />
a minimum, working required by the Network Rule “No Authority<br />
Required” rule and completing a worksite protection plan prior to<br />
work commencing.<br />
The judgement can be found on:<br />
http://www.lawlink.nsw.gov.au/scjudgments/2010nswsc.nsf/6ccf7431c5<br />
46464bca2570e6001a45d2/31a84a535127fcc2ca25774f00822b2a?Open<br />
Document<br />