Norwegian Public Roads<br />

Administration<br />

• •<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong><br />

<strong>Inspections</strong><br />

D es embf>,2005


Norwegian Public Roads<br />

Administration<br />

<strong>Handbook</strong> <strong>for</strong><br />

<strong>Bridge</strong> <strong>Inspections</strong><br />

Desember 2005


Copyright<br />

Copyright © 2000-01-1 2 by Norwegian Public Roads Administration.<br />

A ll ri ghts reserved under the International Copyright Conventions. This book is part of the<br />

Norwegian <strong>Bridge</strong> Management System, developed and owned by the Publ ic Roads<br />

Admini strati on in Norway. and may not be reproduced in w hole or in part in any foml or by<br />

any means, electronic or mechani cal, including photocopyi ng, recording or by any<br />

infommtion storage and retrieval system now known or hcreancr invented, without tbe prior<br />

written permission of the Copyright holder.<br />

Exception:<br />

Any Customer of the Norwegian <strong>Bridge</strong> Management System is an authorised Copydght<br />

holder <strong>for</strong> thi s handbook with in their jurisdiction. This authorisation may be extcndcd by the<br />

Customer to any person or company within the borders of the nali ve country <strong>for</strong> a particular<br />

assignment. The Customer is also authorised to ut il ise thi s <strong>Handbook</strong> when they are involved<br />

in international assignments.


INTRODUCTION<br />

<strong>Bridge</strong> inspections are essential with regards to safeguard the bridges and keep properly management<br />

of the bridge assets. Assessment of risk and prediction of future conditions are all elements<br />

which a <strong>Bridge</strong> Management System has to deal with. The examination of the present c ondition and<br />

o f expected deterioration leads to the detenninati on o f strategies <strong>for</strong> the interventions. T he process<br />

is completed by the execution and control of the repairs. It is there<strong>for</strong>e obvious that consistent<br />

inspections of bridges are important , not only <strong>for</strong> the bridge safety as such, but also in order to keep<br />

the infrastructure sufficiently operating <strong>for</strong> the society.<br />

Hence that the Norwegian BMS is developed to facilitate all aspects of bridge maintenance and<br />

management, it contains additionally to the handbooks al so an advanced computerised system<br />

avai lable <strong>for</strong> handling both the required inventory, inspection and maintenance data. A complete,<br />

user-fri endl y, accurate, and compatible database constitutes the foundat ion of our bridg e management<br />

system.<br />

This Inspection <strong>Handbook</strong> has been prepared to coverthe requirements of the staffinv()lved in<br />

<strong>Bridge</strong> <strong>Inspections</strong>, and it provides thorough and detailed guidance on Damage Evalua ti on.<br />

Emphasis has been made 10 explaining a wide range of different types of damage on different Iy pes<br />

of structures by means of photos in connection with explanatory damage Evaluati on guiding. The<br />

photos have been used ex tensively to facilitate a better understanding as "seeing is beli eving".<br />

In the BMS, all data is intended to be stored in computers. To avoid mistakes and to make the<br />

System consistent with regard to th e computeri sation, a numerical code <strong>for</strong> di ffe rent typ es of damage<br />

and cause of damage have been introduced. These are presented in chapter 5 and irl the<br />

Appendi ces of the <strong>Handbook</strong><br />

References are made to different handbooks from the Norwegian Public Roads Admiinistration.<br />

These have 10 be altered with simular handbooks issued at the National Road Authori1y.


Foreword<br />

<strong>Inspections</strong> of hridges are among the main objectives which every<br />

Road Manager has to take serious in order to ful fi l its obligations<br />

to achi eve a safe and secure management, operation aJ1d maintenance<br />

orlhe country's bridges. Superior obligations atld requireme<br />

nts <strong>for</strong> the inspection of bridges arc stated in the "Guideli nes<br />

<strong>for</strong> the Management of <strong>Bridge</strong>s".<br />

This <strong>Handbook</strong> deals with all types of routine and per iodie inspections<br />

to be carried out on all bridges. <strong>Bridge</strong> inspcctio:n is defined<br />

as: "Visual checks of bridges combined with measurem ents and<br />

materials investi gations in order 10 determine the condition and<br />

safety level ofhridges. The <strong>Inspections</strong> shall identi fy 1he needs <strong>for</strong><br />

remedial actions, any req uired maintenance or repair activities in<br />

general and the strengthening or rebuilding of any bri c:ige within<br />

the jurisdiction o f the Road Manager".<br />

The purpose of the <strong>Handbook</strong> is to offer guidance on bridge<br />

inspections in order to provide a sustainable and unified system <strong>for</strong><br />

bridge inspectors th roughout the entire country.<br />

It is envisaged that every modem <strong>Bridge</strong> Managemen t System<br />

should have a databased computer system, handling both inventory,<br />

inspection and maintenance data. The foundation <strong>for</strong> detennining<br />

the repairs and maintenance activities on bridges w il l be the<br />

results oflhe bridge inspection data recorded in Brutu s<br />

International which also constitute the basis <strong>for</strong> the budget<br />

requirements when composing the budget. The BMS system provides<br />

recommendations <strong>for</strong> structura l maintenance an.d strategy.<br />

<strong>Bridge</strong> Inspectors are exposed to many ri sks during in spections,<br />

e.g. being struck by vehicles, fa lling from the super or. substructure<br />

etc .. Safety equipment, safety precautions and safety requirements<br />

are there<strong>for</strong>e important aspects to be included both in this<br />

<strong>Handbook</strong> and during the inspection procedures.<br />

The Inspection <strong>Handbook</strong> is developed by NPRA 's <strong>Bridge</strong><br />

Departme nt.<br />

This edition have been sl ightl y corrected compare to t he<br />

previous edition of February 200 I.<br />

The Directorate of Publ ic Roads,<br />

Desember 2005


TA BLE OF CONTENTS<br />

Introductiont<br />

Acknowledgements<br />

Foreword<br />

3<br />

4<br />

5<br />

I Inspection of <strong>Bridge</strong>s<br />

1.1 General<br />

1.2 Inspection Types<br />

2 Terminology<br />

2.1 Location System<br />

2. 1.1 General<br />

2. 1.2 The Consept of Division by Axis<br />

2.1.3 The Division by Axes <strong>for</strong> Big <strong>Bridge</strong>s<br />

2. 1.4 Location System when Beams<br />

2. 1.5 Reflected Plan of the Superstructure<br />

2. 1.6 Reflected Plan of Columns and Foundat ions<br />

3 Planning of Inspection<br />

3. 1 General<br />

3.2 Inspecti on Plan<br />

3.3 Inspection Programme<br />

3.4 Inspection Fonns<br />

3.5 Inspection Resources and Safety Precautions<br />

3.5. 1 General Req ui rements of the Inspectors<br />

3.5.2 Inspection Tools<br />

3.5.3 Safety Precautions<br />

4 Inspection Tools and Access Equipment<br />

4.1 Inspecti on tools<br />

4. 1.1 Personal/protective equipment<br />

4. 1.2 Ordinary Inspection Tools<br />

4.1.3 Inspection Tools <strong>for</strong> general inspection<br />

4. 1.4 Inspection Tools <strong>for</strong> Major Inspection<br />

4. 1.5 Inspection Tools <strong>for</strong> Special Inspection<br />

4. 1.6 Inspection Tools fo r Major Underwater-Inspec;tion<br />

4. 1.7 Inspection Tools <strong>for</strong> Major Cable-Inspection<br />

4.2 Access Equipment<br />

4.2. 1 General Inspection<br />

4.2.2 Other <strong>Inspections</strong><br />

4.2.3 Ladder<br />

4.2.4 Ordinal)' type of Lifts<br />

4.2.5 Types of <strong>Bridge</strong> Lifts<br />

4.2.6 Other types of Access Eq ui pment<br />

5 Damage Evaluation Fundamentals<br />

5.1 General<br />

5.2 Types of Damage<br />

5.3 Degree of Damage - Consequence of Damage<br />

5.3. 1 Degree of Damage<br />

12<br />

15<br />

21<br />

25<br />

41<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong><br />

7


5.4 Damage Eva luation<br />

5.4.1 Primary & Secondary Damage<br />

5.4.2 The Extent to which Damage has Developed<br />

5.4.3 Compound (Combined?) Damage<br />

5.5 Prioriti sing Maintenance<br />

5.6 Ca use(s) of Damage<br />

6 Carrying out In spections 59<br />

6. 1 Acceptance Inspection<br />

6. 1. 1 Scope 50<br />

6. 1.2 Visual Checking<br />

6.2 Warranty Inspection<br />

6.2.1 Scope<br />

6.2.2 Visual Checking<br />

6.3 Gcncral lnspecli on<br />

6.3.1 Scope<br />

6.3.2 Basic General lnspeclion<br />

6.4 Major inspection<br />

6.4.1 Scope<br />

6.4.2 Visual Inspection<br />

6.5 Major Inspection of Cables<br />

6.5.1 Objective and Scope<br />

6.5.2 V isual <strong>Inspections</strong><br />

6.6 Major Inspection · Underwater<br />

6.6.1 Scope<br />

6.6.2 Visual <strong>Inspections</strong><br />

6.7 Special Inspection<br />

6.7. 1 Scope of inspection<br />

6.7.2 Visual Checking<br />

6.8 Ma intenance Measures - Extent of Damage<br />

7 Surveys, Materials Tests and Instrumentation 83<br />

7. 1 General<br />

7.2 Surveys (Type of measurements)<br />

7.2.1 Levell ing<br />

7.2.2 Horizontal Distances/Disp lacement<br />

7.2.3 Measuring the Thickness of Wearing Surfaces<br />

7.2.4 Measuring of Ruts<br />

7.2.5 Measuring Evenness orthe Deck Surface<br />

7.2.6 Measuring Sag<br />

7.2.7 Recording <strong>Bridge</strong> Details<br />

7.2.8 Measuring ofVcrt ical Clearance<br />

7.3 Adequate Materials In vestigation - Concrete<br />

7.3.1 Locating the rcin <strong>for</strong>cemcn t - Measuring its Cover<br />

7.3.2 Measuring the Depth of Carbonation<br />

7.3.3 Measuring Chloride Content<br />

7.3.4 Corrosion Testing (EC P)<br />

7.3 .5 Detennining the Level of Strength<br />

7.3.6 Structural Analysis<br />

7.3.7 Inspecti on of Prestressed Tendons<br />

7.3.8 Cutting open the Concrete to Assess the Corrosion level<br />

7.3.9 Location of Materials Testing <strong>for</strong> Concrete Coastal <strong>Bridge</strong>s<br />

8 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


7.4 Adequate Materials Testing - Steel<br />

7.4. 1 Checking the Torque of Screws<br />

7.4.2 Checking Rivets and Scrcws<br />

7.4.3 Checking Welds<br />

7.4.4 X-ray Check<br />

7.4.5 Ultrasound Check<br />

7.4.6 Magnetic Powder Check<br />

7.4.7 Fibre Optics<br />

7.4.8 Ultrasound Measurement of Material Thickness<br />

7.5 Adequate Materia ls In vestigal'ions - Timber<br />

7.5. 1 Invcstigation o f the humid ity levcl of Timber<br />

7.5.2 Checking fo r Fungus and ROI- Timber<br />

7.6 Adequate Material s Investi gation - Stone<br />

7.6. 1 Compressive Strength <strong>for</strong> Stone<br />

7.7 Adequate chccking ofthc Surface Trcatment<br />

7.7. 1 Thickness of Surface Coating - Concrete<br />

7.7.2 Adhesive bonding between Surface Coating a:nd Concrete<br />

7.7.3 Depth of Penetration of Water Repellent Improegnation<br />

7.7.4 Thickness of Surface Coaling of Steel<br />

7.7.5 Adhesive Bonding bctwecn Surface Coaling


9.3.8<br />

9.3.9<br />

9.3. 10<br />

9.3. 11<br />

9.4 Stone and Masonry Elements 227<br />

9.4. 1<br />

9.4.2<br />

9.4.3<br />

9.4.4<br />

9.4.5<br />

9.4.6<br />

9.4.7<br />

9.5 Timber Elements 24 1<br />

9.5.1<br />

9.5.2<br />

9.5.3<br />

9.5.4<br />

9.6 Wearing Courses & Waterproofin g Layers 259<br />

9.6.1<br />

9.6.2<br />

9.6.3<br />

9.6.4<br />

9.6.5<br />

9.6.6<br />

9.6.7<br />

9.6.8<br />

9.6.9<br />

9.6. 10<br />

9.7 Bearings & Bcaring Scats/Shelves 289<br />

9.7. 1<br />

9.7.2<br />

9.7.3<br />

9.7.4<br />

9.7.5<br />

9.7.6<br />

9.7.7<br />

9.8 Joints & Thresholds 297<br />

9.8.1<br />

9.8.2<br />

9.8.3<br />

9.8.4<br />

9.8.5<br />

9.8.6<br />

9.9 Parapets 305<br />

9.9.1<br />

9.9.2<br />

9.9.3<br />

9. 10 Water Drainage System 32 1<br />

9. 10.1<br />

9. 10.2<br />

10 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


9. 10.3<br />

9.10.4<br />

9.11 Other Equipment & Attached Utilities<br />

9. 11.2<br />

9. 11.3<br />

9.12 Codes<br />

327<br />

333<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong><br />

11


1. Inspection of<br />

<strong>Bridge</strong>s<br />

Guidel ines<br />

1.1 General<br />

Reference is made to "Guidelines <strong>for</strong> the Management of <strong>Bridge</strong>s"<br />

as superior guidance on management of bridges. To fu lfi I their<br />

obligations with regards to bridge management, the compUlerised<br />

Brutus International <strong>Bridge</strong> Management Syst.em (BMS) is<br />

intended to be the assisting tool <strong>for</strong> conducting the duties stated in<br />

the Guidelines.<br />

The planning of inspections, entering the results from pc rfonned<br />

inspections into the computerised part as well as composing and<br />

recommending all relevant remedial actions to be taken on<br />

bridges, sha ll be done by using the Brutus International.<br />

1.2 Inspection Types<br />

The inspection types re flect the thoroughness and frequency of<br />

inspections.<br />

The first In spectio ns<br />

The bridge inspection cycle starts when construction is completed<br />

at which point the fo llowing inspection types shall be pe:r<strong>for</strong>med:<br />

* Acceptance Inspection<br />

'" Warranty Inspection<br />

Ro ut ine Inspectio ns<br />

After the bridges have been handed over, routine inspect ions shall<br />

be carried out <strong>for</strong> the remaining bridge's service life time. This<br />

involves the following in spection types:<br />

'" General Inspection<br />

'" Major In spection<br />

'" Major Inspection of Cabl es<br />

'" Major Underwater lnspection<br />

Additio na l <strong>Inspections</strong><br />

General inspection intend to be carried out also during the warran·<br />

ty (guarantee) period.<br />

To complement the above mentioned inspections, or in tbe event<br />

of extraordinary occurrences there may be a need to perfonn:<br />

'" Special Inspection<br />

Purpose of Inspectio ns<br />

In the following, descriptions of purposes of the inspecti ons are<br />

outl ined. For more det"ailed descriptions, reference is ma de to<br />

Chapter 6 of this <strong>Handbook</strong> or to the "Guidel ines <strong>for</strong> the<br />

Management of Bri dges".


Acceptance Inspection<br />

Warranty Inspection<br />

General Inspection<br />

Major Inspection<br />

Major Inspection Cables<br />

Major Inspection<br />

Underwater<br />

Special Inspection<br />

The Acceptance Inspection is the first type of inspection to be carried<br />

out after the completion of a new bridge. The purpos e is to<br />

accept or not the acceptance criteria fo r the take-over res.ponsibility<br />

of the bridge owner, where the acceptance criteria is to uncover<br />

any deficiencies, damage or defects to the structure which have<br />

arisen during the construction phase, as well as identifyillg inappropriate<br />

design sol utions and any sources of deterioratio n that<br />

may be of significance in conjunction with future maintenance.<br />

Acceptance Inspecti on shall also be per<strong>for</strong>med after maj~ r rehabilitat<br />

ion or maintenance works have been carried out on a "bridge.<br />

The purpose of the Warranty Inspecti on is to chec k that a ny work<br />

done during the construct ion phase, or repairs following<br />

theAcceptance Inspection are acceptable, and that new damage,<br />

faults or de ficiencies have not occurred to the bridge.<br />

Any new sources of deterioration of relevance <strong>for</strong> later maintenance<br />

should also be identifi ed.<br />

The purpose of the General Inspection is to check if any serious<br />

damage affecting the load canying capacity, traffic safety, fu ture<br />

maintenance or environment/aesthetic have appeared to lhe structu<br />

re<br />

The purpose of Major Inspection is 10 ensure that the ent ire bridge<br />

is funct ional, detenn ining any needs <strong>for</strong> maintena nce actions<br />

including making cost estimates <strong>for</strong> these. The inspectioll includes<br />

also taking measurements and materials investi gations iEnecessary.<br />

The purpose of Major Inspection of Cables is to evaluate any damage<br />

to cables, hangers inclusive clamps and anchorage plOi nts to<br />

verify their funct ionali ty. Remedial actions incl usive cos.t estimates<br />

shall also be dctennined.<br />

The purpose of Major Underwater In spection is to check. the condition<br />

of any bridge elements unden.vater to ensure their fu nctionality.<br />

The river bed in the vicinity of the bridge shoul d also be<br />

checked. Remedial actions inclusive cost estimates shall be determined.<br />

The purpose of Special Inspection is to investigate close .. any damage<br />

and the cause of damage observed during previous inspections,<br />

but also to fonn the basis <strong>for</strong> any description of costly and/or<br />

complicated action wh ich might be recommended.<br />

Special inspections are not being carried out at regular intervals,<br />

but can be triggered off from the fo llowing:<br />

'" Requ irements from previous major inspections<br />

'" Accidents such as impact damage from vehicles<br />

'" Overloading<br />

'" Flood or flooding<br />

'" When experience from similar types of bridges and en-.i ronment<br />

so indicates


2 TERMINOLOGY<br />

Location System<br />

2.1 The location System<br />

2.1 .1 General<br />

It is important that everybody uses the same way to describe where<br />

a damage is located on a bridge and where measurem ents and<br />

material in vestigations are carried out. There<strong>for</strong>e, on all bridges, a<br />

localisation system shall be established to make this possible.<br />

The following sections illustrate how such a system can be<br />

planned by using axi s, the numbering of beams and the projection<br />

of columns, superstructure etc ..<br />

In case such a system has been prcviously establi shed <strong>for</strong> the<br />

bridge, thi s shall be continued or integrated in the new system.<br />

Divisio n by Axes<br />

2.1.2 The Concept of Division by Axes<br />

All bridges sha ll be di vided into an axis number by each abutment<br />

and each column. The div ision by axcs shall be recorded in BRU­<br />

TUS and thereby appear on the inspection fonns.<br />

The main rule is that the di vision being used on the construction<br />

draw ings or as built drawings shall be used.<br />

Numbering the<br />

Axes<br />

Ifno system with regard to axes has been used on the drawings,<br />

axis I (or axis 0) shall be placed at the abutment with the lowest<br />

kilometre in relation to the kilometre direction on the road. On the<br />

draw ings of the bridge, axis I shall be to the left. As a. reference,<br />

designations like column axis 2, superstructure ax.is 2-3 etc. shall<br />

be used.<br />

At the abutments the geographical di rection or the closest village<br />

sha ll be used to detennine the direction of a xes geographical. The<br />

division by axes can with advantage be marked with s pray on larger<br />

bridges. However, this must be done with care to a"Void a spoil-<br />

Figllre 2.1-1: Exumple o/Numbering rhe Axes<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong> 15


2.1.3 The Division by Axes <strong>for</strong> Big <strong>Bridge</strong>s<br />

For arch bridges, truss bridges, suspension bridges an


Hangers<br />

/ ® ®<br />

23456189<br />

Suspension <strong>Bridge</strong>s<br />

Figllre 2. 1-4: .'Vllmbering 'he AxeslHangers on Suspension Br idges<br />

Bundle of Cables<br />

Left hand-side<br />

6 5 432<br />

~ :<br />

Layers<br />

:mm<br />

Right tland-side<br />

123456<br />

Figllre 2. 1-5: .'VlIIl1bering 'he Cable Bundles 011 S1Ispellsioll liridges<br />

@ ®<br />

®<br />

Cable Stayed <strong>Bridge</strong>s<br />

2345678<br />

Connection ints<br />

Figure 2./-6: Dirisioll of Axis 0 11 Cable Stayed <strong>Bridge</strong>s<br />

Cross Sections<br />

2.1.4 Location System when Beams<br />

All cross sections shall be sketched looking in the direction of the<br />

chainage (nonna1l y identical to the direction of inc reasing axisnumbering).<br />

Designation of where the cross sectioll is taken can<br />

<strong>for</strong> example be axis 3 + 5 m, see Figure 2. 1-7.<br />

Left hand-side or right hand-side can be used to assign precise<br />

localisation of details of a cross section. Alternative ly,<br />

upstream/downstream or geographical directions c an be used.<br />

Cross secti ons of beams shall be assigned using letters, alternati<br />

vely numbers, marked from left to right.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 17


Numbering of Beams<br />

1 r<br />

~·~~'.~I VII! ~~> .. - ...<br />

Cross-section 01 Axis 3+5<br />

Figllre 2./-7: Cross Seclioll 0/(/ Be(/III <strong>Bridge</strong><br />

Reflected Plan of<br />

Superstructure<br />

2.1.5 Reflected Plan of the Superstructure<br />

In some cases it can be rel evant to make a reflected pl.an of the soffit<br />

of the superstructure in order to locate the defects and testing<br />

spots Exampl e of a refl ected plan of a beam bridge is shown in<br />

Figure 2. 1-8 and Figure 2. 1-9.<br />

- 1<br />

-<br />

2<br />

'V<br />

/'.<br />

Figllre 2./-8: Exampleo/Foldillg 0111 o/u Beam <strong>Bridge</strong><br />

18<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


Figure 2. 1-9: Example of a Reflecled Plan of a Box Girder BiI·illge<br />

2.1 .6 Reflected Plan of Columns and<br />

Foundations<br />

For rectangu lar columns, surface I shall be facing the lowest axis<br />

number. The remaining surfaces shall be numbered against the<br />

clockwise direction. The re flected plan shall make it possible to<br />

look at each surface in such a way that sides with jo intly comers<br />

are naturally tied together. The column is folded alii al the corner<br />

between surface 1 and 4 in a clockwise direction. S ee Figure 2. 1-<br />

10.<br />

-k. +100<br />

....c<br />

.<br />

,~ D.15M<br />

- ..<br />

..-<br />

,~<br />

•<br />

Reflect ed Pla n of a<br />

Rectangular Co lumn<br />

K=altitude<br />

Flate=surface<br />

k. +2,<br />

....c<br />

9<br />

•<br />

2<br />

Surface 3<br />

3 4<br />

Surface 4<br />

Surface 1<br />

Surface 2<br />

Fig. 2. /-10 Numbering of surfaces ami the folding 01/1 of a re c/allglliar colllllln<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong> 19


Circular columns are di vided according to the watch as shown in<br />

figure 2. 1- 11. The folding takes place by opening the column at<br />

12 o'clock and then fold to both sides. The folded col umn starts<br />

with the 12 o'clock spot at the left hand-side of the plan and fin ishes<br />

with 00 o'clock to the right.<br />

Reflected Plan of a<br />

Circular Column<br />

~ + 10,0<br />

,---~--~----~--,<br />

k. +2,C<br />

,---<br />

~-- c-----~------~----~o_----~<br />

12 09 06 03 00<br />

•<br />

06<br />

Figure 2.1-11: £.ml/lple 0/ Rejleclel/ Plan O/ll Circular ColwlII~<br />

20<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong>


3 Planning of<br />

Inspection<br />

Planning Procedures <strong>for</strong><br />

the <strong>Inspections</strong><br />

3.1 General<br />

Planning of inspections includes all relevant tasks from detennination<br />

of which bridges shall be inspected to the per<strong>for</strong>mance of the<br />

inspection. It is assumed that most of tile duties shall be carri ed out<br />

by assistance from the computerised part of the BMS.<br />

The planning phase includes the foll owing:<br />

• Make inspection plans<br />

'" Make inspection programme<br />

* Pri nt out inspecti on fonns<br />

'"<br />

'"<br />

'"<br />

Determine necessary inspection too ls<br />

Determine necessary access equipment<br />

Pl an and prepare necessary man <strong>for</strong>ce, waming signs, safety<br />

requirements etc.<br />

Examples of inspection tools and access equipment are more thoroughl<br />

y ex plained in chaptcr4. The other items li sted above are<br />

further elaborated in this chapler.<br />

Reference should also be made to chapter 6 "Carrying Out<br />

<strong>Inspections</strong>" and chapter 7 "Surveys, Materials Tests and<br />

Instru mentation".<br />

For major underwater inspections, it is recommended to carry out<br />

the inspections during the most appropriate season, that means<br />

when the water level is low, the water speed is slow and the sight<br />

in the water is good.<br />

Inspection plan<br />

3.2 Inspection Plan<br />

All bridges shall have an inspection pl an in the computerised part<br />

of the BMS, where the fo llowing shall be included:<br />

* Decide whi ch inspections shall be carried out<br />

>I< Detennine and sc hedule the di fferent inspections (programme);<br />

that means detcrmination of date, year and frequencics<br />

>I< Elements to be inspected fo r the different inspection types<br />

>I< Measurements, material investigations and read ing off instru<br />

mentation planned <strong>for</strong> on eaeh ind ividual inspection, inclusive<br />

extent of the work and exact time schedule<br />

>I< Determination of special damage/elements that need special<br />

attention<br />

>I< Determine required access equipment <strong>for</strong> the different inspec<br />

tions


When New <strong>Bridge</strong>s<br />

Ex isting <strong>Bridge</strong>s<br />

Inspection Programme<br />

Sub Programmes<br />

When new bridges, Ihe inspection plan is equal to the Acceptance<br />

Inspection. Practical experience shows however, that in most<br />

cases, the inspection plan is being carried out after th~ handingower<br />

process, and then based on the report from the acceptance<br />

inspection .. However, the Acceptance Inspection shall nevertheless<br />

be planned fo r in the inspection plan and the results recorded.<br />

For existing bridges, the Major Inspection shall be the: basis <strong>for</strong><br />

establishing the inspection plan if the latter do not ex ist. In the<br />

case where the inspection plan is unsatisfactory fi lled in, the data<br />

from the Major Inspection can be used as supplement or as amendment.<br />

3.3 Inspection Programme<br />

An inspection programme is a listing of all bridges decided <strong>for</strong><br />

inspection in a specific yea r. The Inspection Programme contains<br />

also measurements, material investigations, levell ing ~tc. that shall<br />

be carried out during the schedul ed inspections <strong>for</strong> each bridge.<br />

The in spection programme shall provide an overview to the<br />

<strong>Bridge</strong> Engineer and his superiors on whi ch bridges ar e to be<br />

inspected in a current year.<br />

The Inspection Programme can be split into sub-inspe::clion programmes<br />

grouped by different inspection types, road number,<br />

bridge types, districts etc._The status of bridge inspec1ion <strong>for</strong> each<br />

bridge is visualised in the programme by means of di fferent background<br />

- colours in the column <strong>for</strong> the current inspecti...on year like:<br />

White: You are free to fi ll in the inspection type and. year you<br />

wanl.<br />

Orange: The bridge is currently under inspection, me aning that<br />

the inspection <strong>for</strong>m has been printed out <strong>for</strong> the bridge.<br />

Green: The inspection has been completed as planned and data<br />

entered.<br />

Red: The inspection date has expired and you are behind<br />

schedule. (No data entered)<br />

Inspection Forms<br />

3.4 Inspection Forms<br />

Based on the decisions made in the inspection programme <strong>for</strong> the<br />

bridges in question, the programme prints out individual inspection<br />

fonns <strong>for</strong> each bridge fo r the selected inspection type.<br />

When printing out inspection <strong>for</strong>ms <strong>for</strong> each bridge, there is a possibility<br />

of selection of transferring previous inspection data to be<br />

included in the present inspection <strong>for</strong>m or not.


3.5 Inspection Resources and<br />

Safety Precautions<br />

3.5.1 General Requirements of the Inspectors<br />

In order to have reliable inspection data, it is very important thai<br />

the data entered into the system is as correct as possibl e.<br />

Inspection data is fundamentally based on judgements made by<br />

the inspectors, and their quality depends very much on the skill s<br />

and bridge experience they have gained. There<strong>for</strong>e, it is important<br />

that the inspeclors have specific quali fications such as accuracy<br />

and reliabili ty, and arc properly trained in BMS.ln additi on, an<br />

inspector has to be a careful worker, and he/she must be in good<br />

health and responsibl e (docs nol take unnecessary risks).<br />

Be<strong>for</strong>e the inspection starts, it is very important that the inspector<br />

clarifies tbe obligati ons and responsibi lities of the staff in volved in<br />

the in spection process. Each person in volved in the inspecti on<br />

must know what hi s or hers duties are. It is the inspector's responsibility<br />

to provide all personnel involved in the inspection with relevant<br />

inspection tools and safety equipme nt.<br />

Tra ining<br />

However, it is the <strong>Bridge</strong> Engineer's responsibility to train and<br />

equip the inspection personnel properl y within all aspects of<br />

inspection procedures and safety routines and to provide adequate<br />

tools and equi pment to the inspectors. Generally speaking, the<br />

<strong>Bridge</strong> Engineer should be responsible <strong>for</strong> all aspects within the<br />

fi elds of securing Health, Environment and Safety at the inspection<br />

site.<br />

3.5.2 Inspection Tools<br />

In order to per<strong>for</strong>m Ihe different types of inspections, different<br />

lools and equipment have to be used. These include non-sophisticated<br />

tools which wi ll be termed ordinal)' and spec ialised tools <strong>for</strong><br />

specific unique jobs which will be used depending on the type of<br />

inspection and site conditions. There are nonnally no inspecti on<br />

lools and equipmenl <strong>for</strong> an infonnal inspection but <strong>for</strong> the other<br />

types of inspections, the lools and equipment li sled in chapter 3<br />

should be made availabl e:<br />

3.5.3 Safety Precautions<br />

The safety of bridge inspectors and road users during the inspection<br />

fall s within the responsibility of the <strong>Bridge</strong> Engineer. It is<br />

important that he/she ensures that they frequent ly get appropriate<br />

training in safety procedures and especially w hen new inspectors<br />

have been employed.<br />

Possibilities of injury arise mainl y from:<br />

* Traffic on the deck or approaches.<br />

* A fall from the superstructure to the river or road below.


• Attack from insects, repti les, animals or vegetation around the<br />

bridge.<br />

To try to alleviate these dangers, there should be at least two people<br />

when per<strong>for</strong>ming an inspection. One might be the driver, who<br />

can also assist when tak ing measurements.<br />

Always use the safety eq ui pment fo r yourself and on the road,<br />

even on roads with very light traffic. When inspecting bridges<br />

crossing rivers with high speed currents it is important to use a<br />

li fe-jacket and safety-rope.<br />

It is always important to remember tha t accidents occur without<br />

warmng.


4. Inspection Tools &<br />

Access Equipment<br />

When inspecting bridges the inspector always has to bring with<br />

him different kinds of equipment. The necessary equipment<br />

depends on the type of bridge to be inspected and the type of<br />

in spection to be carried out.<br />

Below there are lists which show examples of such equipment, but<br />

the inspector always has to decide what equipment is necessary in<br />

each speci fic case.<br />

4.1 Inspection Tools<br />

4.1.1 Personal/protective equipment<br />

It is recommended that the inspector is supplied with the fo llowing<br />

personal equipment:<br />

'"<br />

'"<br />

'"<br />

'"<br />

'"<br />

'"<br />

Boi ler suit<br />

Insulal'ion sui t<br />

Rain suit<br />

Working gloves<br />

Rubber boots/waders<br />

Li fe-jacket<br />

Figure 4. / - / Personal Equipmenl<br />

In addition the inspector needs to be supplied with the following<br />

personal protecti ve equipment:<br />

Personal Safety Equipment<br />

'" Helmet<br />

'" Luminolls wai stcoat<br />

'" Protective shoes<br />

'" Goggles<br />

'" Ear protection<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions 25


When there is danger of fa lling from he ights, the inspector<br />

ha s to use equipment to prevent th is. Figure 4.1 -2 shows an example<br />

of such equipment that can be led past a pole without being<br />

detached.<br />

Figure 4.1-2 Equipmel1l to prevent/all<br />

When a number of bridges are to be inspected, the inspector must<br />

always be supp lied wit h all the listed personal and protective<br />

eq uipment.<br />

In other cases the type of equipment must be adjusted to the actual<br />

bridge and the aim o f the inspection.<br />

Ordinary Tools<br />

4.1.2 Ordinary Inspection Tools<br />

The ordinary inspection lools are listed below:<br />

* inspection <strong>for</strong>m, included results of the previous inspection<br />

* As built drawing<br />

* Other relevant drawi!<br />

* Maps, road numbers<br />

* Weather resistant per<br />

and pencils<br />

* Clipboard<br />

* <strong>Handbook</strong> <strong>for</strong> bridge<br />

inspection<br />

* Mobi le te lephone.<br />

Figure 4.1-3 OrdillUlY Inspectioll Tools recommended/or Gei/era/illspection<br />

26<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


4.1.3 Inspection Tools <strong>for</strong> General Inspection<br />

The ordinary inspection equipment is listed below:<br />

Equipment Genera l<br />

Inspection<br />

Inspection fo rm, included resu lts of the previous in speetion<br />

As built drawing<br />

Other relevant drawings<br />

Maps, road numbers<br />

Weather resistant pens and penc il s<br />

Clipboard<br />

<strong>Handbook</strong> <strong>for</strong> bridge inspection<br />

M obi le telephone.<br />

Figure 4.1-4 DIY/iI/my inspection Tools<br />

4.1.4 Inspection Tools <strong>for</strong> Major InspeI< Traffic warning signs<br />

• Dictaphone<br />

'" Video recorder<br />

'" Plumbli nc<br />

• Thennometer<br />

'" Magnifying glass<br />

... Gauge <strong>for</strong> measuring crack widths<br />

'" Sliding calliper.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 27


Fil,,'1lre 4.1-5 £qllipmelll Major Inspec/ion<br />

When carrying olltmajor inspection it is also normal to carry out<br />

different measurements and in vest igations of materials.<br />

In vestigations of concrete are most common.<br />

Measureme nts<br />

Investigation of Concrete<br />

Equipment and tools needed <strong>for</strong> these measurements and investigations<br />

of concrete are:<br />

• Small level<br />

• Levell ing equipmen t<br />

• Straight edge<br />

• Measuring device<br />

• Rebound hammer<br />

• Covermcter<br />

• Phenolphthalein fluid<br />

• Wire brush<br />

• Electric chisel<br />

• Hammer drill, AC- or battery<br />

• Small plastic bags <strong>for</strong> concrete dust<br />

• Water proof markers<br />

• Aggregate <strong>for</strong> AC current<br />

• Dry cement mortar and/or joint seal<br />

• Tools <strong>for</strong> mixing ofmortar<br />

Water.<br />

28<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


4.1 .5 Inspection Tools <strong>for</strong> Special Inspection<br />

In addition to the equipment described <strong>for</strong> major inspection, the<br />

special inspection may require eq uipment to carry out material<br />

examinations to veri fy cause and degree of damage. Tllis equipment<br />

is:<br />

Equipment - Special<br />

Inspectio n<br />

• Un iversal instrument fo r electrochemical potential and resistan<br />

ce mappmg<br />

• Device <strong>for</strong> con tro l of surface treatment (Measuring thickness,<br />

bond, etc.)<br />

• Concrete core drill<br />

• Magnetic powder eq uipment<br />

• Ultrasonic equipment<br />

• X- ray equipment.<br />

The use of special inspection equipment often requires<br />

special skil ls or certifica tes, thus qualified inspectors must be hired<br />

from specialist or certifying agencies. Ref. also chapter 7 -<br />

"Surveys, Materials Tests and Instrumentation".<br />

4.1.6 Inspection Too ls <strong>for</strong> Major Underwater­<br />

Inspection<br />

The diver has to use diving equipment in accordance with national<br />

regulations.<br />

To carry out the major inspection<br />

under water may require:<br />

Equipment - Unde rwat er<br />

Inspectio n<br />

• Camera <strong>for</strong> under water use<br />

• Video recorder <strong>for</strong><br />

under water<br />

use<br />

• Ranging rods<br />

• 50111 tape<br />

measure, nylon<br />

• Folding ruler<br />

• Levell ing<br />

equipment<br />

Figure 4. 1-6 Eqllipmelll<strong>for</strong> Major Illspectioll Vllder IfI(lter<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong> 29


In some cases there can be obslacles that prevent inspection of<br />

foundations under water such as fo rmwork, the foundation being<br />

overgrown, etc. In these cases it can be necessary to use heavy<br />

equipment/tools such as:<br />

Equipment <strong>for</strong> removal<br />

of Formwork<br />

• Lorry equipped with a crane or winch<br />

• Hydraulic tools<br />

• Hydraulic aggregate<br />

• Water jetting equipment<br />

• Barking spade<br />

• Iron bar<br />

• Crow bar<br />

• Axe.<br />

4.1.7 Inspection Tools <strong>for</strong> Major Cable·<br />

Inspection<br />

When carrying out a major inspection of cables it wi ll in most<br />

cases be sufficient to use the same eq uipmen t as fo r major inspection.<br />

4.2 Access Eq u ip m ent<br />

The choice of access equipment when carrying out a bridge<br />

inspection will depend upon the type of inspection and bridge, the<br />

pattern and density of traffic and the total economy of the inspection.<br />

Access Equipment -<br />

General Inspection<br />

4.2.1 Generallnspection<br />

When carrying out general inspection it is not necessary to use<br />

hcavy access equipment like bridge li fts etc, but it may sti ll be<br />

necessary to use light equipment listed below in order to perfonn a<br />

visual check of important construction elements.<br />

• Keys to doors and gatcs<br />

• Under water viewer<br />

• Necessary access equipment to reach specified bridge elements<br />

or parts of elements.<br />

Accesss Equipment­<br />

Other <strong>Inspections</strong><br />

4.2.2 Other <strong>Inspections</strong><br />

For all other types of bridge inspection it is required that the<br />

inspector is within reach of tile structure. In many cases it will be<br />

necessary to use access equipment such as:<br />

• Ladders<br />

• Ordinary lifts<br />

• <strong>Bridge</strong> lifts<br />

• Boats/pontoons/rafts<br />

• Suspended worki ng plat<strong>for</strong>m s<br />

• Professional mountaineering equipment<br />

30<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


The site conditions may decide which access equipment to be<br />

used. In most cases the best choice wi ll be a bridge lift. When in<br />

use on narrow bridges or during dense traffic, bridge lifts may<br />

restrict the traffic flow. In such cases the inspection shou ld, ifpossib<br />

le, be carried out from a boat, pontoon, raft or an ordinary lift<br />

from underneath the bridge. Suspended working plat<strong>for</strong>ms may in<br />

certain cases be a choice.<br />

It is possible 10 combine different types of access equipment. An<br />

ordinary lift can <strong>for</strong> example be used from a pontoon.<br />

Power lines close to the bridge or the existence of a railroad under<br />

the bridge will often influence upon the choice of access equipment.<br />

During the win ter the inspection can, in some parts of the country,<br />

be carried out from the ice. It is important to first control that the<br />

ice is safe.<br />

In the following chapters different types of access eq uipment are<br />

described.<br />

Ladder<br />

fllSpectiolljrOIll (l<br />

4.2.3 Ladder<br />

For minor bridges or bridges with restricted height, the use of a<br />

ladder may be sufficient to get access. Ladders longer than 4 m<br />

must be secured by appropriate means. Inspectors working alone<br />

are not allowed to work from a ladder.<br />

lifts<br />

4.2.4 Ordinary type of Lifts<br />

Ordinary lifts that operate from ground level with the platfonn<br />

moving upwards may be used <strong>for</strong> inspection of overhead trusses<br />

and overhead crossing bridges. Ordinary li fts may also be useful<br />

<strong>for</strong> inspection of bridges with access fo r the equipment from roads<br />

or other hard surfaces under the bridge. The different types are:<br />

* Telescopic lift with scissors action<br />

* A hydrau lic arm with a basket mounted on trailer to be pulled by<br />

car<br />

* A hydraulic ann with a basket mounted on lorry<br />

Scissor lifts<br />

Bascet lifts<br />

Telescopic lifts with sc issors action have rather large work plat<strong>for</strong>ms<br />

that move vert ically. The vertical reach is limited to between<br />

5 and 10 metres.<br />

A hydraulic arm with a basket mounted on trai ler to be pul led by<br />

car has a vertical reach from 10 to 20 m and a horizontal reac h<br />

from 5 to 10m depending on the size and make. They are more fl e­<br />

xible in use than te lescopic lifts and have a lifting capacity <strong>for</strong> two<br />

persons or one person with some equipment.<br />

<strong>Handbook</strong> <strong>for</strong> Bri dge <strong>Inspections</strong> 31


Figure 4.2-1 Ordillwy Baskel Lift all pOIltOOI1S<br />

A hydrau lic arm with a Basket mounted on a lorry has a vertical<br />

reach from 10 to 45 m and a horizontal reach from 5 to 20 m.<br />

Figure 4.1-3. Smo'f{ Basket<br />

Lift 1I101lllted 011 (J Lorry<br />

4.2.5 Types of <strong>Bridge</strong> Lifts<br />

A bridge li ft is a lift specially designed to inspect the lower parts of<br />

a bridge structure from a basket or plat<strong>for</strong>m lowered down underneath<br />

the bridge deck whi le the operating vehicle still is travell ing<br />

on the roadway. In addition supplementary working envi ronment<br />

and safety requirements may appl y.<br />

Minimum Technical<br />

Requirements of a Bascet<br />

Lift<br />

1) The downward reach should exceed 6 m and the ho riz~nta l<br />

reach underneath the bridge deck should be at least 6- 7 m.<br />

2) The device shou ld be equipped with one basket with a safe wor<br />

32<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong>


king load capacity of at least 300 kg at maximum reach. This<br />

will accommodate 2 persons and sufficient equipment. The bas<br />

ket has to be fitted with automatically vertical adj ustment.<br />

3) Manoeuvring must be possible both from the basket and the dri<br />

vers seat in the vehicle. The basket must be fitted with an emer<br />

gency stop device to freeze any movement immed iately.<br />

4) There must be a fixed means of communication between the<br />

basket and the driver's seat.<br />

5) The vehiele should be able to move during the inspection.<br />

6) The maximum allowable pressure from wheels and support legs<br />

is 0.4 N/mm2. Maximum axle load of8 tons.<br />

7) The bridge lift must be able to work from bridges with up to<br />

10 % longitudinal slope<br />

8) The basket must be fitted with electrical power connection and<br />

li ght.<br />

There are two types of bridge lifts available Ihal fulfillhese<br />

requirements:<br />

* <strong>Bridge</strong> lift with basket<br />

* <strong>Bridge</strong> lift with work platfo rm.<br />

<strong>Bridge</strong> Bascet lift<br />

<strong>Bridge</strong> lift with ba sket is the most common type, see Figure 4.2-4<br />

to 3.2.6. The hori zontall y distance is normally 8-1 0 m, but is<br />

depending of how far down the basket can go and how far from the<br />

edge of the bridge the lorry has to drive.<br />

The largest lifts of this type has a downwards range of up to 20-25<br />

m. NormaJl y the reach is 10 m. Most of this type of bridge li fts<br />

may reach upwards as well, see Figure 4.2-7. A typical work diagram<br />

<strong>for</strong> a bridge lift is shown in Figure 4.2-8<br />

Figure 4.2-4 Small <strong>Bridge</strong> Lift with a Basket<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong><br />

33


Example of <strong>Bridge</strong> Lifts<br />

Figure 4.1-5 MediuIII size <strong>Bridge</strong> Lifill'ilh a Baskel (BI'OIl IO sky/iji)<br />

(Mllllllle/a bridge Lifi)<br />

Figure 4.2-6 Large <strong>Bridge</strong> Lifill'ilh a Baskel<br />

Figure 4.1-7 Large <strong>Bridge</strong> Lifiusedfrom<br />

Ground<br />

34<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> In spections


Work Diagram <strong>for</strong> <strong>Bridge</strong><br />

Lift<br />

,....<br />

' ..<br />


limitations to <strong>Bridge</strong> lifts<br />

It is important to be aware of what limitations there are on the operation<br />

of a certain bridge lift in order to make the proper choice.<br />

The limitations are mainly related to the following conditions:<br />

* <strong>Bridge</strong> type<br />

* Width of the roadway<br />

* Railings and light posts<br />

* TaU piers<br />

* Load carrying capacity ( of different parts of the bridge)<br />

Inspecting different<br />

<strong>Bridge</strong> Types<br />

The largest cantilevered box-girder bridges may have a construction<br />

height of up to 15 m at the piers. In order to inspect the lower<br />

flange of the box-girder in this area a bridge lift with sufficient<br />

reach is required. See figure 4.2-10.<br />

The same requirements as above are va lid <strong>for</strong> the inspection of<br />

arch bridges. See figure 4.2-11 .<br />

Figure 4.2-10 Illspeclioll of call1ilevered Box-Girder <strong>Bridge</strong> (K-lijt<br />

r<br />

Figl/l"c 4. 2-11 hrspeclioll of a COllcrele Arclr <strong>Bridge</strong> (Bl"OlIlo sJ.)'lijtJ<br />

36<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


When inspecting suspension bridges, trusses and arch bridges the<br />

manoeuvrabili ty of the bridge lift is of outmost importance. The<br />

basket must be able to move easily in and out between the vertical<br />

and diagonal elements. See figure 4.2- 12. When inspecting minor<br />

through truss bridges the bracing of the top boom may restrict the<br />

movement of the bridge li ft considerably.<br />

<strong>Bridge</strong> Width<br />

Railings/Light Posts<br />

Figure 4.1-11 Illspeclioll of a Tmss <strong>Bridge</strong> (K-lifi)<br />

The space needed <strong>for</strong> the different types of bridge lifts when the<br />

supporting legs are in place varies and has to be considered, especially<br />

on narrow bridges, in order to cause as few problems <strong>for</strong> the<br />

traffic flow as possible.<br />

When footwalks are separated from the roadway by rai ling, this<br />

may influence the required range oflhe bridge li ft in ease it has to<br />

be used from the roadway only. Moving past light posts may hamper<br />

the speed of the in spection considerably. There are bridge lifts<br />

in the marked suitable <strong>for</strong> pass ing light posts and other obstructions<br />

without delay, see Figure 4.2-13.<br />

Figure 4.1-13 Passing a Flagpole (Nummela Brulifi)<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 37


Passing Tall Piers<br />

The access to tall piers may in some cases present a challenge<br />

because reach of the largest lifts is limited. A few of the bridge lifts<br />

may be fitted with a light suspended working plat<strong>for</strong>m, or similar<br />

device underneath the main working plat<strong>for</strong>n1 or basket. See figure<br />

4.2-14.<br />

Figure 4.2-14 Inspection o/Tall Piers<br />

load Carrying Capacity<br />

Pa int Wagon<br />

The load canying capacity of the bridge may in certain cases prohib<br />

it or restrict the use of bridge lifts. It should be noted that that<br />

the pavement may not allow the same loads as the rest of bridge.<br />

<strong>Bridge</strong> lifts or their supporting legs should not be placed on pavements<br />

unless it has been checked thai the pavement is able to cany<br />

the loads in question.<br />

4.2.6 Other types of Access Equipment<br />

Some bridges are fitted with integrated access and maintenance<br />

carriages that can travel underneath the bridge. See figu re 4.2- 15.<br />

Figure 4.2-15: Inspectioll/rom Maintenance Carriage<br />

38<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


Suspended Working<br />

Plat<strong>for</strong>m<br />

Also suspended working plat<strong>for</strong>ms can be used <strong>for</strong> inspection, see<br />

fi gure 4.2- 16. In spection from thi s kind of more stationary equipment<br />

may be an alternative in cases when disturbances to the traffi<br />

c must be avoided. The inspection can not be per<strong>for</strong>med as fast as<br />

with a proper bridge lift, especially if a number of verti cal members<br />

or light posts influence shifting of the equipment.<br />

Figure 4.2-/6: Inspec/ion from a Sllspende(/ Working Plat<strong>for</strong>m<br />

Mountaineering Equipment<br />

Inspection using professional mountaineering equipment may in<br />

some cases represent the only economic alternative to get close<br />

enough to the bridge elements. This alterna tive is not recommended<br />

<strong>for</strong> normal inspection tasks. Such mountaineering equipment<br />

is considered as personal safety equipment and the use and maintenance<br />

is the responsibility of the person to whom it has been issued.<br />

Figure 4.2-17: Inspectioll<br />

/Ising Professio!!al<br />

Moul/tail/eering £qllipll1elll<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong><br />

39


40 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


5 Damage<br />

Evaluation<br />

Fundamentals<br />

5.1 General<br />

When evaluating a damage on a bridge the fo ll owing must be decided:<br />

Basis <strong>for</strong> Evaluation<br />

of Damage<br />

Types of Oa mage<br />

• Dclcnninc the Type of Damage<br />

• Detennine the Consequence of Damage to the bridge<br />

• Dctcnnine the Cause of Damage<br />

In most cases the evaluation ofa damage consists of a visual<br />

check, sometimes followed by measurements and ma.terial investigations.<br />

However, in some special cases, it may be necessary to<br />

carry out calculations of structural capacity, economical considerations<br />

and/or in vestigation by implementing long lenn instrumentati<br />

on survey on the bridge in order to establish rel iab Ie in<strong>for</strong>mation<br />

to evaluate the damage correct.<br />

Deg reel Consequence<br />

of Damage<br />

Cause of Damage<br />

In order to established a unified description of damag e, the listed<br />

types of damage in chapter 5.2 have to be used.<br />

Any damage to be recorded shall be assessed by consjdering the<br />

degree of damage and the consequence of damage.<br />

As part of a complete damage evaluation, al so the cause to the<br />

damage has to be determined. The most common causes of damage<br />

are li sted in chapter 5.6.<br />

5.2 Types of Damage<br />

The most common "Types of Damage" are listed below with a<br />

brief explanatory text connected to each of them. A more extensive<br />

and detailed description of each type of damage inelu sive examples<br />

are given in chapter 9 The Damage Evaluation Catalogue.<br />

Each type of damage is given a three-digit code where the first<br />

digit indicates the material or element the damage referred to, and<br />

the second and third indicate the type of damage. This in order to<br />

ease the registration of damage in the data base, and make it possible<br />

to scan the data/and make statistics. It should be noticed that<br />

one defect may consists of several Types o f Damage.


Da mage typical to Ground<br />

Damage to Ril.'er COllrse<br />

101 Subsidence of • Vertical movement of the ground or<br />

ground/embankment<br />

embankment<br />

102 Obstruction of waterway • When the waterway is partially or totally<br />

blocked<br />

103 Scouring/erosion of river • Removal of soil in river bed area caused by<br />

course<br />

the stream flow<br />

104 Inadequate clearing • All kinds of unwanted vegetation, stones,<br />

up/removal<br />

sand etc. in the river course or items stored<br />

under the bridge<br />

Depositing of mud Is and in river bed<br />

105 Silting up •<br />

106 Insufficient discharge capacity • When the volume of water per unit oftime<br />

flowing under lhe bridge is less than<br />

necessary<br />

107 Change of ri vcr course • When the river flows outside its natural<br />

course<br />

109 Other type of damage to river<br />

course<br />

• Any other damage not li sted here<br />

Damage to protection<br />

facilities:<br />

III Wash out of protection facil ity<br />

• When the stones <strong>for</strong> the rip rap are washed<br />

away<br />

11 2 Scouring of protection • Removal of soil under protection facility<br />

facilities<br />

caused by the water flow<br />

11 3 Movement of protection • The protection facility has moved<br />

facility<br />

horizontally or vertically<br />

114 Defective part of protection • Part of the protection facility is not working<br />

facility<br />

in accordance with expectations<br />

119 Other damage to protection • Any other damage not listed here<br />

facility<br />

2 Damage to Concrete<br />

Elements<br />

20 1 Settlemcnt o f concrete element • Vertical movement of element<br />

202 Movement of concrete • Rotation/dislocation of element(s) from its<br />

element<br />

original position<br />

203 Defonnation of concrete • Loss of original shape or geometry. Includes<br />

element<br />

buckling, bending etc.<br />

204 Cracks in concrete element • Includes all types of cracks<br />

205 Rupture of concrete element • Broken concrete element, member or post<br />

etc.<br />

206 Damage to the concrete • Damage to any surface treatment on<br />

surface treatment<br />

concrete


207 Leakage/dampness of concrete<br />

element<br />

• When liquid penetrates through the element<br />

208 Discoloration of concrete<br />

element<br />

• Discoloured surface of a concrete element<br />

209 Insufficient/damaged cover of<br />

concrete element<br />

• Less cover than designed <strong>for</strong><br />

210 Weathering of concrete elem. • Normal wear and tear<br />

211 Honeycombing of concrete • Caused by <strong>for</strong> example, insufficient<br />

element<br />

vibration of concrete<br />

212 Delamination of concrete • Separation into concrete layers<br />

element<br />

213 Spalling of concrete clement • Bits of the surface concrete falling down<br />

214 Corrosion of rein<strong>for</strong>cement • Rein<strong>for</strong>cement damaged by corrosion<br />

215 Wash out of concrete element • Removal of particles from the concrete hy<br />

water<br />

216 Inadequate cleaning of • Debris, dirt, vegetation etc. not removed<br />

concrete element<br />

from the element<br />

217 Inadequate clearing<br />

up/removal<br />

• Formwork. bars, strip steel etc. not removed<br />

218 Poor concrete quality<br />

• Quality of concrete lower than can be<br />

accepted<br />

219 Scoring/undermining of • Holes in the ri ver bed or bank under<br />

concrete clement<br />

concrete element caused by the flow of river<br />

220 Missing part(s) of concrete • Originally designed part of an element is<br />

element<br />

mlssmg<br />

290 Other damage to concrete • Any other damage not listed above<br />

element<br />

3 Damage ty pical to<br />

SteellAluminium and Iron<br />

Elements<br />

301 Settlement of steellalum.liron • Vertical movement of the element<br />

element<br />

302 Movement of steellalum.liron • Rotation/dislocation of element(s) from its<br />

element<br />

original position<br />

303 Defommtion of • Loss of originally shape or geometry, i.e.<br />

steel/alum.liron element<br />

buckling, bending, kinks etc.<br />

304 Cracks in steeJlalum.liron<br />

clement<br />

• Includes all types of cracks<br />

305 Fracture of steellalum.liron<br />

element<br />

• When a part ofthe steel element is broken<br />

306 Damage to steel surface<br />

treatment<br />

• Damage to coatings. galvanizing etc.<br />

307 Leaks/dampness impact of • When a steel element is leaking


steellalum .liron clement<br />

308 Discolouration of • Discoloured surface of clement<br />

steeValum.liron clement<br />

309 Loose connections of • Looseness of bolts, ri vets or any other part<br />

steel/alum.liron element<br />

of steel element<br />

310 Corrosion of steeUiron<br />

element<br />

• Disintegration of the surface through rust<br />

311 Friction/abrasion of<br />

stcellalum .liron clement<br />

• Abrasion behveen parts caused by friction<br />

312 Broken cable strands • When strands of a cable are broken<br />

313 Inadequate cleaning • All kinds of debris, sand etc. on the element<br />

314 Missing partes) on • Part of ori ginally designed member is<br />

steel/alum .liron clement<br />

missing<br />

315 Inadequate clearing<br />

• Formwork or any other unwanted item on<br />

up/removal<br />

the structure<br />

316 Material fault of steel element • Insuffi cient quality of steel<br />

390 Other damage to steel element • Any other damage not listed above<br />

4 Da mage typica l to<br />

StonelMasonry Elements<br />

401 Settlement of stone/masonry • Vertical movement of the clement<br />

element<br />

402 Movement of stone/masonry • When the element has moved from its<br />

element<br />

original position<br />

403 De<strong>for</strong>mation of stone/masonry • Loss of original shape or geometry, i.e.<br />

element<br />

buckling, bending, etc.<br />

404 Cracks in stone/masonry<br />

element<br />

• Includes aJ l types of cracks<br />

405 Leakage/dampness of<br />

stone/masonry clement<br />

• Leaks through portion of an clement<br />

406 Discoloration of • Discoloured surface of a stonclmasonry<br />

stone/masonry clem.<br />

element<br />

407 Displaced stones in stonework • Slippage of a stona1 portion of the element<br />

408 Collapsed stonework<br />

• When a part of or the entire element has<br />

collapsed<br />

409 Inadequate cleaning of • All kinds of debris, sand etc. on the element<br />

stone/masonry element<br />

410 Inadequate clearing • Fonnwork or any other unwanted item on<br />

up/removal<br />

the structure<br />

411 Wearing of pointing<br />

• Deterioration of mortar in the joints<br />

490 Other damage to • Any other damage not listed above<br />

stone/masonry clem.<br />

5 Damage typical to T imber<br />

Elements


501 Settlement of timber element • Vertical movement of the element<br />

502 Movement of timber clement • When the element has moved from its<br />

original position<br />

503 Defonnation of timber • Loss of original shape or geometry, i.c.<br />

element<br />

buckling, bending, etc.<br />

504 Cracks in timber element • Includes all types of cracks<br />

505 Fracture of timber element<br />

• A broken member of the timber element<br />

506 Damage to timber surface • Damage to painting, impregnation etc<br />

treatment<br />

507 Leakage/dampness of timber • Unwanted leakage through or from an<br />

element<br />

element<br />

508 Discoloration of timber<br />

element<br />

• Discoloured surface of a timber element<br />

509 Chipping & splintering of<br />

timber<br />

• Splintering of timber surface<br />

510 Timber decay • Deterioration of the timber leading to<br />

softness<br />

511 Inadequate cleaning of timber<br />

clement<br />

• All kinds of debris, sand etc. on the element<br />

512 Missing partes) on timber<br />

element<br />

• Lack of any originally designed partes)<br />

513 Loose connections of timber • Looseness of bolts, rivets or any other<br />

element<br />

member<br />

514 Delamination of timber<br />

element<br />

• Separation into layers<br />

590 Other damage to timber<br />

element<br />

• Any other damage not listed above<br />

6 Damage typical to Deck<br />

Pavement<br />

601 Cracks in the surfacing • All types of cracks<br />

602 Leaks through the surfacing • Leaks through portion of the surfacing<br />

603 Ruts in the wearing course • Channelled depressions of the surfacing<br />

following the wheel tracks<br />

604 Unevenness of the surfacing • Corrugation etc. of the wearing course<br />

605 Cracking/potholes of the • Crazing or irregular shaped, disintegrated<br />

surfacing<br />

areas of the surfacing<br />

606 Blistering (toadstools) of the<br />

• Happens nomlally to the watcr proofing<br />

surfacing<br />

layer<br />

607 Flaking of surfacing • Looseness of portiones) of the surfacing<br />

608 Inadequate cleaning of the<br />

• Debris, sand, gravel etc. on the wearing<br />

pavement<br />

course<br />

609 Sweating of the surfacing • When bitumen penetrates to the surface and<br />

make the wearing course slippy<br />

690 Other damage to the surfacing<br />

• Any other damage not li sted above


7 Damage to Bearings/Joints<br />

Damage to Bearings<br />

701 Bearings out o[position • Abnormal position of bearings<br />

702 De<strong>for</strong>mation of bearings • Abnormal de<strong>for</strong>mation of bearings<br />

703 Cracks & Fissures in bearings • Includes all types of cracks<br />

704 Fracture of bearing member • A part of the bearing is broken<br />

705 Damage to surface treatment • Damage to coatings, galvanizing etc.<br />

ofbcarings<br />

706 Corrosion of bearings<br />

• Disintegration of steel surface through rust<br />

707 Inadequate cleaning of • Debri s, sand, gravel etc. on the bearing shelf<br />

bearinglbearing shelf<br />

708 Missing partes) of bearing • Part of original design missing<br />

709 Other damage to beari ngs • Any other damage not listed here<br />

Damage to Joints<br />

711 Abnormal movement of joint • The expansion and contraction behaviour of<br />

the joint is not in accordance with the design<br />

712 Cracks & Fissures in joint • Includes all types of cracks<br />

713 Fracture of joint part • Broken part(s) of the joint<br />

714 Leakage of joint<br />

• The joint is not water tight<br />

715 Corrosion of joint • Disintegration of steel surface through rust<br />

716 Unevenness of joint • Height difference between the joint and the<br />

approaching deck<br />

717 Crackinglholes in joint • Cracking only nonnally appears in asphalt<br />

joints<br />

718 Inadequate cleaning of the • Debris, sand, gravel etc. collected in the<br />

joint<br />

joint<br />

719 Missing part(s) oflhe joint • Part of original design mi ssing<br />

720 Loose part(s) oflhe joint<br />

• Looseness of bo lts, cover plate or any other<br />

part oflhejoint<br />

790 Other damage to the joint • Any other damage not listed here<br />

8 Damage to<br />

Drainage/Approaches and<br />

Accessories<br />

Damage to tile Drain System<br />

801 Defective drain pipes<br />

• Pipes not functioning as planned<br />

802 Leakage o f drain pipes<br />

• Leakage oflhe drain pipe or through the<br />

joint between the pipe and the deck<br />

803 Corrosion of drain pipes<br />

• Disintegration o f pipes through corrosion<br />

804 Inadequate cleaning of the<br />

• Debris, sand, gravel cte. in the drain system,<br />

drain system<br />

but not blocked<br />

805 Blockage of drain system<br />

• Does not allow water to pass<br />

806 Missing part of drain system<br />

• Originally part missing


809 Olher damage to the drain<br />

system<br />

• Any other damage not listed here<br />

Damage to the <strong>Bridge</strong><br />

A pproaches<br />

811 Settlement/subsidence of the<br />

bridge approach<br />

• Depressions in the road surface approaches<br />

812 Potholes in bridge approaches<br />

• Irregular shaped, disintegrated areas orthe<br />

approach road surface<br />

813 Erosion of bridge approaches • Materials removed from the slopes of the<br />

embankment, normally caused by flowing<br />

water<br />

8 14 Extensive vegetation • Vegetation reducing the traffic safety<br />

8 15 Defective drain ditches • Drain ditches arc not functioning as<br />

intended<br />

816 Loss of road camber • Improper cross fa ll of the road surface<br />

819 Other damage to bridge<br />

approaches<br />

• Any other damage not listed here<br />

Damage to Accessories<br />

821 Defective or missing sign(s)<br />

• Sign damaged or mi ss ing<br />

822 Damaged insulation on • Water pipes, electric cables etc.<br />

accessories<br />

829 Other damage to accessories<br />

• Any other damage not listed here<br />

990 Olher da mage to tbe bridge • Any other damage to the structure not listed<br />

in this section


5.3 Degree of Damage<br />

Consequence of<br />

Damage<br />

Degree of Damage<br />

The Degree of Damage is used to indicate the seriousness or severity<br />

of the damage which depends on the development speed and<br />

the rate of severity at the inspection time <strong>for</strong> each indiv idual damage<br />

or group of damage. Four characters indicate di fferent levels of<br />

seriousness of a damage as outlined below:<br />

Degree of Damage ­<br />

Condition<br />

that releases Maintenance<br />

Action<br />

I :<br />

2:<br />

3:<br />

4:<br />

9:<br />

Minor damage or defects that might not require any<br />

remedial action within the next 10 years.<br />

A verage or slight damage or defects that require<br />

remedial action within 4 - 10 years.<br />

Serious damage or defects that requ ire remedial<br />

ac tion within I - 3 years.<br />

Critical damage or defects that require remedial action<br />

within 0 - 1/2 year.<br />

Not inspected<br />

The objective of these characters is to let the inspector indi cate,<br />

the seriousness of the damage observed, based on hi s professional<br />

judgement, and when they have to be repaired.<br />

If the damage may affect the carrying capac ity, thoroughly static<br />

calculations may be necessary in order to determine the severity<br />

be<strong>for</strong>e the degree of damage settles.<br />

When the damage affect the maintenance costs severely, and the<br />

extent is exten sive, a cost benefit analysis should preferably be<br />

carri ed OUI on the bridge be<strong>for</strong>e the degree of damage detennines.<br />

When inspecting a bridge, the inspector has to detennine if the<br />

present condition of the bridge has reached a level where maintenance<br />

action is rel evant or not. The way of doing this <strong>for</strong> the<br />

inspector, is as follows:<br />

Degree of damage 1 is a state of condition which can be accepted<br />

without any recommended action.<br />

Degree of damage 2-4 is a state of condition which demand action.<br />

The inspector has to detennine if degree o f damage 2, 3 or 4<br />

shall be selected, combin ed with recommended year of action to<br />

avoid that the carrying capacity, traffic safety etc. sha ll be affected<br />

seriously.<br />

Conseqence of Damage<br />

The consequences of damage indicate what it will affect if the<br />

damage is not repaired in time. Three effects have been considered<br />

and are abbreviated by letters as fo llows:<br />

C :Damage or defect that affects carrying capacity<br />

T:Damage or defect that affects traffic safety<br />

M: Damage or defect that affects maintenance cost<br />

E: Damage or defect that affects the environment/aesthetics


These effects are presented in order of importance. Damage that<br />

affects carrying capacity, will there<strong>for</strong>e be given higher priority<br />

than that affecti ng environment or maintenance costs.<br />

When relevant, the cost of repairs shall also include traffic costs as<br />

wei l.<br />

One damage may have several consequences.<br />

Assessment of Damage by<br />

Combining Degree and<br />

Consequence of Damage<br />

Damage that affects the<br />

Carrying Capacity<br />

The condition of a bridge element is assessed by cOllS idering the<br />

seriousness and effect of any damage to it. The assessment therefo<br />

re, is a combination of the degree and consequence of the damage.<br />

This combination results in the final assessment ofthc damage as<br />

outlined below:<br />

I C = Minor damage/defect that in the long run may present<br />

danger to the carrying capacity of the structure. The<br />

damage might not require repair within the coming 10<br />

years.<br />

2C = Average damage/defect which can reduce the carrying<br />

capacity of the structure ifno repair is carried out within<br />

the next 3-10 years. The damage must be repaired within<br />

3- 10 years.<br />

3C = Serious damage/defect which can rcduce the carrying<br />

capacity of the structure ifno repair is carried out within<br />

the next 1-3 years. The damage must bc repaired within<br />

\-3 years.<br />

4C = Critical damage which has reduced or is about to reduce<br />

the carrying capacity of the structure. The damage must<br />

be repaired immediately or within half a year if safety<br />

precautions shall be avoided. Report on the findings<br />

shall be submitted to the <strong>Bridge</strong> Engineer immedia<br />

tely.<br />

Damage influencing the<br />

Traffic Safety<br />

Damage inftuencing the<br />

Maintenance Cost<br />

lT ~<br />

2T ~<br />

3T ~<br />

4T ~<br />

lM ~<br />

Minor damage/defect that might in the long run present<br />

danger to the traffic safety. The damage m ight not requi<br />

re to be repaired within the coming 10 years.<br />

Average damage/defect which can reduce the traffic<br />

safety if no repair is carried out within the nex t 3-1 0<br />

years. The damage must be repaired withill 3- 10 years.<br />

Serious damage/defect whi ch can reduce t he traffic safe<br />

ty lfno repair is carried out within the nex t 1-3 years.<br />

The damage must be repai red within 1-3 years.<br />

Critical damage which has reduced or is about to reduce<br />

traffic safety. The damage must be repaired immediately<br />

or wi thin half a year if safety precautions s hall be avo<br />

ided.<br />

Report on the findings shall be submitted to the<br />

<strong>Bridge</strong> Engineer immediately.<br />

Minor damage/defect that in the long run, is considered<br />

to influence the maintenance costs. The damage mi gh t<br />

not require to be repaired with in the coming 10 years.


2M = Average damage/defect that can develop in such a way<br />

that repairs will be more comprehensive, compl icated<br />

and costly ifnothing is done within the next 3- l 0 years.<br />

The da mage must be repaired within 3-10 years.<br />

3M = Serious damage/defect that can develop in SUcJlI a way<br />

that repairs will be more comprehensive, complicated<br />

and costly ifnothing is done within the next 1-3 years.<br />

The damage must be repaired within 1-3 years.<br />

4M = Critical damage that can develop in such a way that<br />

repa irs wil l be more comprehensive, complicated and<br />

costly ifrepair to the damage is not carried out im medi a<br />

tely or within half a year.<br />

Da mage influencing<br />

Environment! Aesthetics<br />

1 E = Minor damage/defect that might in the long rUTh effect the<br />

environment/aesthetics. The damage might not require to<br />

be repaired within the coming 10 years.<br />

2E = Average damage/defect that can develop in such a way<br />

that envi ronment/aesthetics can be effected adversely<br />

within the next 3- 10 years. The damage must be repai red<br />

within 3- 10 years.<br />

3E = Serious damage/defect that can develop in suclll a way<br />

that environment/aesthetics can be effected adverse ly<br />

within the next 1-3 years. The damage must be :repaired<br />

within 1-3 years.<br />

4E = Critical damage that already has nega ti ve impact on<br />

environment/aesthetics or wi ll have withi n 0- 1 (2 year if<br />

the damage is not being repaired immediately or withi n<br />

haifa year.<br />

Examples of damage/defects that affect the Environment/-Aesthetics<br />

can be like noisy joints, painted surfaces with graffiti etc ..<br />

When evaluating a damage determining the consequen ce 10 affect<br />

the Environment/Aesthetics, the Type of Damage is rar ely rated to<br />

be4.<br />

5.4 Damage Evaluation<br />

5.4.1 Primary & Secondary Damage<br />

Sometimes a damage(primary damage) can init iate oth er types of<br />

damage (secondary damage).<br />

Below are listed examples of typical primary damage followed by<br />

some examples of initiated types of secondary damage.<br />

* Settlement of abutment or piers will normal ly lead to de<strong>for</strong>ma<br />

tion of superstructure fo r contin uous bridges.<br />

* C racks in concrete will normally lead to lea kage, stains, disco<br />

loration etc.<br />

Splits in timber may lead to timber decay<br />

* Insufficient covering wi ll normall y lead to corrosion on rein<br />

fo rcemenl or spalling.


The Development o f<br />

Damage<br />

It is important to fully realise the relationship between primary and<br />

secondary damage when both evaluating the damage and decidi ng<br />

the type ofrepair(s).ln most cases primary damage has to be<br />

detennined be<strong>for</strong>e any remedial action can be taken. Repai rs deduced<br />

from secondary damage are rarely successful.<br />

5.4.2 The Extent to which Damage has<br />

Developed<br />

It is usually easy to come to a concl usion about serious damage<br />

which has already reduced carrying capac ity or traffic safety when<br />

remedial measures require to be speedil y set in motion.<br />

Measu rements/Materials<br />

Testing<br />

The Co urse of Development<br />

of Specific Damage<br />

On the other hand it is more difficult to evaluate damage which is<br />

sti ll developing. In such instances it is important to produce a<br />

detailed overview of the following circumstances:<br />

I. How long has it taken <strong>for</strong> the damage noted to develop?<br />

2. How quick is the probability that it will continue developing in<br />

the future?<br />

Observations recorded during previous inspections wi ll be valuable<br />

in connection with assessing how quickly an incidence of<br />

damage has been developing.<br />

In order to assist in assessing the development of damage measurements<br />

and materials testing can additionally undertaken. As an<br />

example, levelling can be employed in recording the development<br />

of settlement, whilst measuring the depth of carbonisation and<br />

chl oride content over a period can be used in evaluating the ri sk of<br />

the re in<strong>for</strong>cement corroding in the fut ure.<br />

In addition to practical experience theoretical models exist <strong>for</strong><br />

assessing the speed at which carbonisation and chlorides are spreading<br />

when it comes to Slating how quick ly specific damage will<br />

continue to develop.<br />

When evaluating the speed of damage destruction one should particu<br />

larly note that different kinds of damage take different courses:<br />

• No development<br />

• Decl ining course of development<br />

• Steady pace of development<br />

• Accelerating pace of development<br />

No Development<br />

Figure 5.4-1 ill ustrates these points. The following sub-secti ons<br />

provide more detailed descriptions of the different courses of<br />

development.<br />

An exampl e could be spalling due to traffic impact. This can arise<br />

quite suddenl y, yet does not develop any further. The damage is<br />

either so immaterial that no action need be taken or so serious that<br />

immediate measures are required. One should, however, real ise<br />

that minor damage to concrete and steel due to traffic impact that<br />

is not repaired in the long run can later lead to secondary damage<br />

such as corrosion.


Declining Course of<br />

Development<br />

Steady Pace of Development<br />

Accelerating Pace of<br />

Development<br />

This can be exempli fied by settlement whi ch usually develops<br />

quickly at the start and then later begins to decline. Nevertheless<br />

one should be aware that settl ement can demonstrate both a steady<br />

and an accelerating course of development.<br />

Rutting can act as an example here. Its development wi ll usuall y<br />

be linear, but an increase in wear and tear must be reckoned with<br />

when the ruts become deeper because traffic impact wi ll be more<br />

concentrated.<br />

Examples of this kind of damage are insufficient surface<br />

cover/damaged cover, secondary damage such as rein<strong>for</strong>cement<br />

corros ion or spal1ing. Since the cover has become carboni sed or<br />

infected with chlorides, the corrosion process wi ll start in the rein<strong>for</strong>cement<br />

clements with least cover with the consequent development<br />

ofspal1ing in the area of these steel elements. As the extent<br />

of the carbon isation or the effects of the chlorides penetrate deeper<br />

into the concrete, so the speed of corrosion development in the<br />

already corroded rein<strong>for</strong>cement elements wi ll increase, and the<br />

corrosion wi ll spread to new rein<strong>for</strong>cement. As a consequence<br />

both corrosion in the rein<strong>for</strong>cement and flak ing will demonstrate<br />

an increasing trend.<br />

Inspection<br />

I<br />

InspeCtion<br />

I<br />

Time I<br />

to Concrete J<br />

== I<br />

I<br />

I<br />

SetUemenl<br />

I<br />

I<br />

o<br />

CotliSion<br />

I<br />

I I J Critical ConOition<br />

----,- --~------<br />

I<br />

I<br />

L -1_ - - - - - - , ____ _<br />

Figure 5.4-1: The Development o/Damage<br />

5.4.3 Compound Damage<br />

Damage to bridges is often composed of severa l types of damage.<br />

Corrosion of rein<strong>for</strong>cement elements often occurs together with<br />

spalling and insufficient/damaged cover.


Whatever types of damage are observed should be used to describe<br />

them, but their assessment shou ld be carried out as a totality. For an<br />

example please refer to Figure 5.4-2.<br />

- -<br />

•<br />

. --.<br />

~-<br />

, ~ - ~<br />

-<br />

\ .<br />

\<br />

•<br />

I "; / /<br />

--'-<br />

Figllre 5.4-2: InsufJiciell//damaged Cover. Corrosion /0 Ille Rein/oreemenl (111(/<br />

Spalling.<br />

The damage illustrated in Figure 5.4-2 consists of insufficient/damaged<br />

cover, corrosion to the rein<strong>for</strong>cement and spalling. Such compound<br />

damage can be assigned different degrees of damage f or carrying capacity,<br />

maintenance costs, the environment and the bridge's overall appearance.<br />

The table be low provides an example of how to describe and<br />

present specific damage.<br />

Evaluation of Compound<br />

Damage<br />

Descri tion of the Dama e C T M E<br />

Insufficient/damaged cover, oorrosion of the rein<strong>for</strong>cement<br />

and spaJlillg on lhe underneath side of the deck. I 2 3<br />

The basis <strong>for</strong> the above damage evaluation is as follows:<br />

The corrosion has occurred in structural rein<strong>for</strong>cemen t but its speed of<br />

development is so low that the carrying capacity wi ll remai n unaffected<br />

<strong>for</strong> the next ten years. A degree of damage of I has been allocated with<br />

respect to cart)'ing capacity (C). The amount of concrete falling off<br />

does not represent any danger to traffic safety (T) since no traffic passes<br />

under the bridge. This column has consequently been left blank.<br />

Even though the speed at which the corrosion is spreading is low, there<br />

exists the probability of the corrosion spreading to several other rein-


fo rcement el ements with a resultant increase in the extent of spa l ~<br />

ling. In tum this will lead to increased repair costs. A d egree of<br />

damage of2 has been given <strong>for</strong> maintenance costs (M).<br />

The bridge is si tuated in an urban environment; consequently s p al~<br />

ling and corroded rein<strong>for</strong>cement present a very unsatisfactory<br />

impression <strong>for</strong> bridge users. A score of 3 has thus beeIll allocated to<br />

environment and overall appearance (E).<br />

5.5 Prioritising<br />

Maintenance<br />

When evaluating damage as already described in Chapters 5.3 and<br />

5.4 it will be possib le in the future to draw up a consciously<br />

thought out prioritisat ion of what damage should be repaired only<br />

once the consequences of possibly de laying maintenance <strong>for</strong> bud~<br />

getary reasons have become known.<br />

However, maintenance should be carried out as and wilen described<br />

in an inspection jfthe damage affects carrying capac ity or traf~<br />

fie safety. Should such maintenance be delayed <strong>for</strong> budgetary<br />

reasons, the consequences may well be a reduction in traffic flow<br />

or the implementation of safety measures.<br />

Additionally when prioritising maintenance one ought to take into<br />

consideration the fact that items of less serious damage can be<br />

delayed if its locat ion allows it to be postponed and easily included<br />

with repairs of serious damage using the same rig or scaffolding.<br />

Table 5.5~ I shows an exampl e of prior it ising and grouping m a int e~<br />

nance tasks as indicated in the previous paragraph.<br />

Priority Element - Damilge Degree of Damage & Time (Of Maintenance<br />

Consequences<br />

I Parapet 4T At unce or within 6 montlt~<br />

- end piece 4T at Lhc:: !~test<br />

Joints<br />

- loose screws<br />

2 Wearing course 3M,2T Ought 10 be carried out<br />

-ru"<br />

within 3 years, hut can be<br />

I OOSIDOnoo a Iitl le<br />

3 ae,~ Ought to be tarried out<br />

- paint damage 2C, 3M within 3 years, but tan be<br />

postponed <strong>for</strong> 4 to 10 years.<br />

Cross girders<br />

All of these elements require<br />

- rdn<strong>for</strong>ccmtnt torrosion maintenaoce simultaneously<br />

2e, 3M as they also need staffolding<br />

Bearings<br />

on the undersid e of the<br />

- cleaning 3M bridge.<br />

- ad iustments 2M<br />

Table 5.5-1: Priori/ising alld GroupingojMaimell(lnce Tasks


5.6 Cause(s) of Damage<br />

The most common causes of damage have been gathered and systematised<br />

using the two digit codes detailed in the foll owing section.<br />

There can be several causes of damage.<br />

Figllre 5.6-1: Hairlinefraell/res &<br />

cmch causetl by Defecl No. 15<br />

Alkalille Reactil'e Materials<br />

Visual checks, suppl emented by measurements and materials testing,<br />

fo rm the basis of determining the cause of damage. However,<br />

a thorough knowledge of tile planning, construction and management<br />

of bridges is also important. The success ofa repair depends<br />

often on correctl y determin ing the primary cause of the damage<br />

when describ ing repairs.<br />

There is no requirement to provide the calise of damage after an<br />

infonnal inspection, but the cause of damage must be given after<br />

all other types of inspection whenever possible.<br />

"-igure 5.6-1: Corroded rein<strong>for</strong>cemenl<br />

due 10 Defect No. 31<br />

Incorrectl), Placetl reillf orcemenl &<br />

No. 34 bwif.jicient Finishing<br />

" ,<br />

Figllre 5.6-3: Hairlille Fractures &<br />

Cm cks dlle to Defect No. 61 Traffic<br />

Loads<br />

Figllre 5.6-4: Gap c(llI.\·el! by traffic<br />

impaci (No. 71)


Cause of Damage<br />

I<br />

Faulty Design<br />

11 lncorrect choice of materials<br />

12 Erroneous calculations<br />

13 Poor design solutions<br />

14 Deviation from standards<br />

15 Inadequate regulations<br />

19 Other fau hy design<br />

2 Material DamagelDefect<br />

21 Poor material composition<br />

22 Inadequate strength<br />

23 Delamination<br />

24 Chloride introduced during mixing<br />

process<br />

25 Alkaline reactive aggregates<br />

29 Other material defects<br />

3 Faulty Construction<br />

31 Settlement of scaffolding<br />

32 Incorrectly placed rein<strong>for</strong>cement<br />

33 Faulty concreting<br />

34 Insufficient finishing<br />

35 Inadequate curing procedures<br />

36 Premature loading<br />

37 Installation fault<br />

39 Other faulty construction<br />

4 Insufficient Maintenance<br />

41 Excessive vegetation<br />

42 Insufficient removal of ice<br />

43 Untimely application of protective<br />

measure<br />

44 Inadequate maintenance<br />

• Wrong materials selected.<br />

• improper or wrong calculations.<br />

• Poor design with regards to maintenance<br />

• i.e. those in <strong>for</strong>ce when the bridge was<br />

constructed.<br />

• e.g. coastal bridges which have been<br />

constructed according to the regulations laid<br />

down <strong>for</strong> inland bridges<br />

• Wrong or improper compositions of materials<br />

or incorrect concrete mix<br />

• Can be like: Poor quality of materials in<br />

taking compression, less tension capacity than<br />

expected, less shear capacity etc ..<br />

• Separation of material into layers.<br />

• Chlorides from aggregates or additives during<br />

the mixing of concrete.<br />

• Aggregate containing alkal ine minerals<br />

• Vertical movement of scaffolding.<br />

• Rein<strong>for</strong>cement not located within the<br />

limitations of tolerance.<br />

• Wrong vibration, to dense rein<strong>for</strong>cement, etc.<br />

• The surface is not in accordance with<br />

requirements.<br />

• Lack of or poor curing lead ing to cracks,<br />

improper quality etc ..<br />

• Loading be<strong>for</strong>e concrete has achieved<br />

required strength.<br />

• Improper installation of a component<br />

• Vegetation growth in river course that can<br />

obstruct the waterway<br />

• Lack of or improper removal of ice<br />

• Incorrcct protection of material<br />

• Maintenance work not carried out in


49 Other insufficient maintenance<br />

5 Environment<br />

51 Chloride loading<br />

52 Sulphate attack<br />

53 Carbonation impact<br />

54<br />

55<br />

56<br />

57<br />

58<br />

59<br />

Leaching<br />

Frost attack<br />

Abrasion<br />

Biological attack<br />

Chemical attack<br />

Other environmental attacks<br />

accordance with regulations/procedures<br />

• From de-icing salt, sea or other salty source.<br />

• Deterioration due to sulfatic acids or materials<br />

• Reaction between the carbon dioxide in the air<br />

and the lime in the building material.<br />

Reduction of the concrete's ability to protect<br />

the rein<strong>for</strong>cement against corrosion.<br />

• When calcium is washed out of the concrete<br />

and deposits as lime on the surface.<br />

• Freeze/thaw cycles that may cause sl'all ing.<br />

Happens normally with porous conc rete.<br />

• Wearing or grinding away of surface material<br />

by water or traffic<br />

• C.g. fungi, maggots<br />

• e.g. acids etc.<br />

6<br />

61<br />

62<br />

63<br />

64<br />

65<br />

66<br />

67<br />

68<br />

69<br />

7<br />

71<br />

72<br />

73<br />

74<br />

75<br />

76<br />

79<br />

Live Loads<br />

Traffic loads<br />

Soil pressure<br />

Impact from currents<br />

Wind impact<br />

Ice impact<br />

Temperature<br />

Shrinkage/Creeping<br />

Impact from overloads on wearing<br />

surface<br />

Other loadings<br />

Accidents<br />

Vehicular impact damage<br />

Impact caused by vessels<br />

Flooding<br />

Landslide! Avalanche/Rockslides<br />

Explosion<br />

Fire attack<br />

Other accidents<br />

• Damage caused by loads from traffic<br />

• Damage caused by soil pressure<br />

• Damage caused by pressure from flowing<br />

water<br />

• Damage caused by wind pressure.<br />

• Damage caused by ice pressure.<br />

• Damage caused by temperature changes<br />

• Time dependent effects which can result in<br />

cracking (shrinkage) and de<strong>for</strong>mation (creep)<br />

• Damage of wearing surface caused by<br />

overloads.<br />

• Damage daused by vehicles.<br />

• Damage caused by vessels when navigable<br />

water under the bridge.<br />

• Damage caused by flood.<br />

• Damage caused by<br />

landslide/avalanche/rockslides<br />

• Damage caused by explosion<br />

• Damage caused by fire.


8<br />

8 1<br />

82<br />

83<br />

84<br />

89<br />

Damage Incurred In Service<br />

Normal wear and tear<br />

Consequential/secondary damage<br />

Impact damage from snow removal<br />

equipment<br />

Vandalism<br />

Other cause to incurred in service<br />

damage<br />

e.g. in the wearing course, surface treatmen t etc.<br />

e.g. de <strong>for</strong>mation of the superstructure due to<br />

settlement, discoloration from leaks and moisture<br />

etc ..<br />

• Damage caused by snow ploughs, graders or<br />

other snow removal tools.<br />

• Damage caused by vandalism<br />

9 Other/U nknown Cause of Damage


6 Carrying out<br />

<strong>Inspections</strong><br />

Ba sis of BRUTUS<br />

Internationa l<br />

Any re levant reports and possibly also drawings should be examined<br />

be<strong>for</strong>e carrying out an inspection with the exception of in <strong>for</strong>mal<br />

inspections.<br />

The access and safety equipment required <strong>for</strong> carrying out a specific<br />

inspection should be detailed in the BMS.<br />

For those bridges recorded in the BMS according 10 given axes<br />

inspection <strong>for</strong>ms should incorporate their elements and the corresponding<br />

axes, -numbers.<br />

The inspection should begin with the lowest axis and progress in<br />

ascending order of axis number. In the absence of classificalion by<br />

axis number in the BMS the inspector should assess whether this<br />

should be introduced.<br />

Systematic Checks<br />

11 is imporlant to inspect bridges in sllch a way that all clemen Is<br />

are checked in a systematic fashion. The following example shows<br />

the possible order in which the elements of a standard, large bridge<br />

could be checked:<br />

I. Ground<br />

2. Substructural elements accessible from land<br />

3. Sub and superstructural elements requiring a bridge lift <strong>for</strong><br />

inspection purposes.<br />

4. Elements belonging to the superstructure which can be in spec<br />

ted from the bridge or the ground<br />

5. Deck, wearing course and accessories<br />

However, the use o f a bridge lift must be assessed in the light of<br />

the above sequence.<br />

Measurementsf M ateria Is<br />

Testing<br />

Pupose of an Inspection<br />

These can be undertaken at the same time as visual checking or be<br />

clearly detailed so that someone else can carry them Ollt. Ifmeasurements<br />

and materials testing have already been planned in advance<br />

of an inspection, these should be specially assessed and adapted<br />

to the findings of the visual check.<br />

The purpose of the different inspections is described in Chapter B<br />

in the "Guidelines fo r the Management of <strong>Bridge</strong>s, whi lst the fo l­<br />

lowing chapters provide a more detailed description of how the<br />

inspections themselves wi ll be carried Ollt.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 59


6.1 Acceptance Inspection<br />

6.1.1 Scope<br />

An Acceptance Inspection incorporates a visual check of the entire<br />

bridge including any underwater foundati ons - please refer to<br />

Chapler 6.6. Cables and their hangers should also be checked <strong>for</strong><br />

suspension and cable-stayed bridges - see Chapter 6.5. Acceptance<br />

<strong>Inspections</strong> should be supplemented by measurements and materials<br />

testing - referto Table 7. 1-\ and Chapters 7.2 - 7.7.<br />

One must be fully aware of the: "Should the owner not advise any<br />

faults di scovered during the <strong>for</strong>ma l acceptance procedures, or<br />

which ought to have been discovered as a result of a customary<br />

careful inspection, he cannot then later plead ignorance of them,"<br />

Damage, faults and defects should be recorded along with their<br />

location. Refer to Chapter 7.1 concerning how to draw up the relevant<br />

reports.<br />

6.1 .2 Visual Checking<br />

This should be carried out at close quarters as described i n Chapter<br />

6.4.2 and should incorporate as a minimum the points lis ted below<br />

<strong>for</strong> indi vidual elements. Please refer to Chapter 9 'Detailed Li st of<br />

Categories of Damage' <strong>for</strong> the assessment of damage.<br />

The Ground<br />

Concrete El ements<br />

* Subsidence of embankment close to abutments, piers and<br />

columns<br />

* Erosion of in fill close to abutments or supports caused by rain<br />

water aC l'ion.<br />

* Materials used <strong>for</strong> ballast are of the prescribed type<br />

• The banks and/or the protection facilities against erosi on com<br />

ply with the description<br />

* Green/planted areas are as ori ginally proposed<br />

* Surrounding areas have been returned to their original condition<br />

• Clearing up operations have been carried out satisfactorily<br />

• Settlement of abutments, piers etc.<br />

• De<strong>for</strong>mation - the shape of the element is correct, e.g. straight<br />

ness/evenness, clearance, defl ection etc.<br />

• Unacceptable hair-cracks/cracks<br />

* Satisfactory quality - thickness, binding agents, evenlless, con<br />

struction - as well as the colour of the surface treatment<br />

• Unacceptable discolorati on due to leaks, dampness impact, cal<br />

cium deposits.<br />

• Insufficient/damaged surface treatment<br />

• Honeycombing or delaminati on<br />

• Spalling due to mechanical impact<br />

• Construction of the concrete's surface is as described<br />

• Formwork removed both from above and below water level<br />

• Nail s and fo rm work stays removed<br />

60<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


o<br />

Fig ure 6.1- 1: Honeycombing<br />

* Holes le ft by stays filled in as described<br />

teel Elements<br />

Timber Elements<br />

Wearing Course<br />

* Settlement or movement in, <strong>for</strong> example, the superstructure<br />

* De<strong>for</strong>mation - the shape of the element is correct, c:.g. straight<br />

ness/evenness, clearance, deflection etc .<br />

• Cracks<br />

* Quality and colour orthe surface treatme nt acceptable<br />

* Surface treatment of mounting joints<br />

* Screws and connections correctly installed<br />

* Transition between the concrete and other material s are as pre<br />

scribed<br />

* As fo r steel elements<br />

* Protection of end pieces<br />

* Dampness traps which can lead to rot<br />

* Correctly prepared so that the timber dries Oul after dampness<br />

impact<br />

* Wearing course and, ifnecessary, the membrane are of the pre<br />

sc ribed type<br />

* Correct thickness - assess need <strong>for</strong> taking measurements<br />

* Finishing edges with joints and raised pavements correctly con<br />

structed<br />

* Depressions - assess need to take measurements<br />

* The drop to the drainage pipe/drain<br />

* Has any damage occurred sllch as fractures and cracks<br />

* Fonnwork, concrete leftovers etc removed<br />

* Cast of pillows underneath bearings correctly carried out wit<br />

hout damage<br />

* Bearing properly located, e.g. facing the correct dir..::ction of<br />

movement<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 61


Bearings & Bea ring Shelves<br />

'" Bearing's positionldefonnation correct in relationship to actual<br />

temperature<br />

'" Protective bellows properly installed<br />

'" Surface treatment as prescribed<br />

Figllre 6.1-2: Too {o w Joilll-Sleeper<br />

Joints & Joint Construction<br />

Pa rapets<br />

Drainage System<br />

'" Formwork removed from joint openings<br />

'" Size of joint openi ngs correct in proportion to the prevailing<br />

!temperature<br />

'" Are the prescribed joint constructions watert ight?<br />

'" Joint sleeper of correct qualit ies and heights<br />

'" Verticall y and horizontall y correctl y shaped<br />

'" Methods of attachment in accordance with regulations<br />

'" Colour and smoothness of surface treatment satisfactory<br />

'" Transition to road guard ra ils carried out in accordanc e with<br />

regulations<br />

'" Corrcct level <strong>for</strong> the upper cdge<br />

'" Sealant around drainpipes and drains sati sfactory<br />

'" Pipe extension below the deck sufficient 10 avoid dam pness<br />

impact to elements located underneath<br />

'" Drain outlets/pipes adeq uately attached and joints tightened<br />

'" Heating cables fu nction as prescribed<br />

6.2 Warranty Inspection<br />

6.2.1 Scope<br />

A Warranty Inspection wi ll incorporate a visual check of the whole<br />

bridge structure as fo r an Acceptance Inspection ~ see C:hapter<br />

6.1. 1. Usua ll y only those measurements and materials testing prescribed<br />

<strong>for</strong> an Acceptance Inspection should be carried o ut. If<br />

damage has occurred during the warranty period Ihe scope of any<br />

measurements and materials testing must be re-assessed ~ refer to<br />

Table 7. 1- 1 and Chapters 7.2 ~ 7.7. For maki ng reports r efer to<br />

Chapter 8.1.<br />

62<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


6.2.2 Visual Checking<br />

The visual inspection should be carried out in the same way as <strong>for</strong><br />

a Major Inspection - see Chapter 6.4.2. Any inspecti ons of the<br />

cables or underwater foundations should con<strong>for</strong>m to Chapters<br />

6.5.2 and 6.6.2.<br />

6.3 Generallnspection<br />

6.3.1 Scope<br />

A General <strong>Inspections</strong> encompasses a simple visual check of all<br />

elements above water level. As much of the foundati ons below<br />

water level should be checked as is possible w ithout employing a<br />

diver. In addition, any specia l checks a lready detailed on (he<br />

inspection fonn should be carried out. Generally speaking, measurements<br />

o r materia ls testing are not required <strong>for</strong> General<br />

<strong>Inspections</strong>. However, the presence of serious rutting may render<br />

measurements necessary to check whether there is a risk of the<br />

dampness insulation being per<strong>for</strong>ated.<br />

The least that must be recorded during a General Inspection is<br />

damage req uiring repair be<strong>for</strong>e the next inspection, i.e. in practice<br />

damage assessed w ith Degrees of Damage 3 and 4. Refer to<br />

Chapter 8.2 <strong>for</strong> the submission of reports.<br />

6.3.2 Basic General I nspection<br />

This is a Basic Visual Inspection without the use of access equipment,<br />

i.e. most of the clements of a large bridge w ill have to be<br />

inspected at a distance. Neverthe less, binoculars should be used<br />

should certain details require to be looked at more closely.<br />

Underwater binoculars may be of assistance when inspecting<br />

items below the surface oftne water.<br />

Ground<br />

During a Visual Inspection each element should be checked<br />

<strong>for</strong> the presence of serious damage - refer to the list below. For<br />

damage assessment please see C hapter 9 Damage Evaluation<br />

Catalogue.<br />

* Settlement o f the ground undemeath the carriageway up against<br />

the abutment piers<br />

* Erosion of the embankment around the abutment pi ers due to<br />

surface water<br />

* More serious underwater damage caused by erosion which can<br />

be detected without using a di ver<br />

* Damage to embankment retaining walls<br />

* Unintentional removal or fi lling up ofloose material in the regi<br />

on of the foundations<br />

* Damming up of driftwood whi ch reduces the water flow<br />

* Unwanted vegetation and trees<br />

* Accumulation of combustible material s under the bridge<br />

* Damage to piles above the waterline<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 63


• Damage to permanent pi lewalls above the water level<br />

Figure 6.3-1: AcculI1ulation of<br />

Twigs and piecesofrree<br />

Figure 6.3-2: End Section of<br />

a Cross-Beam showing broken<br />

off concrete<br />

Concrete Elements<br />

Steel Elements<br />

• Serious sett lement, movement and de<strong>for</strong>mation<br />

• Spalli ng, broken off parts or other damage caused by traffic<br />

im pact<br />

• Discoloration of concrete surfaces due to water or graffi ti<br />

• Unwanted vegetation<br />

• Fonnwork or stays which have not been removed<br />

• General cleaning<br />

• Serious sett lement, movement and de<strong>for</strong>mation<br />

• Defonnation, cracks or breaks caused by tra ffic impact<br />

'" Discoloration due to leaks/dampness impact or graffiti<br />

'" General cleaning<br />

D<br />

Figure 6.3-3: Broken Sleel Girder<br />

64<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions


Stone Elements<br />

• Serious settlement/movement of the abutment piers or columns<br />

• Defonnation of stone arches etc.<br />

• Stone slip, stones falling out or missing stones<br />

• Cracked stonework<br />

• Discoloration due to leaks/dampness impact or graffiti<br />

• Unwanted vegetation growth on the element<br />

• General cleaning<br />

Figure 6.3-4: Stonesjallen 0111 ojlhe SIOJlework<br />

Timber Elements<br />

• Serious settlement/displacement of timber columns etc.<br />

• Defonnation of timber superstructure<br />

• Missing parts, braces etc.<br />

• Damage caused by rot<br />

• Chipping or broken off pieces due to traffic accidents<br />

• Discoloration caused by leaks/dampness impact, rust or graffi ti<br />

• General cleaning<br />

D<br />

Figure 6.3-5: ROlto limber Kerb<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 65


Wearing Course<br />

• Ruts<br />

• Cracks or fissures especially around joints<br />

• Crazing or holes<br />

• Flaking off thin wearing courses, e.g. epoxy<br />

• Chippi ng and rot damage (on timber decks)<br />

• Protruding plank ends and nails (timber decks)<br />

FiW-lre 6.3-6: Wear callsetf by Rills<br />

Bearing & Bearing Shelves<br />

Joints & Joint Construction<br />

• Cracks or fissures in sections of a bearing<br />

• Cleaning the bearing and its recess<br />

• Joint anchorage points - possible missing parts<br />

• Mechani cal damage, cracks, breaks in the constructioD due to<br />

sn ow~ c\ eari n g equipment or general wear ca used by tr affic<br />

• Condition of the joint edges & their operation; possibly missi ng<br />

edges<br />

• Cleaning of the joint construction and the gap<br />

Fil:,'1/re 6.3-7: Fixing poinls of a Joilll<br />

66<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


Parapets<br />

* De<strong>for</strong>mation due to traffic colli sions<br />

* Cracks or breaks<br />

* Loose or missing screws, bolts and other parts<br />

* Support struts/posts satisfactorily anchored<br />

* End secti ons and transition/connection to guard rai Ds compl y<br />

with regulations<br />

* General cleaning<br />

* Operating satisfactorily<br />

* Pipes and sand traps are free of blockages and cleaned<br />

Water & Dra inage System<br />

Pipes & Ca bles<br />

Other Equipment<br />

* Leaks and moisture impact (water and sewage pipes.)<br />

* A special list will be produced <strong>for</strong> each bridge<br />

6.4 Major Inspection<br />

6.4.1 Scope<br />

The major inspection consists of a visual inspection o:fthe entire<br />

bridge structure above water except <strong>for</strong> major inspection of cables<br />

described in chapler 6.2. Whenever considered necessary measurements<br />

and material investigations should suppl ement the visual<br />

inspection and serve as a basis <strong>for</strong> evaluation of the fu. ture development<br />

of any observed defects. Reference is made I~ Tab le 7.1-1<br />

and Chapter 7.2 - 7.7.<br />

When great need <strong>for</strong> repair is di scovered during the m.ajor inspection<br />

or when the infonnation gathered is insufficient te decide<br />

what type, degree, consequence, extent or cause of daJl1age that<br />

has been observed, a special inspection mllst be triggered.<br />

Reference to chapter 6.7. Also refer to Figure 6.7- 1.<br />

In the report it should be stated what kind and amount of measurements<br />

and material in vestigations that are needed and <strong>for</strong> which<br />

elements they have 10 be perfonned.<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong><br />

67


For reporting refer to chapter 8.2.<br />

6.4.2 Visual Inspection<br />

The Visual Inspection has to be per<strong>for</strong>med as a close visual inspection,<br />

which means that the inspector must be within reach of element<br />

concerned. This requirement can be suspended provided that<br />

a possible defect can be detected with certainty from a longer di s­<br />

tance. This may be the case <strong>for</strong> inspection of larger uni<strong>for</strong>m steel<br />

or concrete areas. In such cases representative areas should be<br />

selected <strong>for</strong> close visual inspection and the remaining areas left <strong>for</strong><br />

observation from a larger di stance. Hi ghly stressed areas such as<br />

bearings and joints should be subjected to close vis ual inspection.<br />

Serious damage and characteristic defects should be illustmtcd by<br />

means of photographs and lor sketches.<br />

It is necessary to use the appropriate means of access to reach within<br />

the speci fi ed distance of inspection. Reference chapter 4.2<br />

"Access Equipment".<br />

When perfonning the visual inspection all elements shall be surveyed<br />

<strong>for</strong> the existence oflhe following ty pes of damage or<br />

defects. Reference chapter 9 "Catalogue <strong>for</strong> Evaluation of<br />

Defects".<br />

The Ground<br />

• Subsidence of the subso il of the roadway close to the abutments<br />

or in the vic inity of the abutments or supports.<br />

• Erosion of infill close to abutments or supports due to ra inwater<br />

action<br />

• Scouring of river bed<br />

Figure 6.4-/ Erosioll oj£mbal1kmelll<br />

68<br />

Hand book <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


• Damage to slope protection<br />

• Damage to piles above water<br />

• Damage to pennanent sheet piling above water<br />

• Un planned removal or deposition offill material in the vicinity<br />

of foundations<br />

• Accumulation of waste etc. restricting the water flow<br />

• Excessive vegetation, trees etc.<br />

• Accumulation of combustible materials underneath bridges.<br />

Concrete Elements<br />

Steel Ele me nts<br />

• Settlement or movement of abutments, supports, superstructures<br />

etc.<br />

• De<strong>for</strong>mation of superstructure or other element due to differenti<br />

al settlement, excessive load or defomlation of scaffolding<br />

during construction.<br />

• Cracks and possible leakage through these. (It should be eonsi<br />

dered to register crack-widths and crack patterns). Special con<br />

sideration should be given to check anchorage zones of prest res<br />

si ng cables <strong>for</strong> cracks.<br />

* Defect to surface treatment<br />

• Discoloration of concrete surfaces due to leakage or graffiti.<br />

• Reduced or damaged concrete cover with possible future corro<br />

sion damage in mind (carbonisation, ch lorides, binding wire,<br />

di stance holders etc.)<br />

• Disintegration due to frost or weathering<br />

• Pouring defects or areas with obviously bad workmanship, areas<br />

with possible penetration of mo isture, pores in the surface etc.<br />

• Lack of adhesion and/or spalling of structural concrete, integral<br />

ly cast concrete, repaired areas, casting joints, prestressing anc<br />

horages, etc.<br />

• Spall ing, failure or other damage due to coll ision<br />

* Visible rein<strong>for</strong>cement bars or spall ing due to corrosion or woo<br />

den pieces cast into the concrete etc.<br />

• Obvious rein<strong>for</strong>cement corrosion or signs of ongoing corrosion<br />

processes shown by cracking along the outermost rein<strong>for</strong>cement<br />

bars or rust staining.<br />

* Satisfactory concreting around prestressing cable anchorages<br />

• Excessive vegetation, trees etc.<br />

• Scaffolding or ties left in place, etc<br />

• The general state of cleaning o f the considered element.<br />

• De<strong>for</strong>mation of superstructure or other elements due to differen<br />

tia l settlement of foundations, excessive load or col lision.<br />

• Relative movements of superstructure or other elements<br />

• Cracks or fa il ure in base material, welds, bolts or rivets<br />

• Defects in corrosion protection system (paint, galvanising, coa<br />

ting) and possible corrosion. The connection area between cone<br />

rete and steel is especially vulnerable. The same appli es to the<br />

upper flanges supporting wooden roadways.<br />

• Discoloration due to leakage or graffiti<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 69


=<br />

Figure 6.4-2 Rein<strong>for</strong>cement<br />

CorrosiOI/ 011(/ Spallil1g<br />

o<br />

Figllre 6.4-3 DeJeels oil/he Coating Sysrem wilh CorrosiOIl<br />

'" Loose bolts or rivets<br />

'" Missing bolts or ri vets<br />

'" Wear and tear between elements due to movements in_ the bridge<br />

'" Detai ls and profiles with accumulation of dirt and mo:isture<br />

'" General cleaning orthe element.<br />

Stone Elements<br />

'" Settl ements or movements of abutments and supports ,<br />

'" Defonnation of stone arches, etc.<br />

• Split masonry stones<br />

'" Leakage and moisture through abutments, arches etc.<br />

• Discoloration due to leakage or graffiti<br />

'" D isplaced masonry stones<br />

'" Lac king masonry stones<br />

'" Scouring or disintegrati on of mortar in joints<br />

'" Excessive vegetation, trees etc.<br />

• General cleaning.<br />

Figure 6.4-4 Cracks ill Stolles<br />

Timber Elements<br />

• Settl ements or movements of wooden supports, etc.<br />

• Defonnation in wooden sllperstmctures, etc.<br />

70<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong>


• Cracks in timber members<br />

• Splintering or fai lure due to collision<br />

• Defects in surface treatment<br />

• Discoloration due to leakage, moisture, corrosion o:r graffi ti<br />

• Timber decay due to rot or insects<br />

• Lacking parts, shoring, etc.<br />

• Defects in corrosion protection system (paint, galvanising, coa<br />

ting) <strong>for</strong> steel bolts and struts, with subsequent corrosion<br />

• General cleaning.<br />

Wearing Course<br />

• Cracking, especially close to expansion joints<br />

• Leakage or moisture caused by insufficient tightness of the wea<br />

ring surface. (This may result in moist areas and li my deposits<br />

underneath the roadway slab).<br />

• Assessment of wear due to studded tyres, etc. Meas urements<br />

shou ld be considered per<strong>for</strong>med<br />

• Unevenness<br />

• Crackled areas, holes, or bl istering.<br />

• Flaking oflhin wearing surfaces<br />

• Lack of adhesion to base course <strong>for</strong> separately cast wearing sur<br />

faces<br />

• Lack of sealing along edge beams and joints<br />

• Lack of slope towards drain pipes and outlets<br />

D<br />

• •<br />

"!'". ,:-<br />

• •<br />

Figure 6.4-5 Wear (fue 10 siudded lyres<br />

, • •<br />

• Correct thickness of wearing course, to be assessed by measure<br />

ments when required<br />

• Splinteri ng or rot damage (For wooden wearing surfaces).<br />

• Protruding na ils and board ends. (For timber weariDg surfaces).<br />

• General cleaning.<br />

Bearings & Bearing Shelves<br />

• The position of the bearing clements with regard to the actual<br />

temperature, to be measured ifnecessary<br />

• De<strong>for</strong>mation damage to elastomeri c bearing pads<br />

• Cracking or fa ilure to any part og the bearing<br />

• Defects in corrosion protection system (paint, galvanisi ng, coa<br />

ling) and possible corrosion of the bearing.<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong> 71


I<<br />

>I<<br />

>I<<br />

>I<<br />

>I<<br />

>I<<br />

Lack of contact in any part of the bearing<br />

Damage to protection cover<br />

Damage to anchor bolts.<br />

Defects in grouts, e.g. cracks, spalling etc.<br />

Damage to concrete bearing seats. Vulnerabl e in case of open<br />

joints in connection with use of dc-icing salt.<br />

Clean ing of bearing and bearing shelv<br />

Joints/Joint Construction<br />

>I<<br />

>I<<br />

>I<<br />

>I<<br />

>I<<br />

>I<<br />

>I<<br />

>I<<br />

Joint opening related to temperature, to be measured if necessary<br />

Mechani cal damage, cracks, or failure caused by traffi c or snow<br />

plough<br />

Unexpected leakage in waterti ght joints<br />

Damaged or lacking joint threshold<br />

Damaged or lacking anchorage of the joint<br />

Lacking parts in the expansion joint<br />

Blows or noise from the expansion joint when vehicles are pas<br />

sing by<br />

Clean ing status of the expansion joint.<br />

D<br />

Pa rapet<br />

>I<<br />

>I<<br />

>I<<br />

Defonnations due to coll ision<br />

Cracks or failure<br />

Defects in corrosion protection system (paint, gal vanis ing, coa<br />

ting) and poss ible corrosion. Posts are vulnerable where cast<br />

into concrete<br />

D<br />

Figure 6.4-6 RIlPllll'e ofS1eering<br />

Pill oflhe Bellring<br />

Figure 6.4- 7 Missillg ParI<br />

D<br />

Fil:,'1/ re 6.4-8 DlIlI!aged Cooling lind Corrosion<br />

72<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong>


• Discoloration<br />

• Loose or lack ing bolts or parts<br />

• Unsati sfactory connection of posts<br />

• Proper repairs or rein<strong>for</strong>cements per<strong>for</strong>med<br />

• Height in accordance with current regulations<br />

• Ends and transitions to road railing in accordance with current<br />

regulations<br />

• General cleaning.<br />

Drain Pipes and Outlets<br />

Pipes and Cables<br />

Other Equipment<br />

• Pipes and sand traps are open<br />

• Top at corrcct level<br />

• Scaling around pipes<br />

• Offspring underneath structures suffi cient to reduce risk of wet<br />

ting elements underneath<br />

• Defects to pipes such as cracks, corrosion, etc.<br />

• Suspension of drain pipes<br />

• Sealing of joints.<br />

• Damage to fittings<br />

• Damage to insulation<br />

• Leakage of water or sewage pipes<br />

• Unused pipes and cables that may be removed.<br />

• Special checklists to be issued <strong>for</strong> a particular bridge.<br />

o<br />

Figul'e 6.4-9 Corrosion of<br />

Draill System<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong><br />

73


6.5 Major Inspection of Cables<br />

6.5.1 Objective and Scope<br />

<strong>Inspections</strong> incorporate a visual inspection of the load-bearing<br />

cables, suspension rods and retaining elements so as to ensure<br />

these are fulfi lli ng their funct ion. Where necessary measurements<br />

and examination of materials should be undertaken to supplement<br />

the visual check and act as a basis <strong>for</strong> evaluating possible fu ture<br />

damage and wear. See Table 7. 1-1 and Chapter 7.2<br />

It is recommended that a special inspection is carried out whenever<br />

the main cable inspection reveals the need <strong>for</strong> repairs or this<br />

latter inspection has not been suffic ien tly thorough in order to<br />

determine the kind of damage, its consequences, extent or cause.<br />

Refer to Chapter 6. 7 ~ Special <strong>Inspections</strong>. It should be stated<br />

which measurements! materials inspections are to be carried out,<br />

their scope and location. See Chapter 8.2 <strong>for</strong> submitting the relevant<br />

reports.<br />

6.5.2 Visual <strong>Inspections</strong><br />

Visual inspections should be of the close type as detailed in<br />

Chapter 6.4.2 <strong>for</strong> main inspections.<br />

This involves carrying out a closc visual inspection of all cables<br />

from anchorage to anchorage and around the entire cross-section,<br />

and of both the upper and lower suspension<br />

rods and the suspension rod clamps. In special circumstances this<br />

special requirement can be departed from if one can with certainty<br />

detect anticipated damage from a longer distance. Thi s can be the<br />

case with clearly visible lengths of cable or suspension rods. In<br />

such cases representative sections should be selected fo r closer<br />

visual inspection whi lst the remaining areas can be inspected from<br />

greater distances. C haracteristical ly serious damage should be ill u­<br />

strated in photographs or sketches.<br />

Access equipment should be used as required so that one can reach<br />

the prescribed measuring distance. Refer to C hapter 4 .2 - Access<br />

Equipment.<br />

A bridge should be inspected in such a way that a ll its elements are<br />

systematically checked. Cables, anchorages, towers and suspension<br />

rods should be marked with a number which con<strong>for</strong>ms with the<br />

system <strong>for</strong> parts location as detai led in Chapter 2.4.3.<br />

Individual elements are to be checked <strong>for</strong> damage, defects and<br />

fau lts during a visual inspection as listed below. Please refer to<br />

Chapter 9 - Damage Evaluation Catalogue<br />

74<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions


load Bearing Cables<br />

• Broken strands. A cable is most subject to broken strands around<br />

the clamps, saddles and anchorage caps. Broken strands can be<br />

identified by longitudinal cracks in the painted surface along the<br />

edges of the broken strands. New brea ks should be marked on<br />

the sketch by specifying the cable number and the approximate<br />

distance from the tower, suspension rods or similar parts.<br />

• Corrosion. Cables should be checked fo r external corrosion and<br />

signs of internal corrosion. This is especially the case with<br />

unprotected cabl es. One indication of internal corrosion can be<br />

an increase in cable diameter.<br />

• Wear and tear/chaffing. Cables are often subj ected to wear and<br />

tear or chaffing around the suspension rod clamps if the suspen<br />

sian rods are hanging out of line.<br />

• Check whether any of the spinning material has begun to leak<br />

out of the inner cable.<br />

• The condition of the surface treatment should be evaluated.<br />

• Check whether there has been any slipping between cables and<br />

their saddles.<br />

• Packing around the saddl es. Ensure that the cables are compl e<br />

tely surrounded by packing material if this has been used and<br />

that the fasteners are in good condition. The packing material<br />

should be soft and elastic and bear no signs of cracks or other<br />

damage.<br />

Figllre 6. 5- /: Broken Strands of a Cable<br />

Saddles/ Bearings of<br />

Main Cables<br />

Anchorage Caps<br />

• Loose/missing bolts, nuts or clamp plates<br />

• Movement<br />

• Cracks<br />

• Corrosion damage<br />

• Condit ion of the surface treatment<br />

• Birds' nests or other <strong>for</strong>ms of surface soiling<br />

• Check that the anchorage caps arc correctly seated on their stays<br />

and that the tangents of the cabl es fonn the correct angles.<br />

• Check whether the cement grouting in the joints betwcen cables<br />

and cable heads is still intact. The grouting should be removed<br />

from a couple of the cable heads of each anchorage. If corrosion<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 75


is discovered in the grouting cement then all joints shou ld be<br />

checked. New cement grouting of the same type should be<br />

app lied to the joints once these have been thoroughly cleaned.<br />

• Check <strong>for</strong> sagging in the cast anchorage cones. This can be iden<br />

tified by the presence o f leaked casting material along the cable<br />

at the entrance to the cable head.<br />

Anchorage o f Ca bles<br />

• Some cable anchorages have been constructed in such a way<br />

that the cable head and parts of the cable have been cast in con<br />

crete. This concrete should be removed in order to release the<br />

cable up to the anchor head <strong>for</strong> inspection.<br />

Figure6.5-2: Cable Heads imbedded ill COllcrete<br />

• Cables/stays slink into weak soi l: an assessment should be made<br />

as to whether a partial excavation should be undertaken to deter<br />

mine their condition. However, excavation work must not in any<br />

way weaken the rivet holders <strong>for</strong> the gravitat ional anchorage<br />

points.<br />

Suspension Rod Clamps<br />

• Movement. The suspension rods should be checked <strong>for</strong> out-of-l<br />

line movement; check also whether the suspension rod plates<br />

have moved in such a way that the suspension rods are touching<br />

or rubbing against the cables.<br />

• Movement. Sagging can arise around the cable suspension rods<br />

between the cables and the cable cap. The cast metal can be<br />

extruded as thin flakes in the joint between the cap and the<br />

cable.<br />

• De<strong>for</strong>med bolts, clamps etc.<br />

• Cracked or broken bolts, clamps etc.<br />

76<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


* Damage to the surface treatment<br />

Figure 6.5-3<br />

Wear& Tear<br />


When an underwater main inspection has revealed the need <strong>for</strong><br />

major repairs or has not been adequate enough to ascertain the<br />

nature of any damage, its consequences, scope or cause, then more<br />

comprehensive measurements and materials testing may require to<br />

be carried oul.<br />

The inspection should be undertaken by di vers who must possess<br />

the necessary quali fications and approval in accordance with<br />

public regulations.<br />

Refer to Chapter 8.2 <strong>for</strong> making reports of Underwater Major<br />

<strong>Inspections</strong>.<br />

6.6.2 Visual <strong>Inspections</strong><br />

These should be made at close quarters, i.e. the diver should be<br />

able to touch the different bri dge elements.<br />

Be<strong>for</strong>e a visual inspection can be conducted all fo rm work and<br />

overgrowth remaining should first be removed from a large<br />

enough area so as to provide a sufficien tl y clear overview of the<br />

condition of the fou ndat ions. The anti-rust protection does not<br />

have to be taken away in order to remove absolutely all the <strong>for</strong>mwork.<br />

Ice Sheath ing does not require to be removed either.<br />

Overgrowth can be removed either with a barking spade orland a<br />

high pressure hose.<br />

In accordancc with Chapter 2.1.6 any damage should be recorded<br />

on fold-out drawings of the foundations.<br />

The foundations should be inspected from the riverbed upwards to<br />

the water surface and include tida l areas. Any damage should be<br />

photographed and described accurately.<br />

Each element is to be inspected <strong>for</strong> damage, defects and faults as<br />

detailed below. Refer 10 Chapter 9, Damage Eva luation Catalogue.<br />

Underwater (; round<br />

Concrete Elements<br />

'" Erosion and lor undermining of foundations<br />

'" Damming up caused by loose material, wood, branches whi ch<br />

can reduce the through flow of water.<br />

'" Damage to free-standing piles<br />

'" Damage to protection agai nst erosion<br />

'" Settlement/movement of abutment pi ers, piers etc.<br />

'" Hair cracks and cracks.<br />

'" Rein<strong>for</strong>cement with little or damaged cover.<br />

'" Weathering due, <strong>for</strong> example, to frost, strain caused by weather<br />

cond it ions etc. especially in areas subject to tides.<br />

'" Depressions/holes in castings or badly cast joints.<br />

'" Corrosion of the re in<strong>for</strong>cement or spalling.<br />

'" Areas subject to wash out.<br />

78<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions


Stone Elements<br />

Steel Elements<br />

Timber Elements<br />

* Settlement or movement<br />

* Cracks<br />

* Earth slips, landslides or mi ssing stones<br />

* Pointing which has been washed away or has becom e weathe<br />

red.<br />

* Settlement or movement<br />

* Cracks or breaks<br />

* Corrosion<br />

* Missing support braces/parts<br />

* Damage to cathodic protection<br />

* Settlement or movement<br />

* Cracks or breaks<br />

* Damage due to rotting<br />

* Missing pans/supporting sections<br />

* Corrosion of retaining bolts and steel stays<br />

* Worm infestati on<br />

* Scouring or wear and tear due to ice<br />

Figure 6.6-1 Erosion Gild Scouring<br />

Figure 6.6-2 Fa(led Areas<br />

6.7 Special Inspection<br />

When a special inspection has been initiated as a result ofa main<br />

inspection, the course of the inspection work could be as described<br />

below in Figure 6.7-1.<br />

6.7.1 Scope of Inspection<br />

A Special Inspection should be carried out either ofth.e entire bridge<br />

or only of critically exposed or damaged elements. A Special<br />

Inspection will encompass<br />

visual checks and/or surveys/materials testi ng.<br />

The type and scope of surveys and materials testing w ill be that<br />

stated in earl ier<br />

inspections, but should additionally be evaluated by t he Inspector.<br />

If the Special Inspection has not been in itiated by a previous<br />

inspection, the I<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 79


a'or ns ection<br />

Normal lnspecticn &<br />

Maintenan


6.8 Maintenance Measures -<br />

Extent of Damage<br />

The aim of carrying out maintenance to bridges is to ensure that<br />

the same standards and levels of safety are kept during their entire<br />

planned life.<br />

Agreed Time <strong>for</strong><br />

Maintenance<br />

Description of Measures<br />

Alternative Stratigies<br />

Pro cedural Codes<br />

Repairs to Concrete<br />

Maintenance shal l be carried out when the fo llowing three considerations<br />

coincide:<br />

-a) Costs are at thei r lowest point.<br />

-b) The bridge's carry ing capacity ca n be main tained.<br />

-c) Users are af<strong>for</strong>ded adequate safety and access.<br />

Addi tionally, one must ensure that a bridge does not negatively<br />

affect the environment and surroundings in whic h it is situated.<br />

Whenever a Major Inspection uncovers damage which requires<br />

ma intenance (Degree of damage 2), a descript ion of the required<br />

measures and associated cost overview must be drawn up.<br />

Following either a Major or Special Inspection an evaluat ion of the<br />

possible alternative ma intenance strategies can be undertaken in<br />

accordance with the Norwegian Public Roads Administration<br />

<strong>Handbook</strong> No. 147: "The Management, Running & Maintenance<br />

of <strong>Bridge</strong>s".<br />

The description of the measures to be taken should be based on<br />

procedures which comply with the Norwegian Public Roads<br />

Admi ni stra tion <strong>Handbook</strong> No. 026; " Procedural Codes - 2, 1997".<br />

The materi al s quanti ties incl uded under the different procedures<br />

should be decided on as much as possible at the bridge location.<br />

The extent of, fo r example, mechanical repairs to a concrete bridge<br />

are decided most eas il y by selec ti ng one or more smaller but representative<br />

areas or test sections. Here one can recordfevaluate the<br />

extent of the different kinds of damage.<br />

If the decision is taken to employ special repair methods such as<br />

the following:<br />

- Re-a lkalising<br />

- Chloride extraction<br />

- Cathodic protective measures<br />

then a simultaneous inspection should be carried Oul <strong>for</strong> the presence<br />

of surface impuriti es on, <strong>for</strong> exampl e, metal rein <strong>for</strong>cement<br />

spacers, nails and binding wires, al l of which could affect the technical<br />

and financial measures adopted. In addition, surface impurities<br />

can have an effect on the surface treatment of the concrete.<br />

Re pairs t o Steel<br />

As with concrete bridges it can also be of interest to undertake surveys<br />

of smaller representative sections of steel bridges showing<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions 81


evidence of deep-seated corrosion. In this way one can determine<br />

the size of the surface area requiring sandblast ing and the application<br />

of new paint surfaces.<br />

Surface Treatment<br />

The most conveni ent way of calculating the area that and treatment,<br />

is from the original drawings. If these do not exist,measurements<br />

must be per<strong>for</strong>med. In some cases there might be a necessity<br />

of taking samples in order to determine the type of coatings. The<br />

selec tion of repainting system is dependent on the existing coating<br />

system. In most cases it is reasonabl e to paint some test-areas<br />

be<strong>for</strong>e th e final painting system is being determined.<br />

Railings and Parapets<br />

Joints<br />

So far as damage to rai lings or parapets is concerned, measurements<br />

should be taken of the total length in meters of those sections<br />

to be repaired and those to be repl aced. The total number of<br />

posts to be rep laced should also be calculated.<br />

If the renewal of joint sections is considered a possibility, the joint<br />

apertures should be measured and th e temperature recorded. It will<br />

also be necessary to clarify whether the apertures are sufficiently<br />

wide or whether they shou ld be widened/narrowed. In add ition the<br />

length of the joint construction should be measured. A check<br />

should al so be carri ed out to determine whether there are ex isti ng<br />

railing posts which could be in the way of new joint constructions.<br />

Consideration should also be given to the need to jack up/adjust<br />

bearings due to differences in their settings.<br />

82<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


7 Surveys, Materials<br />

Tests & Instrumentation<br />

7.1 General<br />

It may be necessary to supplement visual checks by surveys, mat e~<br />

rials testing and instrumentation in order to find a better basis <strong>for</strong><br />

determining the extent orany damage, its cause, degree and consequences<br />

or <strong>for</strong> uncovering hidden damage.<br />

Scope<br />

The scope of these measurements and investigations must be evaluated<br />

in every case and will depend on:<br />

* The type of inspection<br />

• The type ofhridge<br />

• The type o f materials lIsed<br />

• Wear caused by the climate<br />

• Visual observations<br />

In order to carry out such measurements and in vestigations in a<br />

focused manner one should have a clear picture of their need and<br />

uti litarian value. For the sake of appearance, thi s is advisabl e with<br />

regard to the costs and the possib ly destructive measures employed.<br />

An overview of which surveys and material s testing can be undertaken<br />

in connection with the different types of inspections can be<br />

found in Table 7. 1-1. Provided the prescribed measurements and<br />

materials testing have been documented at the building stage,<br />

these do not require to be repeated <strong>for</strong> a completion survey.<br />

Special Routines<br />

Special routines may have been pu t into effect <strong>for</strong> certain bridges<br />

in connection with surveys, materials testing and/or surveillance<br />

by instruments. This will become evident from the inspecti on plan<br />

in BRUTUS International.<br />

Several of the surveys and materials in vestigations require special<br />

routines and additional quality assurance. Often special competence<br />

and equipment are also needed. Such is always the case <strong>for</strong> the<br />

installation of surveillance instruments. Refer also to Chapler 8<br />

- Reporting of Inspection Results.


TYPE OF INS PECTIONS<br />

0<br />

g<br />

Possible Measurements & Materials Investigations 0<br />

0 '5<br />

"5 0 0 ,<br />

0 0<br />

'5 .2 " 0.<br />

0- ~<br />

= .2<br />

~ 0 ti<br />

0<br />

= .2<br />

0 0. ti<br />

- 'u -<br />

" i\. ti<br />

" " "<br />

'"<br />

~ :0 " " 0-<br />

0 0. o.v ~<br />

0 c - =<br />

" • ~ - 0<br />

0<br />

•<br />

U = • 0<br />

15. r! - " -: ~ -<br />

• " 0 •<br />

" " 0<br />

o " ·0<br />

0<br />

I ~<br />

., 0<br />

0<br />

If . .~"<br />

;;:


All the measurements and materials investigations li sted in Table<br />

7. 1·1 are also described in the "Working procedure Code"<br />

(handbook from NPRA)<br />

Supplementary infonnation can also be found in Chapter 7.2 - 7.8<br />

of this manual. Amongst other things the fo ll owing in<strong>for</strong>mation<br />

has been detailed:<br />

Purpose of such measurements/investigations<br />

Advantages and disadvantages of the different methods<br />

Requ ired eq uipment<br />

Reference to other manuals which can provide more deta iled<br />

infonnation<br />

7.2 Measurements<br />

7.2.1 Levelling<br />

Purpose<br />

Procedures<br />

To measure settlement, movement and defannation and follow up<br />

possibl e developments.<br />

The need <strong>for</strong> levelli ng differs fo r new and older bridges, which is<br />

reflected in the need <strong>for</strong> levelli ng during completion surveys and<br />

other types of inspections.<br />

When measurements are taken on a bridge's superstructure, the<br />

effects of the vibration caused by heavy traffic must be taken into<br />

consideration. If serious vibrations are experienced, measurements<br />

should be taken during periods oflow traffic or while the bridge is<br />

closed <strong>for</strong> this purpose.<br />

Scope<br />

Acceptance Inspection<br />

For each bridge, levelling should be conducted on all axes and<br />

centrall y in each section.<br />

Levelling bolts require to be installed on bridges with foundations<br />

in weak ground. Regular measurements need not n0011ally be<br />

taken <strong>for</strong> bridges whose foundations have been sunk into rock;<br />

neither are levell ing bolts requi red.<br />

A decision must be reached as to whether follow·up is to be<br />

undertaken during the operational phase.<br />

Other <strong>Inspections</strong><br />

Any fo llow·up inspection in the operational phase stipulated<br />

during a completion survey must be carried Olii.<br />

Levelling must be undertaken in the event of settlement, move·<br />

menl or defonnation. Levell ing can be carried out direct ly on the<br />

relevant clements. However, if developments are to be fo llowed<br />

up over a period, then levelling bolts should be installed.


Equipment<br />

* Theodolite<br />

* Tripod<br />

* Levell ing pole<br />

* Measuring tape<br />

* Levelling bolts and hammer action drill, if necessary.<br />

Purpose<br />

7.2.2 Horizontal Distances/Displacement<br />

To measure movement, <strong>for</strong> examp le of abutment piers, piers,<br />

superstructure etc.<br />

Procedures<br />

Reference is made to Procedure Movement. Movement can often<br />

be noted in bearings and joint apertures and can be measured w ith<br />

a folding rule or poss ibly by using a sma ll spirit level. Movement<br />

in piers can be measured with a plumb linc. The measurement o f<br />

movement should be taken in connection with recording the temperature.<br />

Ifmovement has to be followed up over a period bolts<br />

should be installed between which the measurements are to be<br />

taken. In order to determine which parts are subject to movement,<br />

a levell ing instrument can be empl oyed .<br />

.. .<br />

• •<br />

Figure 7.2 ~ I MeaSliremelll of Displacemelll<br />

Acceptance Inspection<br />

sco pe<br />

For all bridges with moving bearings an inspection must be made<br />

of the bearing's placement, orientation and any displacement. The<br />

first two points should specifically be checked against the original<br />

drawings. The joint apertures and their associated temperatures<br />

should also be recorded.<br />

Other <strong>Inspections</strong><br />

The need <strong>for</strong> taking measurements should be assessed in connection<br />

with the visual inspec tion.<br />

Equipment<br />

Purpose<br />

* Fol di ng rul e<br />

* Spirit level<br />

* Plumb and line<br />

* Thennomeler<br />

* Levell ing Telescope<br />

7.2.3 Measuring the Thickness of Wearing<br />

Course<br />

To measure the thickness of the asphalt wearing surface on the<br />

bridge deck to check whether it meets requirements or not.


Procedures<br />

Scope<br />

Equipment<br />

The thi ck ness of the wearing surface may vary in a crosswise<br />

direction <strong>for</strong> bridges on a bend.<br />

Acceptance Inspection<br />

A minimum of three sets of measurements must be taken along the<br />

centre line as we ll as along each side of the bridge at 100 metre<br />

gaps. At least four sets of measurements should be carried out per<br />

bridge.<br />

Measuring the thi ckness of concrete wearing surfaces should be<br />

conducted as <strong>for</strong> locating rein<strong>for</strong>cement elements (See Chapter<br />

7.3.1: Locating Rein<strong>for</strong>cement Elements - Measuring Cover).<br />

Other <strong>Inspections</strong><br />

The need fo r taking measurements should be assessed in connection<br />

with the visual inspection. The scope of the measurements<br />

should be the same as <strong>for</strong> a completion survey.<br />

* Fo lding rul e<br />

* Drill<br />

* Ma terial to refi ll holes<br />

Figure 7.2-2: Measurillg Track Wear<br />

Purpose<br />

7.2.4 Measuring of Ruts<br />

To measure the depth of wear in the tracks created by studded<br />

lyres in the wearing surface.<br />

Reference is made to rel evant procedures.<br />

Scope<br />

Acceptance Inspection<br />

The measurement of track wear is not relevant.<br />

Equipment<br />

Other inspections<br />

When track wear indicates a need <strong>for</strong> taking measurements, measurements<br />

should be made in a minimum of two sections of tile<br />

bridge - one wi th minimal, the other with maximum wear - lIsing a<br />

straightedge. For long bridges over 200 metres, measurements are<br />

to be taken in one section <strong>for</strong> every 100 metres. The depth of the<br />

wear should be recorded crosswise every 250 metres.


A special note should be made whenever track wear is so great that<br />

the dampness insulation material or the bridge dec k have become<br />

visibl e.<br />

Equipment<br />

• An aluminium straight edge rul e<br />

• A measuring wedge<br />

Purpose<br />

Procedures<br />

Scope<br />

Equipment<br />

7.2.5 Measuring Evenness of the Deck Surface<br />

To measure the evenness of the wearing surface of new bridges or<br />

whcnever a new wearing surface has been laid on older bridges.<br />

Reference is made to Procedure 87. 1815. Damage No 604 on page 266<br />

Acceptance Inspection<br />

Measurements fo r evenness can be taken using a straightedge or a<br />

measurement vehi cle. The height of the joint construction should<br />

be checked in relationship to the wearing surface and then recorded.<br />

Other <strong>Inspections</strong><br />

Evenness measurements are not nonnally carried out.<br />

• Straight edge, either 1 or 3 metres long with lugs<br />

• Measuring wedge<br />

Purpose<br />

7.2.6 Measuring Sag<br />

To measure the relative sag in suspension bridge cables in order to<br />

check the loads in the suspension rods.<br />

Relative Sag<br />

Plumb line<br />

Hanger


Procedures<br />

Scope<br />

Sag is measured using cord or possibly piano wire as indicated in<br />

Figure 7.2-3. A bob should be hung on the end of the cord; alternati<br />

vely a spring balance may be used. The vertical distance bctween<br />

the central suspension rod and the taut cord (the amount of sag) is<br />

then measured. The procedure is repeated <strong>for</strong> all suspension rods 0<br />

n both sides o f the bridge. The amount of sag is nonnally the same<br />

over the whole bridge, but can vary somewhat near the towers<br />

because ofthe di stance between the fi nal suspension rod and the<br />

tower, and the tension of the braces. It is important that the bridge<br />

is not subject to traffic loads or lift during measuring.<br />

Acceptance Inspection<br />

Sag should normally be measured in conjunction with the bridge's<br />

construction . However, iflhis cannol be shown 10 be documented,<br />

then these measurements should be taken during the Acceptance<br />

Inspection.<br />

Main Cable Inspection - Special Inspection<br />

The need to take these measurements should be evaluated during<br />

the visual inspection.<br />

Equipment<br />

Purpose<br />

Procedures<br />

Scope<br />

• Cord, possibly piano wire<br />

• Plumb line, possibly a spring balance<br />

• Folding rule<br />

7.2.7 Recording <strong>Bridge</strong> Details<br />

To record:<br />

• mi ss ing data co ncerning elements, element types, size etc.<br />

• marking a bridge<br />

• erecting traffic signs<br />

• bridge drawings (completed drawings)<br />

• archi ve/computer system data<br />

Procedures and eq uipment requirements wi ll vary according to the<br />

task in hand.<br />

Acceptance Inspection<br />

Should data <strong>for</strong> new bridges not have been recorded at the building<br />

stage, then this should be done at the latest during the Completion<br />

Survey.<br />

Major Inspection - Special Inspection<br />

The data in BRUTUS should be checked <strong>for</strong> accuracy. Additional<br />

inspections should be carried out after reconstruction or rein<strong>for</strong>cement<br />

works.<br />

Equipment<br />

• Trip counter<br />

• <strong>Bridge</strong> traffic sign and tools <strong>for</strong> erecting it<br />

• Fo ld ing rule<br />

• Measuring tape<br />

• Camera<br />

• Surveying equipment


7.2.8 Measuring of Vertical Clearance<br />

Purpose<br />

Procedures<br />

Scope<br />

To measure the headroom <strong>for</strong> bridges crossing roads and the clearance<br />

<strong>for</strong> sh ips under bridges over the sea or other water.<br />

A headroom check may become necessary after rcasphalting or<br />

ot her changes to the roadway or, <strong>for</strong> example, after a heavy load<br />

has used the road. Depending on the bridge's design and the purpose<br />

of the measurements it may be relevant to take maximum and<br />

minimum headroom measurements.<br />

Acceptance Inspection<br />

Should the headroom of a new bridge not have been carried out at<br />

the building stage, then this should be done al the latest during the<br />

Completion SUlVey.<br />

Major Inspection - Special Inspection<br />

Headroom should be measured after rcasphalting or other works<br />

which can affect a bridge' s headroom.<br />

Equipment<br />

* Measuring tape<br />

* Telescopic measuring rod<br />

* Surveying equipment<br />

7.3 Adequate Materials<br />

Investigation - Concrete<br />

The following sections provide a description of the materials in vestigations<br />

which can be undertaken during the inspection ofbridges<br />

and their concrete elements.<br />

When evaluating the condition of a concrete construction it is<br />

important 10 remember that the different materials investigations<br />

should be viewed in relationship to one another.<br />

The local ising of materials investigations fo r coastal bridges is<br />

specificall y dealt with in Chapler 7.3.9.<br />

Refilling Test Holes..cuts<br />

Several of the materials investigations carried out on concrete<br />

require the drilling of holes or chiselling out cuts in the concrete.<br />

Procedural Code - 2 lays down a requirement in sllch instances<br />

that the holes/cllts be refilled. However, no guidelines have been<br />

given as to how th is should be completed. The foll owing procedures<br />

have there<strong>for</strong>e been recommended:<br />

Holes of a Diameter < 25 mm<br />

The hol es should be fi ll ed with grey paintable single-component<br />

polyurethane grouting or equivalent cement mortar,<br />

The holes should be completely fi lled using a tube connected to a


grouting gun pushed all the way to the bottom of the hol e. As the<br />

hol e fill s up the tube is gradually removed.<br />

Holes resulting from Core Drilling or larger Chiselled Cuts<br />

Dust and loose particles should be cleaned out with water after<br />

which any water remaining should be dried up . The mortar to be<br />

used <strong>for</strong> the repair(s) should be mixed to the required consistency<br />

and put in the ho le(s) to 2·3cm below the surface level. Once the<br />

mortar has set the remainder of the hole should be fill ed with mar·<br />

tar flush with the surface. Immediately thereafter a layer of thick<br />

elastic cement-based coating should be applied to the surface.<br />

Mortar used to repair holes resulting from core dri ll ing or larger<br />

chiselled cuts should satisfy the same requirements <strong>for</strong> mortar<br />

used during mechanical repairs.<br />

Purpose<br />

Procedures<br />

7.3. 1 Locating the Rein<strong>for</strong>cement - Measuring<br />

its Cover<br />

To locate the rein<strong>for</strong>cement and measure its cover.<br />

Reference is made to the Nonvegian Public Roads Administrati on<br />

<strong>Handbook</strong> No. 015: "Tests carried out in the Field", Method<br />

No. 15.542.<br />

The description given in the procedural code of how cover is measured<br />

should be used to obtain accurate measurements. However,<br />

these can be simpl ified as follows if the measurements are more in<br />

the nature of a spot test:<br />

In the area where the cover is to be measured locate the load bearing<br />

rein<strong>for</strong>cement and the direction in which it is lyi ng. If possible<br />

the nearest mounting rod should also be located<br />

The cover is to be measured <strong>for</strong> a minimum of three rods in the<br />

outennost layer of the load bearing rein<strong>for</strong>cement.<br />

Measurements are to be taken at a point halfway between intersecting<br />

rods (see Figure 7.3- 1).<br />

x<br />

®<br />

x<br />

x<br />

o x<br />

,<br />

Me8wrernent poinllOl I~d l;JeR ri~ reinloroem ent<br />

Outermost layer<br />

of load bearing<br />

rein<strong>for</strong>(lement<br />

>,·-1 . Intersecting Rods: ,....,. ,<br />

• I<br />

Itw! nf!'xt outermo!ll<br />

layer of load bc.aIing ~.<br />

Mounting fl od<br />

,<br />

..,<br />

. . .<br />

" . ,~~ .<br />

, '<br />

,... ......<br />

......<br />

.,<br />

' ~,'\ ~ ....... ,<br />

. ,<br />

. . ,<br />

" •• II' .\, •<br />

",.<br />

MeR!2IurerTlPrnt point tm mountin9 Rnds Figure 7. 3-1 Defil1ition a/takil1g a Cover MC(Jsuremelll by Spot Testing<br />

The cover <strong>for</strong> possibl e new mounting rods has to be measured at<br />

least one point.


A report should be made of the cover measurements incorporating<br />

the three values obtained <strong>for</strong> the load bearing rein<strong>for</strong>cements<br />

together with the average of these. An additional report should be<br />

given <strong>for</strong> the mounting rod cover.<br />

scope<br />

General<br />

Taking measurements of the cover can be relevant in the fol lowing<br />

situations:<br />

It is likely that the cover is less than Ihal described, e.g. on the<br />

underside of the bridge deck, and areas with rein<strong>for</strong>cement guides<br />

or h a lf~ lap joints.<br />

Neither rein<strong>for</strong>cement spacers nor mounting rods have been used.<br />

Clearly corroding rein<strong>for</strong>cement with little cover ava ilable.<br />

Large amount of stress due to chloride.<br />

Places where other materials investigations are being carried out.<br />

Figure 7.3-2: Measurillg the COI'cr<br />

Acceptance Inspection<br />

The cover of all concrete elements should be checked if this has<br />

not already been done during the construction phase. For small<br />

bridges such as culverts and single-span simply supported bridges<br />

at least ten measurements should be taken of the cover spread over<br />

both Ihe super and substructures. For larger bridges the scope of<br />

testing should be evaluated, but should lie between 5 and 10 measurements<br />

per 100 square metres of concrete.<br />

Major Inspection<br />

If it is suspected that there is little cover, spot checks should be<br />

conducted of the cover. Should these suspicions be confinned,<br />

then the scope of the inspections can be extended.<br />

Special <strong>Inspections</strong><br />

Measurement of the cover is 10 be carried oul in accordance with<br />

specifi c requirements. The scope and location should be adapted<br />

to the situation.<br />

Equipment<br />

Advantages and<br />

Disadvantages<br />

* Covermeter<br />

* Drawings of the rein<strong>for</strong>cement, if necessary<br />

* Folding rule<br />

* Sl ide calliper<br />

* Chalk<br />

* Hammer aclion drill <strong>for</strong> use in measurementlesting<br />

* Materials and equipment <strong>for</strong> refilling holes<br />

This is a simple, n o n~d estructive, speedy method which allows<br />

one 10 chec k large areas in a short lime. The di sadvantage is that<br />

some cover meters indicate an incorrect cover thickness <strong>for</strong> closely<br />

spaced rein<strong>for</strong>cement. Cover meters should there<strong>for</strong>e be ca libra~<br />

ted according to the density of the rein<strong>for</strong>cement.


7.3.2 Measuring the Depth of Carbonation<br />

Purpose<br />

To measure the depth of carbonisation in concrete in order to<br />

assess the risk of corrosion of tile rein<strong>for</strong>cement or to discover the<br />

cause of the damage.<br />

Carbonisation wi ll 1ead to corrosion of the rein<strong>for</strong>cement once the<br />

carbonisation has reached the actual re in<strong>for</strong>cement elements.<br />

Carbonisation in concrete progresses most quickl y in a dry climate<br />

(inland areas) and/or in areas subject to road traffic or ind ustri al<br />

pollution.<br />

Figure 7.3-3: Carbonised COllcrete<br />

Carboni sation is nol usually a problem in good qua lity concrete<br />

and when the cover is described as being 30 mm or morc and has<br />

been so applied.<br />

Procedures<br />

Reference is made to the NOf\vegian Public Roads Administration<br />

<strong>Handbook</strong> No. 0 15: "On Site Testing", Method No. 15.554.<br />

scope<br />

General<br />

Measuring the depth o f carboni sat ion can be necessary in the fo l­<br />

lowing cases:<br />

* <strong>Bridge</strong>s built during or immedi ately after the Second World War<br />

* Older girder bridges ut ili sing unstressed rein<strong>for</strong>cement and clo<br />

sely spaced rein<strong>for</strong>cement guides on the underside of the beams;<br />

these may also have been cast in concrete without stone ele<br />

ments.<br />

* Sections with little cover (I 0-30 mm)<br />

* Sections showing clearly corroded rein<strong>for</strong>cement<br />

* Sections containing porous or bad quality cement<br />

* When cutting out pieces of concrete or making chl oride profil es<br />

Acceptance Inspection<br />

Measuring the depth of carbonisation is not necessary in this case.


Major <strong>Inspections</strong><br />

Whenever carbonisati on is suspected as a problem, spot tests<br />

should be undertaken over a sufficientl y large area so as to be abl e<br />

to conclude whether carbonisation is/is not a problem <strong>for</strong> the bridge<br />

in question. Should these suspicions be confirmed then the<br />

scope of the testing can be en larged. In add ition measurements<br />

should be taken of the cover (compare Chapter 7.3.1 <strong>for</strong> the recor·<br />

ding of the extent of the earbonisation). As an alternative a special<br />

inspection can be requisitioned.<br />

Special <strong>Inspections</strong><br />

The depth of the carbon isation is to be measured in accordance<br />

with special instructions. The extent and location should be adap·<br />

ted to during execution of the inspection.<br />

Advantages and<br />

Disadvantages<br />

Eq uipment<br />

The method is quite simple but req uires cutting or dri ll ing of the<br />

structure.<br />

• A I % solution of phenolphthalein, or possibly I gm. phenol ph<br />

tha lein in all. mixture of water (50%) and ethanol (50%).<br />

• Spray bottle<br />

• Fold ing n ile<br />

• Slidingcall iper<br />

• Hammer<br />

• Chi se l<br />

• Pure water<br />

• Material and equipment <strong>for</strong> refi lling holes<br />

• Core drilling equipment, ifnecessary<br />

7.3.3 Measuring Chloride Content<br />

Pu rpose<br />

To measure the chloride content of hardened concrete at various<br />

depths so as to evaluate the risk of corrosion of the rein<strong>for</strong>cement<br />

or 10 uncover the cause of damage.<br />

The penetration of chloride wil l cause corrosion of the re in<strong>for</strong>cement<br />

in the event of the chloride concentration becoming too hi gh.<br />

The limit <strong>for</strong> critical chloride content, namely a level wh ich can<br />

lead to corrosion of the rein<strong>for</strong>cement, was earl ier assumed to be<br />

around 0.06% of the weight of the concrete (0.4% of the weight of<br />

the cement). However, ex perience gained fro m the bridges mana·<br />

ged by the Public Roads Admini stration indicates that the chloride<br />

content can be much higher without the occurrence of damaging<br />

corrosion of the rein<strong>for</strong>cement.<br />

The following circumstances are of significance <strong>for</strong> the speed of<br />

corrosion and must be considered in conj unction with the recorded<br />

chl oride content:


* The density of the concrete in relationship to the transfer of oxy<br />

gen (quality of the concrete, thickness of the cover).<br />

* The electrochemical properties of the concrete (variation in its<br />

qual ity, high mo isture content, possible presence of macro<br />

cells).<br />

Chl oride can penetrate concrete via three different sources:<br />

* Embedded chloride<br />

* Defrosting sa lt<br />

* Mari ne climate<br />

Embedded Chloride<br />

This can be found in older bridges due to the lise of sea water<br />

during construction, or aggregate or setting agent containing chloride.<br />

The use of sea water and aggregate dredged from the sea<br />

were previously acceptable and can still be found in several older<br />

coastal bridges.<br />

Calcium chloride (CaCI) is used as a setting agent especially by<br />

the concrete casting industry to allow casts to be speedily released<br />

<strong>for</strong> reuse. Elements so cast can be found, <strong>for</strong> example, on the<br />

underside of bridge decks supported on steel plates where the brid·<br />

ge deck is partially prefabricated.<br />

Embedded chloride produces a flat chloride profile deep within<br />

concrete. The chloride profile can be overlaid by chloride which<br />

has penetrated from outside the concrete. A further effect of carbo·<br />

ni sation wi ll be a reduction in the concrete's ability to bind the<br />

chlorides. Consequently the chloride profi le achieves a low value<br />

in carbonised concrete or in crushed stone with a hi gher concentra·<br />

tion at the leading edge of the carbonisation process be<strong>for</strong>e the<br />

concentration flattens out to the embedded level. (Refer to Figure<br />

7.3-4)


Carbonation Depth<br />

OL-________ L-~~------------~<br />

o<br />

Depth<br />

'Figure 7.3-4:Chloride Pl'Oji/c.embeddefJ chlol'ide ill C(ll'bollisetl COl/crete<br />

Defrosting salt<br />

Chloride resulting from defrosting salt or sand mixed w ith salt is<br />

able to penetrate the bridge deck fro m the topside if tl1-e bridge has<br />

not been equipped with a damp course. The fo llowing ca n be considered<br />

as vulnerable areas:<br />

* Edge girders and the underside of bridge decks along a bridge's<br />

edges<br />

* Joint constructions<br />

* Pillars supporting approach sections to a bridge<br />

* Abutment piers and cul vert walls situated 0 - 2 m. from a bridge<br />

* Localised areas under water outl ets and otherwise in depressi<br />

ons where waler is stagnant .<br />

Marine Climates<br />

Vu lnerable sections of coastal concrete bridges are described in<br />

Chapter 7.3.9.<br />

Procedures<br />

Reference is made to the Norwegian Public Roads Administration<br />

<strong>Handbook</strong> No. 0 14: " Laboratory Testing" and No. 015: "On Site<br />

Testing".<br />

The diffe rences in depth of the measurements and the intervals<br />

between test sites in a profile must be estimated in light of the<br />

positioning of the rein<strong>for</strong>cement and the objective oft he test. In<br />

some cases the intelVals detai led in Procedura l Codc-2 can appear<br />

to be a little rough. The alternative depth intervals <strong>for</strong> 30 mm. and<br />

50 mm. respectively <strong>for</strong> a pl anned cover could <strong>for</strong> example be:<br />

30 mm planned cover:<br />

50 mm planned cover:<br />

2-10 mm ., 10-20 mm. , 20-30 mm., 30-45 mm., 45-70 mm.<br />

2-15 mm., IS-3D mm., 30-50 mm., 50-75 mm. , 75- 100 mm.


Any dust should be extracted using an 18 mm. dri ll from four test<br />

hol es per test. The holes should <strong>for</strong>m the corners of a 5X5 em .<br />

Square.<br />

Methods<br />

Figure 7.3-5. Drilling 0111 Cemelll<br />

Dlis/<br />

Equipment<br />

Figure 7.3-6: RCT Allalysis Case<br />

Scope<br />

The choice of method of analysing concrete dust - on site or in a<br />

laboratory - depends fi rst and <strong>for</strong>emost on how much accuracy is<br />

required and on the costs.<br />

On Site Methods<br />

The most common methods are RCT (Rapid Chloride Test) and<br />

Quantab. Reference is made to the National Public Roads<br />

Administration <strong>Handbook</strong> No. 015: "On Site Testing", Methods<br />

15.552 and 15.553. These methods are less precise than those used<br />

in a laboratory, but in most cases they will be sufficiently accurate<br />

provided they are checked aga inst reference dust or laboratol)'<br />

methods.<br />

* Equipment fo r test extrac tions (hammer effect drill)<br />

* Plastic bags fo r collecting the dust in<br />

* Felt-tip pens <strong>for</strong> marking the tests<br />

* Material and eq uipment <strong>for</strong> refi lling the holes<br />

* Equipment <strong>for</strong> analysis purposes (on site kit)<br />

* Scales with an accuracy of III 0 grams<br />

* Dust <strong>for</strong> reference purposes<br />

Laboratory Methods<br />

The most common laboratory methods are potentiometric titration<br />

and Vo lhardt's Method. Laboratory methods must be used whenever<br />

the results of the analyses have to be very precise.<br />

The analysis methods are described in the National Pub lic Roads<br />

Administration <strong>Handbook</strong> No. 014: "Laboratory Testing", whil st<br />

Volhardt's Method is described in NS 3671.<br />

Acceptance Inspection<br />

So far as large new coastal bridges are concerned routines require<br />

to be established in connection with taking chloride measurements<br />

from selected construction elements. Any incursions of chl oride<br />

should be followed up with repeated measurements during future<br />

main inspections.<br />

Otherwise, measurements of the chl oride content are not taken<br />

during completion inspections.<br />

Major <strong>Inspections</strong><br />

If embedded chloride is suspected, <strong>for</strong> example, because of the<br />

visible results of corrosion, peeling and corroded rein<strong>for</strong>cement on<br />

the surface concrete, measurements should be taken of the chloride<br />

content.


For roads subject to salti ng spot checks of the chloride content<br />

should be taken in exposed areas such as pi llars supporting the<br />

approach sections to a bridge and the edge girders of bridges along<br />

the route. This is most va lid <strong>for</strong> bridges constructed according to<br />

older regulations, namely be<strong>for</strong>e 1996/97.<br />

Repeated chloride content measurements ought to be taken during<br />

each main inspection at approximately the same locations as a fol ­<br />

low-up over time. Measures can accordingly be taken timeously<br />

should the need arise.<br />

For new large coastal bridges inspection routines should be fo llowed<br />

or establi shed if necessary.<br />

Spot tests should be carried out on older bridges which have not<br />

previously been chec ked <strong>for</strong> chloride incursion. The need <strong>for</strong> a<br />

special inspection incorporating more extensive materials tests<br />

should be assessed.<br />

Measurements of the covering and the depth of any carbonisation<br />

should be undertaken at the sa me time as any dri lling <strong>for</strong> dust in<br />

connection with chloride tests. Alternatively a special inspection<br />

can be carri ed out including comprehensive materials testing and,<br />

if necessary, EC P measurements.<br />

Special <strong>Inspections</strong><br />

Chloride measurements are carri ed out according to special prescriptions.<br />

Their extent and location should be taken into during<br />

execution of the test.<br />

Ad vantages and<br />

Disadvantages<br />

On site testing is cheap and easy to carry Oul but are less accurate<br />

than laboratory methods. Analyses conducted in a laboratory are<br />

time-consuming and costly but result in a high level of accurac<br />

7.3.4 Corrosion Testing (ECP)<br />

To measure the rein<strong>for</strong>cement's electrochemical potential (ECP)<br />

and associated resistance in order to assess the probability of the<br />

rein<strong>for</strong>cement co rroding.<br />

Procedures<br />

Reference is made to the National Publ ic Roads Administration<br />

<strong>Handbook</strong> No. 0 15: "On Site Testing", Method NO. 15.552 and the<br />

National Pub lic Roads Administration, <strong>Bridge</strong> Division's Report<br />

No. 94- 16 <strong>Bridge</strong>s:<br />

"Recommendations <strong>for</strong> the Equipment <strong>for</strong> Measuring<br />

Electrochemical Potential (ECP)".<br />

General<br />

Scope<br />

ECP measurements should be taken if latent rein <strong>for</strong>cement corrosion<br />

is suspected.


Completion Surveys & Major <strong>Inspections</strong><br />

ECP measurements are not normally taken in these instances. The<br />

need <strong>for</strong> such tests during a main inspection will be init iallyassessed<br />

on the basis of visual observati ons and the resul ts of the tests<br />

both of the depth of carbonisation and the chloride c ontent.<br />

Special <strong>Inspections</strong><br />

EC P measurements should be conducted as per special instructions<br />

and should be verified by cutti ng into the concrete. Refer to<br />

Chapter 7.3.8. The chloride content, depth of carbonising and<br />

cover should all be measured at the place where the concrete is cut<br />

inlo.<br />

Advantages and<br />

Disadvantages<br />

•<br />

FigWl? 7.3-7: Takil/g ECP<br />

AI eusu rem e illS<br />

Equipment<br />

Figure 7.3-8: Drillil/g Ollt (I<br />

Concrete Core<br />

Methods<br />

This method is easy to use, non-destructive and rel"tively quick<br />

with the resu lt that large secti ons can be checked. It can provide a<br />

satisfactory picture of the cond ition of the rein<strong>for</strong>ce ment at any<br />

given moment. The risk of corrosion can be detectetd during an<br />

earl ier phase be<strong>for</strong>e visible damage becomes obvious. People possessing<br />

professional competence should be used both <strong>for</strong> site work<br />

and the interpretation of the results. The method does not record<br />

the speed of the corrosion process.<br />

ECP Equipment:<br />

• Metering electrodes<br />

• Voltmeter<br />

• Cables<br />

• Data recorder<br />

Other:<br />

• Spray bottle <strong>for</strong> moistening concrete<br />

• Device <strong>for</strong> measuring the cover<br />

• Clips <strong>for</strong> mak ing contact wilh the rein<strong>for</strong>cement<br />

• Chalk<br />

• Wire brush<br />

7.3.5 Determining the level of Strength<br />

To detennine the compressive strength of hardened concrete<br />

should, <strong>for</strong> example, below standard concrete be suspected.<br />

Compressive strength can be determined by, amongst other things:<br />

• Pressure testing of concrete cores dri lled out<br />

• Jackhammer<br />

Pressure testing of concrete cores drilled 0 ut<br />

Procedures<br />

Advantages and<br />

Di sadvantages<br />

Reference is made to the Norwegian Public Roads Admini stration<br />

<strong>Handbook</strong> No. 015: "On Site Testing" <strong>for</strong> the drilliog Oul of concrete<br />

cores, and to the Nat ional Public Roads Administration<br />

<strong>Handbook</strong> No. 014: " Laboratory Test ing" fo r pressure testing the<br />

concrete cores.<br />

This methods produces precise pressure test val ues <strong>for</strong> the cores in<br />

question, but does req uire expensive equipment and is to be consi-


dered time consuming. This is a destructive method; one has to<br />

take care du ring the dri ll ing process so as to avoid damaging the<br />

rein<strong>for</strong>cement. Core dril ling in pre-stressed concrete bridge elements<br />

should be carried out only in special situations.<br />

Equipment<br />

* Core drilling equipment<br />

* Materials and equipment fo r refilling the hol es<br />

* Pressure testing device<br />

Rebound Hammer<br />

Procedures<br />

Reference is made to the Norwegian Public Roads Administration<br />

<strong>Handbook</strong> No. 0 15: "On Site Testing", Method No. 15.544.<br />

Figure 7,3-9: Measurillg the<br />

Compressive Strength o/ Col/crete<br />

!lsillg a Rebowui flammer<br />

Equipment<br />

This is an extremely speedy, simple and cheap method. However,<br />

the test results are very inaccurate because of a great deal ofuncertainty<br />

about them. Nevertheless the results can be used to obtain a<br />

picture of how the compressive strength can vary in different ele-.<br />

ments. Values can be obtained only <strong>for</strong> a concrete surface.<br />

* Schmidt hammer or pendulum hammer<br />

General<br />

Scope<br />

The strength level of concrete is rarely lower than that used as a<br />

basis at the design stage. Generally speaking the need <strong>for</strong> compressive<br />

strength testi ng does not arise during routine inspections.<br />

Acceptance <strong>Inspections</strong> and Major <strong>Inspections</strong><br />

Determining compressive strength is not usual ly carried out.<br />

Special <strong>Inspections</strong><br />

Determining compressive strength may be necessary should the<br />

load bearing capacity be too low, and verification of the actual<br />

strength can benefit the calculati ons.<br />

Purpose<br />

Procedures<br />

7.3.6 Structural Analysis<br />

To determine the structure of the concrete by analysi ng the results<br />

of Plane Ractify ing and/or of Thin Section Method to discover<br />

amongst other things the reason <strong>for</strong> any damage, e.g. alka li reactive<br />

aggregate.<br />

Concrete structures will be analysed using surface gri nding or fine<br />

grinding depending on the purpose of the analysis. Both types of<br />

anal ysis are carried out in a laboratory on drilled out cores.<br />

Plane Ractifying<br />

A concrete core is sawn along its central axis, burnished and surface<br />

treated. Surface grinding providcs the following in<strong>for</strong>mation:<br />

* The \VIc ratio


• Homogeneity of the binding agent<br />

* Distribu tion of the aggregate (quality)<br />

• Air content Idi stance between air bobbles? (durabil ity aga inst<br />

frost)<br />

• Cracking<br />

Thin Section Analysis<br />

A piece of fin e ground concrete nonnally measures 40 x 45 mm.<br />

and is ground down to a th ickness of20-25 my. Apart from that<br />

obtained from surface grinding, fin e grinding provides the fo llowing<br />

addit ional in<strong>for</strong>mation:<br />

• Carbonisation<br />

• Leve l of hydration (q ualitative)<br />

* Type of aggregate<br />

• Chemical reactions such as reaction to alkali<br />

Scope<br />

Acceptance <strong>Inspections</strong> and Major <strong>Inspections</strong><br />

Structural analyses sha ll not be carried.<br />

Speciallnpections<br />

Structural analyses are carried out only when required, e.g. suspected<br />

reaction to alkali.<br />

Advantages and<br />

Disadvantages<br />

Plane Ract ifying and th in section analysis are both good methods<br />

<strong>for</strong> detennining concrete qua lity but are destructive, costly and<br />

time consuming. They should only be considered if the possible<br />

damage and its causes cannot be detennined using any other method<br />

or when it is important to know the composition of the concrete.<br />

Since only a small part of a structure is examined, it is vital that<br />

representative dri ll ed cores are removed <strong>for</strong> analysis and that<br />

wide-ranging conclusions arc not drawn from the analysis resu lts.<br />

Figure 7.3-10: Analysis IIsing Thin Sec/ioll Me/hod<br />

Equipment<br />

• Core drilling equipment<br />

• Laboratory analysis equipment


Purpose<br />

Procedures<br />

7.3.7 Inspection of Prestressed Tendons<br />

To conduct an inspection of the condition of pre-tensioned and<br />

post-tensioned cabl es anchored in concrete. Checking pre-tensioned<br />

cables may be worthwhile if defective injection is suspected,<br />

as this can have very serious consequences <strong>for</strong> the bridge's load<br />

bearing capacity.<br />

Checking post-tensioned cables is difficu lt and should only be carried<br />

out by a specialist company using special equipment, and then<br />

only after consulting the bridge's designers.<br />

Ultrasound, X-rays or a fibre optic endoscope can be used to locate<br />

damage. The use of a fibre optic endoscope requires holes to be<br />

drilled in the cable tubes. One should, there<strong>for</strong>e, have a clear<br />

understanding of where the cavities and the damage arc located, as<br />

drilling incorrectly and damaging a tension cabl e can have serious<br />

consequences.<br />

Scope<br />

Acceptance <strong>Inspections</strong> and Major <strong>Inspections</strong><br />

Tension cables are not normally checked.<br />

Special <strong>Inspections</strong><br />

A tension cable check wi ll be undertaken as required, fo r example<br />

when badly executed injection of the cable tubes is suspected.<br />

Fig1lrc 7.3-/1<br />

Fib.·c Optic Testiflg<br />

of a Tel/siollcd Cable<br />

Advantages and<br />

Disadvantages<br />

Equipment<br />

Purpose<br />

A good overview can be obtained of the conditions inside a cable<br />

tube, but the method is destructive and it is all too easy to hit the<br />

cable tube or the cavit ies. In addition there is a risk of damaging<br />

the cable itself.<br />

To be decided <strong>for</strong> each specific occasion.<br />

7.3.8 Cutting open the Concrete to Assess the<br />

Corrosion level<br />

To carry out a visual check of the level of corrosion in the rein<strong>for</strong>cement<br />

and to record the type of rein<strong>for</strong>cement and its diameter.<br />

Additional ly, the cover should be measured.


Procedures<br />

In most cases it is sufficient <strong>for</strong> the width of the area to be cut to<br />

match the dimensions of the re in<strong>for</strong>cement and the cover sllch that<br />

the minimum width equals the cover plus the diameter of the rein<strong>for</strong>cement<br />

(0 + d). Refer to Figure 7.3- 12. Approximately 1/3 to Y2<br />

of the rein<strong>for</strong>cement element's circumference s hou~d be bared <strong>for</strong><br />

atleasl 0.3 cm.<br />

.r<br />

minimum<br />

O+d<br />

.r<br />

.-<br />

:T-<br />

O<br />

:Ty<br />

d r<br />

Figllre 7.3-/2: Recommended Breadll! & Deplh oflhe CIIII/llc ision<br />

The degree of rusting in the rein<strong>for</strong>cement wi ll be assessed usi ng<br />

the fo llowing scale:<br />

Level A: No damage. Dull grey coating on the rein <strong>for</strong>cement ele<br />

ment.<br />

Level B: The first small traces ofrus! can be seen. Assess whether<br />

these date from the bridge's construction period.<br />

Level C: Even distribution of surface rust.<br />

Level D: Severely peeling surface rust as we ll as clear cross-secti<br />

onal reduction in size.<br />

Level E: Corrosive pi tting.<br />

The degrees of rust ing are illustrated in Figures 7.3-13 to 7.3-17.<br />

Figllre 7.3-/3: Example ofRusl Level A


Figl/Ye 7.3-14: Example 0/ Rilsi lel'ef B<br />

Figllre 7.3-15: £wmp/e 0/ RIiSf Lel'ef C<br />

Figllre 7.3-16: bump/eo/Rllsf Lel,e/ D


Figure 7.3-17 E.wmpleQJRlIsl Level £<br />

Cutting open the concrete reveals the actual level of corrosion to<br />

the rein<strong>for</strong>cement and acts as a check <strong>for</strong> the resu lts of other materials<br />

testing. The method is destructive and ought only to be<br />

employed to a very limited ex tent. It shoul d be noted that the area<br />

to be cut open is not necessarily representative of an entire bridge.<br />

Acceptance <strong>Inspections</strong> & Major <strong>Inspections</strong><br />

Cutting open concrete fo r corrosion assessment purposes is not<br />

usually undertaken. However, it can be worthwhi le in the assessment<br />

of any cross-secti onal reduction in the rein<strong>for</strong>cement when<br />

there is visible evidence of corrosion.<br />

Special <strong>Inspections</strong><br />

tain ing latent corrosion. In these cases areas with cl ear evidence of<br />

corrosion should not be cut open.<br />

Should noth ing else specifica lly be mentioned, then cutting operations<br />

should be undertaken <strong>for</strong> consecutive areas measured <strong>for</strong><br />

potentiality <strong>for</strong> the following locations:<br />

* The lowest measure of potentiality<br />

* The middle measure of potentiality<br />

* The highest measure of potentiality<br />

When cutting into concrete to veri fy ECP measurements the fo llowing<br />

materials tests should be undertaken in the order given:<br />

I. ECP measurements (recording the potential and resistance<br />

levels)<br />

2. Measuring concrete cover<br />

3. Measurin g the ch loride content from layers adj usted <strong>for</strong> the<br />

cover measured such that the chloride level is measured in each<br />

or the layers.<br />

4. Cutting operati ons and evaluating the level o f rust and the<br />

reduct ion in the cross-section.<br />

5. Measuring the depth of ca rbonisation


6. Measuring the actual cover to check the cover meter<br />

7. Re-filling<br />

Cutting into concrete can also be carried out in connection with the<br />

assessment of the scope of corrosion to the rei n<strong>for</strong>cement elements.<br />

Barriers should also be cut open to assess the reduction in<br />

cross-sectional reduction of the rein<strong>for</strong>cement. Areas showing<br />

visible signs of surface corrosion of the concrete should be approached<br />

in a similar fashion. This is especiall y desirable <strong>for</strong><br />

barrierslthe results of corrosion which are found in areas prone to<br />

static strain.<br />

Equipment<br />

* Cutting equipment (chisel hammer)<br />

* Camera<br />

* Slidc callipcr<br />

* Magnifying glass<br />

* Wire brush<br />

* Materials and equipment <strong>for</strong> refilling holes<br />

7.3.9 Location of Materials Testing <strong>for</strong><br />

Concrete Coastal <strong>Bridge</strong>s<br />

Chloride Penetration<br />

It has become apparent that chloride penetration on exposed coastal<br />

bridges is characterised principal ly by three sets of circumstances:<br />

I. Height above Sea Level: Chloride penetration increases<br />

according to the he igh t of the superstructure above sea level ­<br />

refer to Figures 7.3- 18 and 7.3- 19. The same applies to co lumns<br />

(see Figure 7.3-20). However, in some instances the chloride<br />

contem has been shown to be lower further down the columns<br />

than nearer the top.<br />

2. The Windward/Leeward Effect: Chl oride penetration is mar<br />

kely greater on surfaces subject to wind and rainfa ll on the lee<br />

ward side. The effects can depend on their being/not being sub<br />

ject to rain and negative pressure on the leeward side resu lting<br />

in sea spray settling on the concrete surfaces - refer to Figures<br />

7.3-18and 7.3-19.<br />

Leeward facing surfaces are to be found on both the sub and superstructures.<br />

The following are some typ ical examples:<br />

* Vertical surfaces in the lee of wi nd and ra infall (columns, webs<br />

in box gi rders and beams.<br />

* Horizo ntal downward fac ing surfaces - the undemeath of top<br />

cross-beams, beams, top plates and wings, and base plates of<br />

box girder bridges.


"<br />

~<br />

~<br />

~<br />

•<br />

E<br />

E<br />

u<br />

B<br />

~<br />

~<br />

u<br />

'"<br />

~<br />

0<br />

•<br />

...<br />

0<br />

-.<br />

g~<br />

";: ...J<br />

<br />

"Qj ..8<br />

~ .<br />

~<br />

,.<br />

'"<br />

'.<br />

,. .'<br />

~<br />

... .. .. ,.. "<br />

-<br />

~<br />

~ 'OO<br />

;" . .<br />

.. -<br />

~\..-~,,'"'<br />

.'<br />

,<br />

,<br />

,<br />

, ..<br />

'"<br />

.. , . •<br />

CD ,<br />

BeJow Bo~ Girder<br />

."~ Wall<br />

..........<br />

Figure 7.3-18: Average Chloride Content in the Box Girders. Gimsoyslruwllen<br />

<strong>Bridge</strong>al a Depth 0[0- /0 mm.<br />

""""\<br />

=:c..::::::::c=<br />

-'---- --o:c;;::::::::=<br />

"~[ ~KS! ~ . 1'1.11'<br />

____ I.. South O))'lIO ~ ':;<br />

Dominant Wind<br />

DirectiOf1 during<br />

Precipitation 022'11. s'7 6<br />

--''---~-+<br />

North<br />

.-<br />

ktr116<br />

1<br />

::--:-_.".~ South 0119'1'­<br />

Dominant Wind<br />

Direction during<br />

Presipilalion<br />

North<br />

::--,.-,,,,,I~ South<br />

Dominant Wind<br />

Direction during<br />

Precipitation<br />

Ao(SE<br />

'] • 74m •<br />

"<br />

"<br />

'66%<br />

North<br />

Chloride conlent as % of cement weight <strong>for</strong> depths (}'1 0 mm<br />

Figure 7.3- 19: Varia/ioll a/Chloride Con/enl of Box Girders according to<br />

Height above Sell-fel'el.


t I e<br />

---::--._.- . -.<br />

._'_.. !<br />

Figure 7.1-10: V(lrimioll ill Chloride COl1lel1l OfCO/III11I1S accQrding 10 Height<br />

above Sea-/e~·e1-Gil/lsoystraulllen <strong>Bridge</strong><br />

3. Geometric Effects: Exposure is greater on large cross-sections<br />

and badly geometrically shaped cross-sections - see Figure 7.3-<br />

18.<br />

In addition, local circumstances can exist related to the terrain<br />

around the bridge or to the sea bed around the columns and which<br />

can also affect chloride impact (skerries and foundations produce a<br />

lot of spray).<br />

All of these factors produce simultaneous effects and a joint chloride<br />

impact pattern.<br />

The following contains a rough overview of those sub and superstructural<br />

surfaces most and least exposed to chlorides.<br />

Surfaces most exposed<br />

to Chloride Penetration<br />

Surfaces least exposed<br />

to Ch loride Penetration<br />

Substructure<br />

Large cross-sections of the leeward side of columns between 0 and<br />

20 metres above the surface oflhc water, e.g. the ma in columns of<br />

cantilever bridges; also the underneath of top cross-beams near the<br />

surface of the water.<br />

The windward sides of thin columns with a high elevation above<br />

sea-level.


Superstructure<br />

Surfaces most exposed<br />

t o Chloride Penetration<br />

Surfaces least exposed<br />

to Chloride Pene tratio n<br />

Chloride and Mo isture<br />

Combination of<br />

Materia ls Testing<br />

Leeward facing surfaces low down and near the water surface,<br />

especially large cross·sections, <strong>for</strong> example pil lars of Cantil ever<br />

<strong>Bridge</strong>s;also the underneath of bottom plates, cross girders and<br />

beams.<br />

The windward sides of sl im superstructures with a hi gh elevation<br />

above sea· level.<br />

Concrete surfaces containing a high level of chloride will retain<br />

moisture longer during the drying out process and will consequently<br />

be of a darker shade than surfaces with a low salt content.<br />

It is there<strong>for</strong>e possible in a damp coastal cl imate to see with the<br />

naked eye which surfaces have most been affected by chloride.<br />

Surfaces greatly subject to wind and rain (on the windward side)<br />

will gradually acquire a sandy appearance because the top surface<br />

layer of the concrete will have been washed away.<br />

When deciding the places to undertake materials testing one<br />

should make use of this knowledge of chloride instigated stress.<br />

It is important to carry out several kinds of materials testing, e.g.<br />

surface cover measurements, chloride analyses, ECP measurements,<br />

cutting open the concrete, in such a way that these can be<br />

compared wi th one another be<strong>for</strong>e the condition of the concrete is<br />

decided on. Materials testing should also be viewed in relationship<br />

to any visual inspections undertaken.<br />

in order 10 be able to compare the result's of materials testing such<br />

as surface cover and ECP measurements, measuring the chloride<br />

content and the depth of carbonisation, and cutting open the concrete,<br />

they must all be carried out at the same places. Refer to<br />

Chapter 8.5 <strong>for</strong> a presentation of materials testing <strong>for</strong> concrete.<br />

7.4 Adequate Materials<br />

Testing - Steel<br />

In the following section a description wi ll be given of the possible<br />

materials testing <strong>for</strong> use in inspections of bridge sib ridge elements<br />

made of steel.<br />

Purpose<br />

Procedures<br />

7.4.1 Checking the Torque of Screws<br />

To check the stud torque of screws in friction joints.<br />

Checking the torque of screws may be necessary in connection<br />

with acceptance inspections if this has not already been carried out<br />

during the construction phase. Reference is made to the National<br />

Public Roads Admini stration Manual No. ISO: '<strong>Bridge</strong>s - Safety<br />

and Technical Standards', Point NO.7.


This check may also prove necessary during Special <strong>Inspections</strong><br />

should there be any suspicion of screws having lost theirorigina l<br />

tension.<br />

Equipment<br />

• Torque wrench<br />

Purpose<br />

Procedures<br />

Equipment<br />

7.4.2 Checking Rivets and Screws<br />

To check whether rivets and/or screws are loose or have possibly<br />

dropped out of place.<br />

Loose screws or ri vets can cause cracks to appear in the surface<br />

treatment at the cross-over point between screw/rivet head and the<br />

basic material. By lightl y tapping on one side oflherivet wi th a<br />

hammer whi le placing one's finger on the opposite side of the ri vet<br />

at the cross-over point one can feel whether the ri vet is loose.<br />

• Magnifying glass<br />

• Torch<br />

• Hammer<br />

Figure 7.4-/: Checking a RiI'el<br />

Equipment<br />

Purpose<br />

Procedures<br />

Equi pment/Competence<br />

7.4.3 Checking Welds<br />

To carry out visual check <strong>for</strong> fau lts in the welding or whether<br />

damage has been caused to the welding.<br />

If material defects are suspected, X-ray or ultrasound checks<br />

should be carried out in addition - see points 7.4.4 and 7.4.5.<br />

• Magni fy ingglass<br />

• Torch<br />

• Tool <strong>for</strong> measuring the width of cracks<br />

7.4.4 X-ray Check<br />

To carry out X-ray inspections of welds and other steel elements to<br />

check <strong>for</strong> material defects.<br />

The X-ray fi lm should be used to document the results.<br />

The inspection should be undertaken by a pe rson with the relevant<br />

training and the necessary speciali st equipment.<br />

Purpose<br />

Procedures<br />

7.4.5 Ultrasound Check<br />

To ascertain with the use of ultrasound equipment whether there<br />

are material defects in welds, or cracks in screws or ri vets.<br />

Reference is made to Procedure No. 87. 1835<br />

The measurements should be taken using a test sensor whi ch transmits<br />

and receives ultrasound waves which actually work on a frequency<br />

beyond the that of human hearing (approx. 16,000 Hz).


The sound waves can be transmitted into solid materials, but not<br />

air. The test sensor should be placed on the surface; the sound<br />

waves are then bounced off the reverse surface oflhe test area.<br />

The results are recorded via an oscilloscope, and their interpretation<br />

places great demands on the operator. This person should possess<br />

the necessary qualifications and ex perience <strong>for</strong> recording and<br />

interpreting the results.<br />

X-ray and ultrasound tests complement each other. Ultrasound testing<br />

is the preferred method <strong>for</strong> checking <strong>for</strong> faults in bonding<br />

materials and certain types of cracks.<br />

Eq u i p me ntl Com pete nce<br />

Purpose<br />

Procedures<br />

Purpose<br />

Procedures<br />

E qu i p mentl Com petence<br />

These checks should be carried out by companies with properly<br />

trained personnel and special equipment.<br />

7.4.6 Magnetic Powder Check<br />

To check <strong>for</strong> the presence of cracks in the steel which are not<br />

visibl e to the naked eye.<br />

The extent of the cracks should be documented by means of drawings<br />

or photographs. Both cracks all the way through the steel<br />

and on the surface are to be drawn as a record. This type of test<br />

does not provide any measurements of the depth of the cracks.<br />

These checks should be carried out by companies with properly<br />

trained personnel and special equipment.<br />

7.4.7 Fi bre Optics<br />

To check <strong>for</strong> the presence of damage, e.g. corrosion or cracks, in<br />

enclosed or not easily accessible steel elements with the use of a<br />

fibre-optic equipped endoscope.<br />

These checks should be carried out by companies with properly<br />

trained personnel and special equipment .<br />

Purpose<br />

Procedures<br />

Eq u i p m e ntl Com pete nce<br />

7.4.8 Ultrasound Measurement of Material<br />

Thickness<br />

To measure the thickness of steel parts when directl y taken measurements<br />

are not possible, <strong>for</strong> example when only one of the steel<br />

surfaces is accessible. This may be the case with corrugated steel<br />

pipes and piles.<br />

Reference is made to Procedure 87.1838 and Chapter 7 A.5. The<br />

possibl e results of corrosion on the reverse surface do not reflect<br />

ultrasound impulses. The effecti ve thickness wi ll there<strong>for</strong>e be<br />

measured.<br />

These checks should be carried out by companies with properly<br />

trained personnel and special equipment.


7.5 Adequate Materials<br />

Investigation - Timber<br />

This chapter contains in <strong>for</strong>mation about materials investigations<br />

which can be recommended <strong>for</strong> Ihe inspection of timb er bridges<br />

and bridge elements.<br />

Figure 7. 5-/: Measurillg Mois/ure<br />

Le l'e/s in Wood<br />

Purpose<br />

7.5.1 Investigation of the Humidity Level of<br />

Timber<br />

To measure the moisture content of timber elements. The moisture<br />

level recorded wi ll reveal, amongst other things, whether there is a<br />

danger of the existence of dry rot fun gus. This test will, however,<br />

be of usc only in special cases and only <strong>for</strong> load-bearing clements<br />

since an already high moisture level must be taken into account in<br />

limber bridges .<br />

• Electric moisture meter<br />

• Measurement electrodes<br />

Purpose<br />

7.5.2 Checking <strong>for</strong> Fungus and Rot - Timber<br />

To carry out analyses of timber in order 10 ascertain the type of<br />

fun gus wh ich has ca used the rot damage. These are worth consideri<br />

ng when the test area is large and any possible replacement of<br />

sections could have serious consequences.<br />

Procedures<br />

Equ ipment/Com petence<br />

Samples should be taken of any fungus visible and these are to be<br />

sent 10 a laboratory which conducts tests on fung i.<br />

A pi ece of wood core can also be extracted using a drill to obtain a<br />

picture of the timber's cross-section. The core removed should be<br />

of the smallest possible diameter so as to avoid weakelling the<br />

cross-section. The hole should be re-fi lled.<br />

Samples should be removed with a knife or other equipment <strong>for</strong><br />

drill ing out core sections. The analyses should be conducted by a<br />

specially equipped laboratory with com petent personnel.<br />

7.6 Adequate Materials<br />

Investigation - Stone<br />

In the fo llowing secti on a description is provided ofth e materials<br />

testing which can be used during inspections of stone bridges and<br />

bridge clements.<br />

Purpose<br />

7.6.1 Compressive Strength <strong>for</strong> Stone<br />

To ascertain the compressive strength of stone by press ure testing.<br />

This may be necessary when checking the load bearing capacity of<br />

slone bridges.


Procedures<br />

The compress ive strength of stone is ascertained by removing<br />

stone cores and subjecting these to pressure testi ng. Only stone<br />

which is representative and free from cracks and scratches should<br />

be used in core sampling. This method can also be em ployed to<br />

determine the modulus of elasticity of the stone.<br />

These tests should be carried out by suitably qualified people<br />

using specialist equipment and can be used during Special<br />

inspections.<br />

Equ ipme nt<br />

'" Core drilling equipment<br />

'" Pressure testing machine<br />

7.7 Adequate Checking of the<br />

Surface Treatment<br />

What fo llows is a description of the tests which can be carried out<br />

when inspecting the surface coating of concrete, steel or timber.<br />

These tests should primari ly used during Acceptance <strong>Inspections</strong><br />

in the absence of any records indi cating they have al ready been<br />

conducted. Moreover, they should be executed during Special<br />

<strong>Inspections</strong>.<br />

A licensed Inspector should preferably be employed <strong>for</strong> special<br />

checks of the surface coating of steel, especially when extensive<br />

maintenance work is under consideration.<br />

Purpose<br />

Procedures<br />

Equipment<br />

7.7.1 Thickness of Surface Coating -Concrete<br />

To check that the thickness of the surface coating of the concrete is<br />

as prev iously described.<br />

The test can be conducted on already cut out sections whose thickness<br />

can be directly measured by use of, <strong>for</strong> example, an instrument<br />

ror measuring the width of cracks or a magni fying glass.<br />

Alternatively <strong>for</strong> concrete a sli ver of tile surface coating can be<br />

tested <strong>for</strong> thickness.<br />

'" Core drill ing equipment<br />

'" Measuring Gauge or a Magnify ing Glass<br />

Purpose<br />

7.7.2 Adhesive Bonding between Surface<br />

Coating and Concrete<br />

To measure the surface coating's bonding to the concrete using a<br />

stripping instrument.<br />

Reference is made to the Norwegian Public Roads Administration<br />

Manual No. 0 15: 'On Site Testing' ~ Method No. 15.541 .


Procedures<br />

Equipment<br />

Surface sections subjected to stripping shoul d be treated with a<br />

new coating.<br />

Equipment:<br />

'" Stripping equipment<br />

'" Sa mpl e bea kers<br />

'" Core drill<br />

'" Quick-sett ing gl ue<br />

'" Wire brush or ordinary brush<br />

Figure 7.7-1: Strippil1g Il1sll"IImellt<br />

Purpose<br />

Procedures<br />

Equipme nt<br />

7.7.3 Depth of Penetration of Water Repellent<br />

Impregnation<br />

To measure the depth of the penetration of water repeDent impregnation<br />

in concrete.<br />

The depth of penetration is measured by cutting out sa mple cores<br />

of a minimum diameter or60 mm, cutting them open, drying them<br />

at a temperature of 50 0 - 60 0 C and using water as an indicator. A<br />

test consists o f 3 cores, and the penetration depth is recorded <strong>for</strong><br />

each of the 6 half cores using a magnifying glass <strong>for</strong> cracks.<br />

'" Core drill<br />

'" Measuring Gauge<br />

Purpose<br />

Procedures<br />

Equipme nt<br />

7.7.4 Thickness of Surface Coating of Steel<br />

To chec k that the thi ckness of the dri ed coating of paint or surface<br />

coating of steel is as previously described.<br />

Reference is made to the Norwegian Public Roads Admin istration<br />

Report No. 94-08 (<strong>Bridge</strong>s): ' Maintenance of Anti-Co rrosion<br />

Coatings <strong>for</strong> <strong>Bridge</strong>s'<br />

For Acceptance <strong>Inspections</strong> testing the thickness orthe surface<br />

coating should be carried out in accordance with the Norwegian<br />

Public Roads Administration Manual No. 150: ' <strong>Bridge</strong>s - Safe ty<br />

and Techni cal Standards', Point NO.7 if this has not been done<br />

during the construction phase. Moreover, thi s test is suited to<br />

Special In spec tions.<br />

'" Electromagneti c thickness gauge<br />

'" Feeler gauge <strong>for</strong> ca libration purposes


Figllre 7.7-2: Thicklless ofSllrface Coalingo/Sleel<br />

7.7.5 Adhesive Bonding between Surface<br />

Coating and Steel<br />

Purpose<br />

Procedures<br />

Equipment<br />

To measure the surface coating's adhesive bonding to the steel<br />

using a stripping instrument.<br />

For Acceptance <strong>Inspections</strong> measuring the surface coating's adhesive<br />

bonding should be carried out in accordance with the<br />

Norwegian Public Roads Administration Manual No. 150:<br />

' <strong>Bridge</strong>s - Safety and Technical Standards', Point No.7 if thi s has<br />

not been done during the construction phase. Moreover, this test is<br />

su ited to Special <strong>Inspections</strong>.<br />

The method is destructive and should not be used unnecessarily.<br />

Surface sections subjected to stripping should be treated with a<br />

new coating.<br />

'" Stripping instrument<br />

'" Round sheets of aluminium<br />

'" Magnet<br />

'" Quick-setting glue<br />

'" Sand paper<br />

'" Knife or simi lar 1001<br />

7.7.6 Other Checks - Surface Coating of Steel<br />

In addition to a visual check of the old surface coating <strong>for</strong> damage,<br />

the following checks may be worthwh il e in connection with<br />

Special <strong>Inspections</strong> be<strong>for</strong>e undertaking painting as part of the<br />

maintenance programme:<br />

Sectional Measurements<br />

lattice Section<br />

The thickness of the each layer of paint is measured as well as the<br />

number of coats and the th ickness of each coat (this presupposes<br />

the use of a different colour <strong>for</strong> each layer).<br />

This provides a measurement of the adhesive bonding to the bottom<br />

surface. This technique cannot be used on thermally applied<br />

coatings


Ability to Accept New<br />

Layers of Pa int<br />

Ana lysis o f o ld Pa int<br />

This should be checked with regard to old surface coatings and to<br />

the adhesive bond ing between old and new surface coatings.<br />

It can be advisable to anal yse samples of the old surface coatin g to<br />

ascertain its composition with some certainty.<br />

7.8 Readings from<br />

Instruments<br />

Instruments can be mounted on a bridge to follow the development<br />

ofa situation over a peri od of time. This will act as a suppl ement<br />

to visual checks, measurements and materials testi ng. In some<br />

instances instruments are installed to veri fy the stress levels 10<br />

which the bridge is subjected. The fo llowing are representati ve of<br />

the instruments which could be used:<br />

Instrume ntation<br />

* Reference electrodes<br />

* Equipment <strong>for</strong> measuri ng the speed of corrosion<br />

* Wind speed detector<br />

* Wave height detector<br />

* Resistant Wire Strain Gauge (on steel)<br />

* Vibrating Wire Strain Gauge (on concrete)<br />

The instruments can be read during main or special inspecti ons or<br />

separately if desired.


8 Reporting<br />

the Results of<br />

<strong>Inspections</strong><br />

8.1 Acceptance <strong>Inspections</strong> -<br />

Warranty <strong>Inspections</strong><br />

Acceptance <strong>Inspections</strong> and Warranty <strong>Inspections</strong> should preferably<br />

be printed on <strong>Bridge</strong> Management Systems inspection <strong>for</strong>ms,<br />

since these have been designed to suit each individual bridge<br />

depending on the data in the BMS module <strong>for</strong> the structure.<br />

Irthe data <strong>for</strong> some bridges have not been recorded in the BMS,<br />

indi vidual reports require to be drawn lip, the contents of which<br />

can have the fo llowing stmcture:<br />

1. Summary containing an overview of any damage, faults or<br />

defects to be repaired.<br />

2. Description of the bridge and the system afloealing damage.<br />

3. Results of visual inspections.<br />

4. Results of the measurements and material testing.<br />

5. Assessment of the recorded damage, faults or defects. Indicate<br />

which of these require repair and whether some of them may be<br />

possible sources of future destructi ve developments.<br />

8.2 Routine <strong>Inspections</strong><br />

The reports <strong>for</strong> all Routine <strong>Inspections</strong> should be printed on the BMS<br />

inspections fonns which have been designed to suit each individual<br />

bridge and type of in spection.<br />

The inspection fonns should be taken to inspections and then completed<br />

on site. The fo llowing routines can be of assistance.<br />

General <strong>Inspections</strong> require points I to 6 and 12 to be carried out.<br />

I. The Inspector should check whether there are missing or incom<br />

plete data with reference to bridge category, its position, type of<br />

stmcture or the equipment required to gain access.<br />

2. The name (initials) of the Inspector together with the date of the<br />

inspection should be completed on the <strong>for</strong>m.<br />

3. The Inspector can record any general comments about the<br />

inspection.<br />

4. Experiences, events, specific damage or the such like can be<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 117


ecorded under their own points should they be considered<br />

important <strong>for</strong> others in the future.<br />

5, Only those elements wh ich wi ll be checked during the actual<br />

inspection are to be mentioned on the inspection fonn. Elements<br />

located above the water level wi ll not be included in inspection<br />

fonns used <strong>for</strong> Ma in <strong>Inspections</strong> Under Water. Should the<br />

bridge incorporate elements other than those ind icated, these<br />

can subsequently be added to the fonn. Any fau lts or defects<br />

should be commented on so that they can be rect ifi ed by the<br />

next inspection. One should check that the elements have been<br />

recorded as us ing the correct material, have been allocated the<br />

correct type description and, ifneed be, axes.<br />

6. All elements included in an inspecti on shall be checked <strong>for</strong> pos<br />

sible damage which should then be described <strong>for</strong> each element<br />

with the use of damage designations. In each instance the degree<br />

and the consequences of the damage is to be assessed. I freIe<br />

vant, the damage can be illustrated by taking a photograph.<br />

7. Ifpossible, provide the cause(s) of the damage.<br />

8. Proposed maintenance measures and when these will be carried<br />

out must be described <strong>for</strong> all damage of level m 2. Procedure<br />

Nos. 87 and 88 in Norwegian Public Roads Admini stration<br />

Manual No. 026: ' Procedural Code - 2. 1997' \ .... ill be of assitance<br />

in describing these measures.<br />

9. Esti mates should be drawn up <strong>for</strong> each proposed pi ece of main<br />

tenance based on the extent of the damage and the unit cost. The<br />

extent of the damage, i.e. size and quantity, should be noted on<br />

the fonn during the in spection.<br />

10 The results of any measurements and materials testing should<br />

be presented as indicated in Chapter 8.4 'Measurements' and<br />

Chapter 8.5 'Materials Testing'.<br />

II. A Special In spection (see Chapter 6.7) is to be recommended if<br />

Routine <strong>Inspections</strong> uncover a great need <strong>for</strong> repairs or are not<br />

sufficient fo r determining the kind of damage, its consquences,<br />

extent or cause(s). A note should be made of the measure<br />

menls/materials testing to be undertaken, the degree to which<br />

this should be done and the localion(s).<br />

12. The results of the inspection should be recorded in BRUTUS<br />

International at the conclusion of the inspection.<br />

13. Ifrequired the inspection and maintenance plans may be adjusted.<br />

118<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


After carrying out a major inspection of a larger bridge it could be<br />

advisable to produce an expanded report in which the inspection<br />

<strong>for</strong>m represents just one part of the report. It should contain a more<br />

detailed description of any damage, the operational and maintenance<br />

measures and an estimate of the costs. The report can build<br />

on the relevant points suggested <strong>for</strong> drafting reports of Special<br />

<strong>Inspections</strong> - see Chapter 8.3 'Special <strong>Inspections</strong> '.<br />

8.3 Special <strong>Inspections</strong><br />

As much as possible a Special Inspection should act as a good<br />

basis <strong>for</strong> choosing the correct maintenance strategy, describing the<br />

associated measures stating the scope, when they are to be carried<br />

out, and the costs.<br />

Thus it is important fo r the report to be given a struct ure and content<br />

which will <strong>for</strong>m an unequivocal basis fo r prioritising and<br />

assessing the suggested measures. The fo llowing sec tion there<strong>for</strong>e<br />

provides suggestions as to the contents of a Special Report. In<br />

each individual case an assessment should be made of the points to<br />

be included and of how comprehensive each point is to be. When<br />

making use of external inspectors prior agreement SllOU ld be<br />

reached about the extent of the report itself.<br />

1. Summary<br />

2. Introduction<br />

* Summary of the scope of the investigation and t.he damage.<br />

* Specification of the cause(s) of the damage and the mechanisms<br />

leading up to it.<br />

* Required measures, descriptions thereof, time frame, and<br />

fi nancing.<br />

* Recommendations <strong>for</strong> fu rther work<br />

* Name of owner/principal<br />

* <strong>Bridge</strong> number and name<br />

* Name of the consultant<br />

* A description of the purpose of the inspection including refer<br />

ence to the particulars of any damage.<br />

* A description of the extent of the investigation together with<br />

which elements have been included.<br />

3. -Basic Dat a of the<br />

<strong>Bridge</strong><br />

3.1 -Description of the<br />

<strong>Bridge</strong>/ Elements<br />

* Geographical posi tion of the bridge<br />

* Yea r of construction; possibly also the builder and the engineer<br />

ing consultant.<br />

* <strong>Bridge</strong>'s design and principal geometric measurements.<br />

* Special elements<br />

* Materials em ployed<br />

* Design Loads and Service Loads<br />

The BRUTUS International's <strong>Bridge</strong> Card contains most of these<br />

data and can thus be used as an appendix to the report.<br />

<strong>Handbook</strong> <strong>for</strong> Bri dge <strong>Inspections</strong> 119


3.2 - Accessible<br />

Documentation<br />

3.3 location System<br />

4. Descriptio n of<br />

Condition<br />

4.1 Introduction<br />

4.2 Visually Recorded Da ta<br />

4.3 Measurements<br />

4.4 Materials Testing<br />

Accessible documentation can be like:<br />

• Drawings<br />

• Descriptions<br />

• Calculations<br />

• Previous inspection reports<br />

- mention should be made of who undertook the inspection<br />

together with a highlighting of the main findings.<br />

• Documentation from the execution of the inspections like:<br />

- Special conditions surrounding the bridge's construction<br />

- Load conditions during the construction phase<br />

- Relevant infonnation given during construction meet<br />

ings, drawings etc. including speciali st infonnation rele<br />

van! in assessing the development of any damage.<br />

- Pi les records/minutes<br />

- Documentation concerning the surface treatment<br />

- Weather conditions during the construction period<br />

Steel: • Certi ficates <strong>for</strong> the materia ls used .<br />

• Documentation of the checks carried out<br />

on the welding.<br />

Concrete: • Composition<br />

• Conditions during casting process<br />

• Requirements fo r the hardening process<br />

w/c ratio<br />

• Type of cement and quantity used<br />

• Aggregates<br />

• Add itives<br />

• Type of<strong>for</strong>mwork used<br />

• Description oflhe axis numbering system with reference to<br />

appended drawings.<br />

• Time oflhe inspection<br />

• Weather conditions<br />

• Access equipment<br />

• Brief description of the scope and execution of the inspection<br />

• Extent to which consultants were employed<br />

• Data recorded should be allocated to the relevant elements<br />

• Visuall y recorded data should be described with reference to<br />

annexed photographs and sketches<br />

• The level and consequence(s) of any damage should be assessed<br />

in accordance with the codes deta il ed in Chapter 5 -<br />

" Damage Evaluation Fundamentals"<br />

• One summary of the resu lts per type of measurement taken<br />

should be drawn up and included as an annexe. The summary<br />

should be edited after the location has been fix ed.<br />

• One summary of the results per type of materi als test undertaken<br />

should be drawn up and included as an annexe. The summary<br />

should be edi ted after the location has been fixed.<br />

120<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


4.5 Statistical Background<br />

4.6 Submission of Reports<br />

to BRUTUS<br />

5. Damage Assessment and<br />

the Measures Re quired<br />

6. Description of the<br />

Measures to be taken a nd<br />

Main Costs<br />

7. Alternative Repair<br />

Strategies<br />

Appendices<br />

• The scope and results of any specially required calculations<br />

shou ld be described.<br />

• Any ass umptions used in the calculations should be given.<br />

• The results of any stati stical calcul at ions should be presented<br />

with the complete set of calculations included as an annexe.<br />

• This includes a full y completed BRUTUS inspection <strong>for</strong>m.<br />

• The fOnTIS <strong>for</strong> any measurements or materials testing should<br />

also accompany the inspection fOnTI.<br />

• The scope and cause(s) of any damage together with the<br />

measures required to be taken should be assessed on the bas is of<br />

the data collected and the tests undertaken.<br />

• It is recommended that the li me required <strong>for</strong> any necessary<br />

repairs reflects the degree of damage.<br />

• The description should be di vided into secti ons corres ponding<br />

to the elements involved.<br />

• The grouping together of different types of damage requiring<br />

repair measures and their attendant degree and consequence(s)<br />

should be arranged according to the recommended time <strong>for</strong> car<br />

ry ing out the repairs.<br />

• [n accordance with Brutus International' s<br />

'Guidelines <strong>for</strong> the Management, Running and<br />

Maintenance of <strong>Bridge</strong>s' alternative repair strategies must be<br />

presented on the basis of the description of the measu.res to be<br />

taken and their associated costs.<br />

• These strategies should incorporate costs 10 the road user and<br />

other possibl e costs 10 the community should these prove re le<br />

vant.<br />

• An assessment shou ld be drawn up of the existing remaining<br />

lifespan of the bridge, the lifespan after completing tbe repairs<br />

and the costs of demolishing/rebui lding the bridge.<br />

• (Net) present day va lues should be calculated fo r the di ffe rent<br />

strategies, discounted over 25 years using the prevailing rea l<br />

rates of interest.<br />

'" Grouping of the strategies<br />

A Small-sca le (and poss ibly detailed) drawings of the rele<br />

vant elements.<br />

B Measurements - refer to Chapter 8.4 <strong>for</strong> present.ation and<br />

results.<br />

C Material s Testing - refer to Chapter 8.5 <strong>for</strong> presentation<br />

and results.<br />

o Photographs accompanied by comments taken from visua l<br />

records.<br />

E Any necessary statistical analyses.<br />

F Any necessary drawings relating to the descripti_on(s) of<br />

the proposed repa irs.<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong> 121


8.4 Measurements<br />

Forms have been developed in BRUTUS <strong>for</strong> recording the follow·<br />

ing measurements:<br />

* Levelling<br />

* Horizontal distances/di splacement<br />

A <strong>for</strong>m <strong>for</strong> general use is avai lable <strong>for</strong> other measurements.<br />

The <strong>for</strong>ms are based on Microsoft Excel spreadsheets linked to the<br />

BRUTUS International inspection module. The identity of a bridge<br />

is transferred directly from BRUTUS International when a new<br />

measuremenl fonn is drawn up. An already existing Excel <strong>for</strong>m<br />

containing previous measurements should continue to be used<br />

<strong>for</strong> recording new measurements of the same type.<br />

Recording and Making<br />

Reports<br />

The foll owing data must be recorded and reported:<br />

* Date when measurements were taken<br />

* Which type of ins peel ions the measurements relate to<br />

* The intervals at which the measurements were taken, especially<br />

if this deviates from the inspection intervals<br />

* Those taking the measurements and, possibly, the person ulti<br />

mately responsible <strong>for</strong> them<br />

* Time/temperature/weather conditions. Additionally, <strong>for</strong> levelling<br />

the following factors should be included:<br />

measuring horizontal distances/displacement<br />

height of sag<br />

vertical distances<br />

headroom<br />

* Type of measuring equipment used<br />

* Other comments such as special weather conditions, deviations,<br />

and other infonnation which could be important <strong>for</strong> interpreting<br />

the results<br />

* Location on tbe bridge wbere the measurements were taken - see<br />

Chapter 2.4 " Location of Measurements".<br />

* Results of the measurements<br />

It may be worthwhile presenting the results of, fo r example, a<br />

Special Inspection in an extended report incorporating tables and<br />

visual di splays. After levelling has been carried out, profiles could<br />

be portrayed both lengthways and transversely; the results can be<br />

shown together with previolls measurements and even theoretical<br />

values.<br />

The results of measurements taken should be di scussed and<br />

assessed and will then fonn part of the process of establishing the<br />

degree of any damage, its consequences and cause(s).<br />

122<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


8.5 Materials Testing<br />

As with measurements, BRUTUS International also contai ns<br />

specific Excel based fo rms fo r recording the results of the fo llowing<br />

materials testing:<br />

* Locating rein<strong>for</strong>cement elements/surface cover of concrete<br />

* Measuring the depth of carbonisation<br />

* Measuring chloride content<br />

A general fonn is ava il able <strong>for</strong> recording other types of materials<br />

test ing.<br />

The following data must be recorded and reported on:<br />

Recording and Making<br />

Reports<br />

* Date of the materials tests<br />

* Which type of inspection the materials testing is associated with<br />

* Those conduct ing the materials testing and, possibly, the person<br />

ultimately responsible <strong>for</strong> them<br />

* Temperature and weather conditions<br />

* Method(s) and eq uipment employed, possibly also making ref<br />

erence to Norwegian Pub lic Roads Administration Manuals<br />

Nos. 0 14:'Laboratory Testing ' and 0 15:'On Site Testing'<br />

* Remarks, <strong>for</strong> example concerning the surface treatment, devia<br />

tions and other in fonnation with special significance <strong>for</strong> assess<br />

ing the results<br />

* Location of the materials testing, e.g. which elemeot(s)/axis<br />

reference - see Chapter 2.4 ' Location System'<br />

* The results of materials testing<br />

Figure 8.5- 1 shows examples of the symbols which may be used to<br />

illustrate the different kinds o f tests in drawings and sketches.<br />

Symbols and Type of Testing<br />

® Test site (Bk, Kp, Kd, Oh)<br />

@ Photograph No.3<br />

r,;:;....., Area with a surface cover less than 10 mm<br />

'--'V<br />

Kd3 =5 In Test Area 3 the depth o f carboni sation is 5 mm<br />

Od2 The surface cover <strong>for</strong> Test Area 2<br />

Kp2 The chloride profile <strong>for</strong> Test Area 2<br />

Oh2 Material cut from Test Area 2<br />

Bk6 Core No.6<br />

Figure 8.5-1: Ewmples oflhe symbols which maybe IIsed 10 ilIlls/Y(I/e difJerel1l<br />

killds of tests<br />

<strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong> 123


The test sites of materials test ing co nducted during a Specia l<br />

Inspection should be collective ly illustrated in drawings or sketches<br />

as indicated in Figure 8.5-2.<br />

Numbering the Tests<br />

Presenting the Results<br />

The tests are to be numbe red fo r each element tested, e. g. <strong>for</strong> each<br />

column. So far as columns are co ncerned Test No I sho uld be th e<br />

one conducted lowest down the co lumn with the numbers all ocated<br />

in ascending order moving up each co lumn.<br />

If, fo r examp le, measuring the surface cover, the depth of carbonisatlon<br />

and the chloride content have all bee n conductedsimultaneously,<br />

then the results should be prese nted in a table in such a way<br />

that al l the results from each particular test site can be co mpared.<br />

The assumed cement content should be given in kg/m3 of concrete.<br />

The co nversion facto r <strong>for</strong> the chl oride content of co ncrete by<br />

weight to the chloride content of ce ment by weight shoul d also be<br />

indicated. In the foll owing calculation the specific weight of the<br />

concrete is taken as 23 00 kg/m3<br />

Altiluoa -k. + I 0,0<br />

J<br />

0 4 .1"'1<br />

I<br />

o 2·IOd/KI>'OhJ<br />

®<br />

~ 3<br />

2<br />

.l0.]:; r<br />

1.(0d/Kp)<br />

0<br />

3<br />

,.on<br />

4<br />

,, 117S l<br />

> .<br />

Su~No.4<br />

Surtace No.3 (West)<br />

•<br />

(South)<br />

~II _ '"_No.'<br />

.. (North)<br />

Test<br />

"<br />

Assumed Volume of Cement XlCI kWm'<br />

Conversion Facto< 7.67<br />

Figure 8.5-2: Presenlalion ofTesl Areas & Resulls<br />

124<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


Drilling cores<br />

In this instance an exception can be made concerning the nurn·<br />

bering system already mentioned above. Cores removed by<br />

drilling could, <strong>for</strong> example, be consecutive ly numbered <strong>for</strong> a<br />

whole bridge. The number should be fottowed by a further <strong>for</strong>m<br />

of identification to show where the test was taken:<br />

Bk I (A3+ I 0): Core No. 1 taken from the superstructure al ong<br />

axis No.3 + 10 m.<br />

- 45 %<br />

-E 40 %<br />

35 %<br />

'" 30%<br />

:;; 25 %<br />

'" c:<br />

" =><br />

'"<br />

-0 20%<br />

" 0><br />

'"<br />

15 %<br />

c: 10 %<br />

u<br />

-" 5%<br />

"-<br />

0 %<br />

Bk2(P5):<br />

Core No. 2 taken from Column (Pillar) No<br />

'4 Covering of Assembly<br />

~ Rods as described<br />

,---- I<br />

,---- :.-<br />

Covering of Static Rein<strong>for</strong>cement<br />

I<br />

,<br />

-<br />

as described<br />

.11.<br />

Interval <strong>for</strong> Surface Cover in mm<br />

Figllr€ 8. 5-3: Dis/ribll/ioll of/he SlIrface Cover<br />

Presentation of Chloride<br />

Profiles<br />

""<br />

.l:! )'00<br />

•<br />

,<br />

h "<br />

•<br />

E 1.00<br />

0<br />

~ 1-'0<br />

u<br />

~ 1.00<br />

."<br />

"00 ,<br />

'"<br />

""<br />

], 1-'0<br />

~<br />

, W><br />

•<br />

8 1-'0<br />

" v 1.00<br />

• ""<br />


It is important thaI the resul ts of materials testing are presented in<br />

such a way that they are eas ily understood. The fo llowing shows<br />

examp les of how the results of ordinal)' materials testing of concrete<br />

were presented.<br />

Figure 8.5-3 shows the distribution of the surface cover of the rein<strong>for</strong>cement<br />

in the superstructure, Area I ofGimseystraumen <strong>Bridge</strong><br />

in Norway. The distribution results are based on 2029 indi\' idual<br />

measurements.<br />

Figure 8.5 A illustrates examples of the presentation of chl oride<br />

profiles <strong>for</strong> Ihe central section of Area 1,5 metres from Axis No .2<br />

in the superstructure ofGimsoystraumen <strong>Bridge</strong> in Norway.<br />

potential readings (mV CS E)<br />

25 125 225 32S 425 525 625 725 825 925<br />

0, 12 - 135 -131 -140 -74 -21 -8 -32 -120 -101<br />

100: -83 -84 -84 -85 -71 -30 7 -68 -31 -III<br />

200 : -9' -114 -83 -58 -51 -2] -IS -34 -10 I -79<br />

300 : -75 - 158 -99 -68 -101 -100 -35 -68 -105 -87<br />

400: -4' -110 -75 -60 -42 -100 -32 -38 -92 -102<br />

500 : -130 -215 -163 -117 -119 -56 -23 -64 -75 -42<br />

600, -9 1 -209 -57 -97 -112 -112 -65 -71 -96 -77<br />

700 : -90 -170 -74 - 11 4 -71 -67 -60 -40 -67 -147<br />

800 : -134 - 182 -156 -114 -80 -33 -45 -44 -72 -47<br />

900 : -40 - 122 -121 -82 -43 -40 -45 -89 -88 -55<br />

a) Minorcritical colorcombination<br />

potent ial readings (mV CSE)<br />

25 125 225 32S 425 525 625 725 825 925<br />

0, 12 - 135 -1]1 -140 -74 -21 -, -32 - 120 -101<br />

100: -83 -84 -84 -85 -71 -30<br />

,<br />

-68 -31 -III<br />

200 : -9' -114 -83 -58 -51 -23<br />

-34 -10 I -79<br />

300 : -75 -158 -99 -68 -101 -100 -35 -68 -105 -87<br />

400: -4' -110 -75 -60 -42 -100 -32 -38 -92 -102<br />

500 : -I ]0 -215 -16] -117 -119 -56 -23 -64 -75 -42<br />

600, -91 -209 -57 -97 -112 -112 -65 -71 -96 -77<br />

700 : -90 - 170 -74 -1 14 -71 -67 -60 -40 -67 - 147<br />

800 : -I ]4 - 182 -156 - 11 4 -80 -33 -45 -44 -72 -47<br />

9o,,, -40 - 122 -121 -82 -43 -40 -45 -89 -88 -55<br />

b) Most possible colorcombination<br />

potent ial readings (mV CS E)<br />

25 125 225 325 425 525 625 725 825 925<br />

0, 1 ' -135 -131 -140 -74 ' 1 -, J:I -120 -101<br />

100: -83 -84 -84 -85 -71 ~() 7 -68 -31 -III<br />

200 : -9' -114 -83 -510: -51 -2J -IS<br />

-101 -79<br />

]00 : -75 -158 -99 -6, -101 -100 J5 -68 -105 -87<br />

400: -44 -110 -75 -60 -42 -100 12 -lK -92 -102<br />

500 : -I ]0 -215 -16] -117 -119<br />

-2] -64 -75 -42<br />

600 : -91 -209 ·57 -97 -112 -112 " -65 -71 -96 77<br />

700 : -9' -170 -74 -114 -71 -67 -60 40 -67 -147<br />

800 : -134 -182 -156 -114 -80 -33 -45 -44 -72 -4'<br />

90


ECP-Measurements<br />

For the presentation of potential readings (ECP) the<br />

drawings/sketches should clearly indicate where the measurement<br />

was taken <strong>for</strong> each element and the location of the earthing point.<br />

EC P readings should be interpreted in accordance with Report<br />

No.94-l 6 issued by the Norwegian Publ ic Roads Administration,<br />

<strong>Bridge</strong> Di vision: ' Recommendations <strong>for</strong> the Use of<br />

Electrochemical Equipment <strong>for</strong> Measuring Potential'. The in terpretati<br />

on should include, amongst other things, the requirement<br />

<strong>for</strong> three different versions according to co lour setti ng;<br />

Less cri tical colour setting than (b)<br />

Colour choice considered to be the best<br />

More critical colour setting than (b)<br />

Exampl es of the above are shown in Figure 8.5-5.<br />

8.6 Presentation of Damage<br />

Drawings and Sketches<br />

For the reporting of visual inspections drawings/sketches can be<br />

made showing the location and scope of the different kinds of<br />

damage which are in ev idence. This can prove to be an extensive,<br />

time consuming task and should only be undertaken in very special<br />

circumstances.<br />

One exception will be the presence of serious, special sc ratches<br />

and fissures which have to be photographed and/or drawn in on<br />

sketches stating thei r total, the distance from each other and their<br />

length. Both the maximum and average opening of these scratches<br />

and fissures should be indicated.<br />

The symbols which can be empl oyed in draw in gs <strong>for</strong> each Iype of<br />

damage are presented in Figure 8.6- 1.<br />

w •<br />

Casting j Oint<br />

Delam ination, spalling<br />

Po ro usa r bad qu a Ii ty co n crete<br />

_.<br />

0,2 m m ,2,O mm<br />

Cracking<br />

V isi b Iy co rrod ing rein fa ree ·<br />

ment<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 127


128 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


9 DAMAGE EVALU­<br />

ATION CATALOGUE<br />

The detailed list of the different categories of damage is intended<br />

to assist in the assessment of the significance of any damage to<br />

individual bridges in ajustifiable and proper manner.<br />

Sub-chapters<br />

The list has been divided into Ihe fotlowing II sub-chapters which<br />

deal with types of damage to different materials and to the usual<br />

elements and accessories fou nd on a bridge.<br />

9. 1 Elements in or on Ihe Ground<br />

9.2 Concrete Elements<br />

9.3 Steel Elements<br />

9.4 Masonry Elements<br />

9.5 Timber Elements<br />

9.6 Wearing surfaces/insu lat ion against dampness<br />

9.7 Bearings with bearing shelflbearing shelf<br />

9.8 Joints/joint threshold<br />

9.9 Raili ngs & parapets<br />

9.10 Dra inage system<br />

9. 11 Other items of equipment<br />

Each of the above elements are in turn subdivided into the different<br />

types of damage - refer to Chapter 5.2 "Types of Damage".<br />

The following standard layout should be used <strong>for</strong> each type of<br />

damage:<br />

Description<br />

Ca use of Damage<br />

Re leva nt<br />

Measu rements/Materials<br />

Testing<br />

Degree of Damage and the<br />

Consequenses<br />

Condition w hich trigger<br />

Maintenance Works<br />

Action to be ta ken<br />

Examples<br />

Explanation of the damage in question<br />

Possible causes of the damage ari sing<br />

Measurements /materials testing which ought to be undertaken in<br />

order to discover hidden damage, to ascertain its scope and to project<br />

future developments and/or propose possible causes of damage.<br />

Description of how to evaluate the seriousness and consequences<br />

of the particular type of damage.<br />

Requirements and recommendations concerning the condition<br />

which can trigger maintenance work . A degree of damage':::"2 is<br />

requ ired as a minimum.<br />

Suggested action needed to fo llow up a damage or repa ir it.<br />

Most of the types of damage will be described with illustrat ions.


9.1 Elements in or<br />

on the Ground<br />

These elements are detailed in Chapler 2.2 'Types of Elelnents',<br />

and the following types of damage can be found.<br />

Damage<br />

101 Subsidence of ground/embarkments<br />

102 Obstruct ion of waterway<br />

103 ScouringlErosion of river course<br />

104 Inadequate cleaning up/removal procedures<br />

109 Other Iypes of damage/defects<br />

Page<br />

13 1<br />

133<br />

135<br />

14 1<br />

143<br />

The above items will now be described more fully.


9.1 ELEMENTS IN THE GROUND<br />

101. Subsidence of Ground/Embarkments<br />

Description<br />

Vertical movements in the soil behind abutment, wing walls and infill etc. which do not affect the<br />

bridge itself.<br />

Degree of Damage<br />

Error during the planning phase. The load capaci ty oflhe soi l has been overestimated .<br />

• Incorrect material(s). Wrong compos ition of material has been used in the backfill.<br />

'" Work incorrect ly exec uted - not as origina lly described.<br />

* Loads. Traffic causes overloading.<br />

'*' Damage caused by accidents, e.g. flooding<br />

'" In-service damage, e.g. the results of erosion.<br />

'" Relevant Measurement<br />

* Levelling<br />

'" Evenness<br />

Degree of Damage/Consequences of the Damage<br />

The degree of damage should be selected based on its scope and probable rale of development.<br />

Basically subsidence can be of significance fo r traffic safety, maintenance costs and the environment.<br />

In fact subsidence behind abutment piers can result in differences in the height of the road<br />

surface where intill and pavement meet. This in turn has implications <strong>for</strong> traffic safety. Height diffe<br />

rences can also lead to impact in the joints and consequent noise pollution <strong>for</strong> those living in the<br />

vicin ity of the bridge.<br />

Conditions Triggering Maintenance Measures<br />

The inspector must assess each case indi vidua lly. If the lengthwise height difference <strong>for</strong> the carriageway<br />

on a main road exceeds 20 mm (or 30 mm <strong>for</strong> other national roads) when measured with a<br />

2m long straightedge, then the necessary maintenance measures should be set in motion.<br />

Maintenance Measures<br />

* Fill in with sui table material(s)<br />

* Small differences in he igh t can be evened out with asphalt<br />

• If the subsidence continues then consideration should be given to replacing the entire inti II<br />

behind the abutment.


9.1 ELEMENTS IN THE GROUND<br />

Example9.1-1<br />

Subsidence or the infill behind the abutment pi er<br />

has caused a difference in height of27 mm in the<br />

road surface. The bridge is situated on a main road<br />

and subject to a lot ofhcavy traffi c. The gap has<br />

resulted in noise pollution <strong>for</strong> those li ving in the<br />

vicinity of the bridge. The damage has affected<br />

both traffic safety and the environment.<br />

Type of Damage:<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

101 Subsidence<br />

3T,3M<br />

61 Traffic Loads<br />

Procedures:<br />

Fill with asphalt within I year.<br />

Example 9.1-2<br />

Severe subsidence of the bark infi ll with a resultant<br />

large difference in height between the bridge and<br />

the inti I\, The damage is to be considered as dangerous<br />

<strong>for</strong> traffic, and the subsidence has also affected<br />

Ihe appearance of the wall underneath the bridge.<br />

The di splacement of the columns indicates that the<br />

pressure exerted by the earth has cause additional,<br />

great strai n on them.<br />

Type of Damage:<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

of Materials<br />

101 Subsidence<br />

3T,2M<br />

II Incorrect Choi ce<br />

Procedures: Replacement of the material with, <strong>for</strong><br />

example, EPS. The condition of the columns must<br />

be carefully checked after removal of the old material.<br />

Example 9.1-3<br />

Subsidence o f the earth under a small part of a<br />

wing-wall. This can affect load bearing capacity<br />

should the subsidence develop.<br />

Type of Damage:<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

101 Subsidence<br />

2C<br />

9 Other/Unknown<br />

Procedures:<br />

5 years.<br />

Fill with appropri ate material within


102. Obstruction of Waterway<br />

9.1 ELEMENTS IN THE GROUND<br />

Description<br />

The accumu lation of debris, branches, driftwood and the like have resu lted in constrictions in drainage<br />

cul verts. The speed of the water flow will consequently increase, and the slate of the current<br />

will also change; this can in turn lead to erosion and scouring.<br />

Cause of Damage<br />

'" Insufficient regular management/maintenance; insufficient clearing out of the drainage culvert.<br />

'" Accidental damage, e.g. flooding.<br />

Degree of Damage/Consequences of the Damage<br />

Since erosion and scouring can very qui ckly result from constrictions in drainage culverts, the<br />

degree of damage should normally be given a high score.<br />

Constricti ons can affect the bridge's load bearing capacity, traffic safety and maintenance costs as<br />

fo llows:<br />

'" Increased risk of erosion and scouring leading to reduced load bearing capacity and consequently<br />

to increased maintenance costs.<br />

* A combination of damming up and breaking up of ice particularly can lead to the water flooding<br />

over the road, thus affecting traffic safety.<br />

Conditions Triggering Maintenance Measures<br />

Routines should be established <strong>for</strong> clearing river courses. In the event of constrictions arising the<br />

need <strong>for</strong> remedial measures should be assessed in each case. This wi ll depend on, amongst other<br />

th ings, the degree of the constriction and whether the drainage culvert has extra capacity or not. The<br />

necessary measures should be taken be<strong>for</strong>e directly related damage arises.<br />

Maintenance Measures<br />

• Clear out the drainage culvert<br />

* Restore the ori ginal water course<br />

* Special action required <strong>for</strong> damming up


9.1 ELEMENTS IN THE GROUND<br />

Exa mple9.1-4<br />

The complete water course has been fi lled with<br />

debris from bushes and trees. The bridge is situated<br />

above a typical flood course. It has, however, satisfactory<br />

enough foundations such that there should<br />

be no danger of scouring. The constrictions can<br />

have consequences fo r the maintenance costs if the<br />

water runs out over the road into the material<br />

behind the abUlmenl pier which is then displaced.<br />

Type of damage:<br />

102 Obstruction of<br />

waterway<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

nmg.<br />

Procedures:<br />

Thorough cleaning out within 1 year.<br />

3M<br />

44 Insuffi cient clea-<br />

Example 9. 1-5<br />

Rubbish bui ld-up in the drainage culvert. There is a<br />

risk orlhe material around the pipe sufferi ng from<br />

scouring after a flood. The load bearing capacity of<br />

the bridge and the maintenance costs can conse~<br />

quent ly be affected.<br />

Type of Damage:<br />

waterway<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

nmg.<br />

102 Obstruction of<br />

2C.3M<br />

44 Insufficient clea~<br />

Proced ures:<br />

Thorough cleaning out within I year.


9.1 ELEMENTS IN THE GROUND<br />

103. Scouring/Erosion of River Course<br />

J~~~~ ~~:'" '" ABOVE WATER<br />

,- 1... ______ _<br />

OR IGINAL LEVEL<br />

........ 1<br />

1... ________ -'<br />

CAUSED BY SURFACE<br />

WATER<br />

Description<br />

Damage in th is category includes erosion oflhe earth both above and below the water line. An<br />

exampl e of the latter could be erosion of the natural river bed or of protection against erosion. If the<br />

erosion is not stopped in time the fou ndations will become under-scoured. On the other hand damage<br />

above the water line can be exemplified by erosion of embankments and slopes in the immediate<br />

area of abutments and columns.<br />

Cause of Damage<br />

Some of the possible causes are as fo llows:<br />

• Faulty design: During the plann ing period inadequate development or lack of attention paid to<br />

the draining ofT of surface wate r. inadequate design of a bridge can result in a narrowing of<br />

the waterway and a consequent increase in water speed.<br />

• Faulty construction: not carried out as prescribed<br />

• Unsatisfactory day-to-day run ning/maintenance; Damming up of the water course due to the<br />

accumulat ion of branches and other debris.<br />

• Accident impact; Erosion/scouring caused by severe water discharge from fl ooding.<br />

• In-service damage; For example the results of changes to the water course fo ll owing work carri<br />

ed out on the ground in the vicinity.<br />

Degree of Damage & its Consequences<br />

Erosion below water level should be all ocated a high degree of damage because it can develop very<br />

quickly. Even small movements of earth around foundati ons can affect the carrying capacity.<br />

Erosion can qui ckly turn into scouring. The degree of damage fo r situations above the water level<br />

should be assessed based on the local conditions and probable developments.<br />

Un derwater erosion can affect both carry ing capacity and maintenance cost.<br />

Carrying Capacity<br />

• Erosion around a bridge opening can reduce the carrying capacity of the foundations when the<br />

earth around them is removed. Foundations without pi les are especiall y vul nerable, and the risk<br />

of under-scouring is great - please refer to th e drawing above. Base slab foundations will always<br />

lose carrying capacity when subjected to underscouring with resultant subsidence.Subsidence in<br />

the foundations produces de<strong>for</strong>mation of the superstructure and can lead to the partial or ful l col<br />

lapse of the bridge in question.


9.1 ELEMENTS IN THE GROUND<br />

•<br />

Clfklinallevel<br />

V<br />

, \ •<br />

-<br />

V<br />

V<br />

V •<br />

/<br />

B<br />

~<br />

- ~ -<br />

""'"'"<br />

/' • V<br />

• V •<br />

7<br />

vi<br />

1,5 m<br />

Foundations on piles do not no rmally need ea rth masses under the foundations to achieve carrying<br />

capacity. Free-standing piles, on the other hand, will be vu lnerable to damage from ice, dtifnvood,<br />

rot and should there<strong>for</strong>e be protected. The figure above is based on the <strong>for</strong>mulae <strong>for</strong> calculating carry<br />

ing capacity detailed in the <strong>Bridge</strong> Manual and demonstrates how carrying capacity is reduced<br />

from 100% (at the original levei 'A ') to 50% (at new level 'S') when erosion. Should the erosion be<br />

allowed to continue up to level 'C', th en carrying capacity will be reduced to 25% of the o:riginal<br />

figure.<br />

Maintenance Costs<br />

Even minor damage to protective measures against erosion show a tendency to accelerate and become<br />

expensive to repair. It is important that protection against erosion be in working order especially<br />

in a flood situation, otherwise scouring can arise with resultant severe co nsequences <strong>for</strong> the carrying<br />

capacity. Erosion above water level can offect the carrying capacity, traffic safety, majntenance<br />

and the environm ent. The removal of earth masses from around abutment piers can lead t() reduced<br />

carrying capacity. Erosion can produce holes in the pavement wi th resultant risk to road users. The<br />

scope of the damage can increase markedly if measures are not taken to halt the erosion.<br />

L-<br />

Conditions which Trigger Maintenance Measures<br />

Maintenance measures must be undertaken immediately when erosion and particularly under-scouri<br />

ng of foundations have occurred underwater. Cases of erosion above the water line should be individually<br />

assessed by the inspector.<br />

Maintenance Measures<br />

Undenrarer :<br />

• Flushing out the water course<br />

• Repair of damaged erosion protection<br />

• Construct erosion protection<br />

• Replenishing earth masses below and around foundations with suitable material<br />

• Recasti ng of concrete under the foundations if the carrying capacity enables so. Found alions<br />

supported on pi les should be given special attention.<br />

Above /Va/erLeI'e1<br />

• Replenishing with suitable new materia ls<br />

• Covering em bankments w ith paving stones<br />

• Improvements to the drainage system directed fonvards removal of surface water.<br />

• Sowing seeds/planting to encourage binding of the soil.


9.1 ELEMENTS IN THE GROUND<br />

Original Level<br />

~-..I....- \--1" .f-:7--.~<br />

/ :""<br />

. r . 9~· ~ ~<br />

\le'/el after Erosion<br />

Example 9. 1-6<br />

The original undenvater ground level has been eroded<br />

down to the same level as the bottom of the<br />

base foundation slab due to insufficient protection<br />

against erosion.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

3C<br />

Cause of Damage: 13<br />

Poor design solutions<br />

Procedures: Replenish with suitabl e materials and<br />

install protection against erosion within one year.<br />

•<br />

,<br />

Original level<br />

\ " •<br />

•<br />

"<br />

•<br />

• "<br />

"<br />

•<br />

Level after Erosion<br />

~<br />

Example 9. 1-7<br />

The original underwater ground level has altered<br />

due to erosion with severe consequences <strong>for</strong> the<br />

carrying capacity. The ba ll ast co nsists of too fine a<br />

grade of material.<br />

Type of Damage:<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

Construction fa ult<br />

103<br />

4C<br />

38<br />

Procedures: Replen ish wit h suitab le materials and<br />

install protection against erosion in the course of<br />

s ix months.<br />

Example 9.1-8<br />

The base foundation slab has suffered under-scouring<br />

as the result of a serious flood. Carrying capaci<br />

ty has been greatly reduced.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

4C<br />

Cause of Damage: 73<br />

Flooding<br />

Procedures: The bridge should be closed until<br />

repairs have been carried out" immediate infilling<br />

with concrete under the foundations, replenish ing<br />

w ith suitable materials a nd installing protection<br />

against erosion to the same level as the origi nal<br />

river bed.


9.1 ELEMENTS IN THE GROUND<br />

Example 9.1-9<br />

Under-scouring of foundations on vertical piles<br />

because of insufficient protection agai nst erosion.<br />

Vertical, but not horizontal loads can be accommodated,<br />

whilst the piles can be subjected to un<strong>for</strong>eseen<br />

sources of impact. The consequences <strong>for</strong> the bridge's<br />

carrying capacity arc serious.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

4C<br />

Cause of Damage: 12<br />

Erroneus calculat ions<br />

Procedures: Infi lling with concrete under the foundati<br />

ons, replenishing with su itable matcrials and<br />

installing protection against erosion. This shou ld be<br />

carried out within 6 months.<br />

Example 9.1-10<br />

Erosion of the embankment caused by the water<br />

from the pavement not being drained off as planned.<br />

If the situation is allowed to continue at the present<br />

rate of development, maintenance costs will be<br />

affected. Since a lot of public transport passes under<br />

the bridge, the damage is also of consequence fo r its<br />

appearance.<br />

Type of Damage:<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

Cause of Damage:<br />

Construction fau lt<br />

103<br />

3M,3E<br />

38<br />

Procedures: Infill ing with suitable materials,<br />

improvements to the drainage system and installati ­<br />

on of protecti on against erosion. To be carried oul<br />

during the year in question.<br />

Example 9.1-11<br />

A combination of erosion of the in fi ll behind the<br />

wing-walls and inadequate anchoring of the elements<br />

has resulted in the displacement of the fac ing<br />

slabs at the top edge of the bridge. Consequently<br />

there is a risk of them falling onto the pathway<br />

below the bri dge.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

4T<br />

Cause of Damage: 38<br />

Faulty Construction<br />

Procedures: The elements should be righted and<br />

made safe within 6 months.


9.1 ELEMENTS IN THE GROUND<br />

Example 9.1-12<br />

As a result of erosion some of the concrete blocks<br />

on the front of an abutment pier have started to sl ip.<br />

Settlement and holes have appeared in the infill<br />

behind the abutment pier which in turn has an effect<br />

on traffic safety.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Conseq uences:<br />

4T<br />

Cause of Damage: 38<br />

Faul ty Construction<br />

Procedures: Temporarily repair by immediately<br />

infilling with material and later permanently by<br />

installing a relief plate against the back wall.<br />

Example 9.1-13<br />

A small amount of erosion under an abutment pier<br />

due to lack of attention being paid during the planning<br />

phase to the draining away ofwaler.<br />

Type of Damage: 103<br />

Scouring/erosion of rive r course<br />

Degree of Damage &<br />

Consequences:<br />

1M<br />

Cause of Damage: 13<br />

Poor design solutions<br />

Procedures: None<br />

Example 9.1-14<br />

Erosion has started under an abutmenl pier because<br />

insufficient attention has been paid during the construction<br />

phase to draining water from the roadway.<br />

Ma intenance costs may be affected if the erosion is<br />

allowed to develop.<br />

Type of Damage: 103<br />

Scouring/erosion of river course<br />

Degree of Damage &<br />

Consequences:<br />

2M<br />

Cause of Damage: 38<br />

Faulty Construction<br />

Procedures: Replacement of ballast materials,<br />

improvements to the drainage system and protection<br />

against surface erosion. To be carried oul within<br />

5 years.


9.1 ELEMENTS IN THE GROUND<br />

Example 9.1 -15:<br />

Erosion on the front of an abutment pi er has caused<br />

some of the concrete blocks to start sl ipp ing out of<br />

place.<br />

\<br />

Type of Damage: 103<br />

Scouring/erosion of ri ver course<br />

Degree of Damage &<br />

Conseq uences: 2.\1<br />

Cause of Damage: 38<br />

Faulty Construction<br />

Procedu res:<br />

Improvements to the drainage system, infi ll ing<br />

underneath the flagstones and relaying the flagsta·<br />

nes. To be carried oul within 5 years.


9.1 ELEMENTS IN THE GROUND<br />

104. Inadequate Clearing Up & Removal<br />

Procedures<br />

Description<br />

Included under this heading are the following:<br />

• Insufficient clearing up once construction work is complete<br />

• Failure to remove vegetation under and against a bridge<br />

• Failure to remove materials/equipment stored under a bridge<br />

Cause of Damage<br />

• Construction fauit - insufficient clearing lip once constructi on work is complete<br />

'" Inadequate day-to-day management/maintenance<br />

Degree of Damage/Consequences<br />

The degree allocated to the damage will depend on its type, scope, and the speed at which other<br />

kinds of damage can develop. A hi gh degree of damage should be used <strong>for</strong> new bridges.<br />

Inadequate clearing up and removal procedures can cause further damage which could affect maintenance<br />

costs or the environment. Costs to remove or clear up items are often less than to repair<br />

secondary damage.<br />

Conditions which Trigger Maintenance<br />

Clearing up and removal procedures should be fo llowed immediately after the construction ora<br />

new bridge is complete. For already existing bridges procedures should be effected if inadequate<br />

clearing up or removal of items resulting in damage which could affect ma intenance costs or the<br />

environment.<br />

Procedures<br />

* Clearing up or removal of the items in question


9.1 ELEMENTS IN THE GROUND<br />

Examplc9.1-1 6<br />

Dense vegetation on an abutment pier.<br />

Type of Damage: 104<br />

Inadequate Clearing Up/Removal<br />

Degree of Damage &<br />

Consequences: 3,\1<br />

Cause of Damage: 44<br />

Inadequate Maintenance<br />

Procedures:<br />

The vegetation shou ld be removed within a yea r.<br />

Example 9.t-1 7<br />

Culvert used to store bails of straw.<br />

Type of Damage: 104<br />

Inadequate Clearing Up !Removal<br />

Degree of Damage &<br />

Consequences:<br />

3M<br />

Cause of Damage: 44<br />

Inadequate Maintenance<br />

Procedures:<br />

Clear olil ihe culvert with in onc year.


9.1 ELEMENTS IN THE GROUND<br />

109. Other Types of Damage to River<br />

Course<br />

Description<br />

Th is category includes damage/shortcom ings not already covered in Chapler 9.1 , fo r example the<br />

loads exerted on foundations will increase if infi ll is deposited around them. Excavation work near<br />

to foundations can reduce carrying capacity, whilst the fiver can suffer from erosion in a different<br />

way after excavation of the water course. The foundations can then be put at risk.<br />

This category also includes faults/shortcomings in the soil itself which can also lead 10 damage, <strong>for</strong><br />

example the absence ofwaler training wal ls, or a waterway with insufficient capacity. Additional<br />

examples may have originated from the co nstruction period, such as embankments wh ich remain<br />

unsown or yet to be installed protection against erosion.<br />

Cause of Damage<br />

'" Design fault<br />

'" Construction fault<br />

'" Inadequate daY-Io-day maintenance<br />

Degree of Damage/Consequences<br />

The degree must be assessed against the background of the prevailing local conditions and how<br />

much the damage could develop.<br />

The inspector must assess the consequences.<br />

Conditions which Trigger Maintenance<br />

Action should be taken whenever fau lts/shortcomings can lead to the development of damage<br />

which cou ld affect carrying capacity.<br />

Procedures<br />

These should be assessed in each individual case.


9.2<br />

ConcreteE lem ents<br />

The undernoted types of damage may arise in elements made of<br />

concrete:<br />

No.<br />

Page<br />

201 Settl ement of concrete element 146<br />

202 Movement of concrete element 148<br />

203 De<strong>for</strong>mat ion of concrete element 150<br />

204 Cracks in concrete element 153<br />

205 Rupture of concrete element 160<br />

206 Damage to concrete surface treatment 162<br />

207 Lea kage/dampness of concrete 164<br />

208 Discolorati on of concrete element 168<br />

209 Insufficicnt/damaged cover of concrete element 170<br />

2 10 Weathering of concrete element 173<br />

2 11 Honeycombing of concrete element 176<br />

21 2 Delamination of concrete element 179<br />

2 13 Spalli ng of concrete element 180<br />

2 14 Corrosion of rein<strong>for</strong>cement 184<br />

2 15 Wa sh out of concrete element 188<br />

21 6 Inadequate cl eani ng of concrete element 19 1<br />

2 17 Inadequate Clearing Up/Removal 193<br />

290 Other damage to concrete element 195<br />

Examp les or the above will now follow.<br />

Damage to concrete wearing surfaces is described in Chapter<br />

9.6.2, whilst damage to concrete parapets is dealt with in Chapter<br />

9.9. 1.<br />

<strong>Handbook</strong> <strong>for</strong> Brid ge <strong>Inspections</strong> 145


9.2 CONCRETE ELEMENTS<br />

201 Settlement of Concrete Element<br />

Description<br />

Vertical movements in concrete abutment , wing walls, pillars etc. Sett lement in these eleme nts can<br />

late r lead to defonnation of the superstructure - refer to Type of Damage No. 203.<br />

Cause of Damage<br />

• Design fault - overestimati on of the ground's carrying capacity, underestimati on of the pressure<br />

exerted by the ground<br />

• Material fau lts - incorrect composition of infill material<br />

• Construction faults - fo undations not constructed as agreed<br />

'" Loads - caused by traffic or extra pressure on the ground in connection with construction work in<br />

the vicinity<br />

• In-service damage - secondary damage from erosion or underscouring of the ground.<br />

Current Measurements<br />

• Levell ing<br />

Degree of Damage/Consequences<br />

The degree of damage must be assessed based on the scope of the settl ement and its development as<br />

well as on any damage the settl ement may cause to the element which is subsiding. Both carrying<br />

capacity and/or maintena nce costs can be affected.<br />

146 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


9.2 CONCRETE ELEMENTS<br />

Conditions which trigger Maintenance<br />

Action must be taken immediate ly whenever settlement has lead to too Iowa carrying capac ity. For<br />

settl ement which can result in 100 Iowa carrying capacity action must be taken be<strong>for</strong>e this happens.<br />

Action should also be taken in cases where settlement can be of importance <strong>for</strong> maintenance costs<br />

Procedures<br />

. Replacement of infil l wit h a lighter material in order to reduce vertical loads and the pressure<br />

exerted by the ground .<br />

. Constructi ng new foundations usi ng, <strong>for</strong> example, pi les.<br />

Example 9.2-1<br />

Severe settlement of an abutment which is built on<br />

infill. The infi ll material's sensitivity to subsidence has<br />

been underestimated. The abutment has nol been subjected<br />

to any damage whi ch requires repair in the short<br />

term. The superstructure is of the continuous type, and<br />

it has become necessary to temporarily build up the<br />

bearings in order to reduce de<strong>for</strong>mation.<br />

Type of Damage:<br />

Dcgrce of DamagcJ<br />

Consequence:<br />

Cause of Damage:<br />

Procedures:<br />

20 I Settlement (abutment)<br />

203 De<strong>for</strong>mation of concrete<br />

element (Superstructure)<br />

I C <strong>for</strong> the abutment<br />

4C <strong>for</strong> the superstructure<br />

be<strong>for</strong>e the temporary<br />

support<br />

13 Poor design so lutions<br />

No action is required <strong>for</strong> the abutment , but the settlement<br />

should be fo llowed up by us ing levell ing<br />

The de<strong>for</strong>mation of the superstructure was so severe<br />

that the bridge had to be closed to heavy traffic until it<br />

had been jac ked up and the bearings had been bui lt up.<br />

<strong>Handbook</strong> fo r <strong>Bridge</strong> <strong>Inspections</strong> 147


9.2 CONCRETE ELEMENTS<br />

202 Movement of Concrete Element<br />

Description<br />

The movement of bridge elements away from their original position, e.g. horizontal disp lacement<br />

or rotation of abutment , piers or parts of the superstructure. Evidence of movement can o ften be<br />

seen in bearings and joint gaps.<br />

Cause of Damage<br />

... Design fau lts - overestimation of the ground's carrying capacity; earth pressure underestimated .<br />

... Materia l defects - incorrect materials <strong>for</strong> the infill.<br />

... Construction fau lts - foundations not constructed as designed .<br />

... Loads impact from traffic.<br />

• Inadequate day-ta-day operation/maintenance - absence of cleaning measures <strong>for</strong> joints .<br />

... Accident impact, e.g. flooding or traffic impacts.<br />

Current Measurements<br />

'" Measuring th e movements.<br />

Degree of Damage/Consequences<br />

The degree of damage should be fixed based on the size and probable development of the movement.<br />

Please note that movement is more cri tical <strong>for</strong> inclined than straight bridges because of the<br />

sideways di splacement of the superstructure.<br />

Extreme movements can affect the carrying capacity, but nonnally it is the maintenance costs<br />

which are influenced. Protruding edges along the kerb may affect traffic safety.<br />

Conditions which trigger Maintenance<br />

These should be assessed <strong>for</strong> each particular case and wi ll often depend on the relationship between<br />

the move ments whi ch have come to light and the capacity of the bearings and possibl y of the joint<br />

constructions. Furthermore the situation may depend on whether protruding edges represent a<br />

danger to trafiic.<br />

Actions<br />

• Cleaning joints<br />

• Jacking up and adjusting bearings and possibly also building them up<br />

• Replacement of infillmaterial with lighter ones in order to reduce the pressure onthe ground.<br />

148 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


9.2 CONCRETE ELEMENTS<br />

Example 9.2-2<br />

Unstable conditions have lead to movement in the<br />

abutment. The joint openings have become completely<br />

closed, and the spalling evident on the abutment<br />

and cross-girders indicates thai the superstructure<br />

is under continuous stress.<br />

Type of Damage: 202 Movement of concrete<br />

element<br />

Degree of Damage &<br />

Conseq uences: 2C<br />

Cause of Damage: 12 Erroreous calculation<br />

Procedures:<br />

Continuous taking of measurement s to fo llow developments.<br />

If these continue the infill behind the<br />

abutment will have to be rep laced within five years.<br />

Example 9.2-3<br />

The backfil l contains frost susceptible materials<br />

below ground level with the resu lt that the abutment<br />

has been subject to movement, whilst the<br />

superstructure has suffered sideways movement<br />

because the connection between the bridge and the<br />

abutment is skewed. There are protruding kerb<br />

edges on the superstructure on the roadway. The<br />

structures' abi lity to withstand the movements is<br />

temporarily suffi cient, and the bridge's carrying<br />

capacity has not yet been affected.<br />

Type of Damage: 202 Movement of concrete<br />

element<br />

Degree of Damage &<br />

Conseq uences: 2M <strong>for</strong> Abutment<br />

3T Superstructure<br />

Cause of Damage: I I Incorrect choi ce of materials<br />

Procedures:<br />

The intill behind the abutment should be replaced,<br />

and the superstructure jacked up within three years.<br />

Example 9.2-4<br />

The pier cap has been deflected 55 mm in a longitudinal<br />

direction during a period of 40 years apparen<br />

tly because of ice loads.<br />

Type of Damage: 202 Movement<br />

Degree of Damage &<br />

Consequences: I C (<strong>for</strong> Piers)<br />

Cause of Damage: 65 Ice impact<br />

Procedures:<br />

Continuous fo llowing up.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions 149


9.2 CONCRETE ELEMENTS<br />

203 De<strong>for</strong>mation of Concrete<br />

Element<br />

The type of damage "De<strong>for</strong>mationy" covers bridge elements which have developed bowing whencompared<br />

to their original shape. They can consequently have been subj ected to additional loads or<br />

now have reduced carrying capacity. The consequence can be pennanent deflection of, <strong>for</strong> example,<br />

the main carrying element or the bridge deck etc.<br />

Cause of Damage<br />

• Design fault - under-designed elements or incorrect assumptions.<br />

• Construct ion fault - settlement of the scaffolding during construct ion; unintentionally applied<br />

loads.<br />

• Loads - overloading due to heavy vehicular loads; too thick an asphalt layer.<br />

• Accident impact - traffic colli sions.<br />

• In-service impacts - c.g. secondal)' damage due to subsidence <strong>for</strong> example.<br />

Possible Measurements<br />

• Levelling.<br />

Degree of Damage & Consequences<br />

De<strong>for</strong>mation of load bearing elements can be an indication of too Iowa carrying capacity or of<br />

overloading.<br />

The degree of damage assigned must be based on the severity of the defonnation and its probable<br />

further development.<br />

So far as continuous span bridges are concerned de<strong>for</strong>mat ion of the superstructure due to subsidence<br />

in abutments/columns will affect carrying capacity . Calculations must be undertaken be<strong>for</strong>e<br />

deciding the degree of damage. In many instances differential subsidence has been taken into<br />

account during the design period and should there<strong>for</strong>e be included in the process of deciding the<br />

degree of damage.<br />

De<strong>for</strong>mation due to subsidence can also affect future maintenance costs since the long-term de<strong>for</strong>mation<br />

of concrete caused by creep will make jacking procedures more difficult.<br />

Carrying capacity will not be affected by subsidence of scaffolding.<br />

Both traffic safety, maintenance costs and the environment can be affected byabnormallong-tenn<br />

de<strong>for</strong>mation due to the bridge's fully laden weight.<br />

150 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


9.2 CONCRETE ELEMENTS<br />

Conditions which trigger Maintenance<br />

When de<strong>for</strong>mation has lead to too Iowa carrying capacity measures must be taken immediately.<br />

Action should also be taken when de<strong>for</strong>mat ion spoils the appearance of a bridge.<br />

Procedures:<br />

* Jacking up and adjustment of the bearings (continuous span bridges)<br />

* Removal of unwanted loads such as asphalt<br />

* Strengthening or reconstruction<br />

* Replacement of elements<br />

Example 9.2-5<br />

Deflection ofa cantili vered slab due to insufficie nt<br />

rein<strong>for</strong>cement/incorrectly installed rein<strong>for</strong>cement.<br />

Type of Damage: 203<br />

De<strong>for</strong>mat ion of Concrete Elemen ts<br />

Degree of Damage &<br />

Consequences:<br />

3C<br />

Cause of Damage: 12<br />

Erroneous calculations<br />

Procedures:<br />

Strengthening within one year<br />

Example 9.2-6<br />

Bowing ora column caused by fonnwork left<br />

behind after completion,resulting in an increase of<br />

the ground pressure on the column.<br />

Type of Damage:<br />

203<br />

De<strong>for</strong>mation of Concrete Element<br />

Degree of Damage & Consequences: 3C<br />

Cause of Damage: 38<br />

Construction fault<br />

62<br />

Soil Pressure<br />

Procedures:<br />

Strengthening of the columns and replacement of<br />

materi als with lighter ones (E PS) within one year.<br />

<strong>Handbook</strong> <strong>for</strong> Bri dge <strong>Inspections</strong> 151


9.2 CONCRETE ELEMENTS<br />

Example 9.2-7<br />

De<strong>for</strong>mation caused by settlement of the scaffolding<br />

during the construction phase; this was subsequent<br />

ly levelled off with asphalt.<br />

Type of Damage: 203<br />

Defomlation of Concrete Element<br />

Degree of Damage &<br />

Consequences:<br />

I B<br />

Cause of Damage:<br />

31 Settl ement<br />

of scaffold ing<br />

Procedu res:<br />

None<br />

152 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions


9.2 CONCRETE ELEMENTS<br />

204 Cracks in Concrete Elements<br />

Description<br />

Thi s category covers all hamlful cracks a nd fi ssures in concrete. Thus cracks in concrete which<br />

have been subject to stress from flexura l or tensile <strong>for</strong>ces are normal. However, these cracks must<br />

fall within certain limits.<br />

<strong>Bridge</strong>s containing pl ai n steel rein<strong>for</strong>cement bars can be subject to large cracks more widely spaced<br />

apart than is the case <strong>for</strong> ribbed rein<strong>for</strong>cement bars. Pre-stressed constructions do not nonnally suffer<br />

from cracking.<br />

Cause of Damage<br />

* Design fault - insufficient reinfo rcement! hi gh tension in the rein<strong>for</strong>cement during in-service<br />

condition.<br />

* Materials fault - an incorrect concrete mixture can produce shrinkage cracks. Aggregates which<br />

react to alkali can there<strong>for</strong>e react with alkali contained in cement and water and in the long tenn<br />

produce an expansion in the volume of the concrete. This can lead in turn to cracks.<br />

'" Construction fau lts - both an inadequate casting process and faulty finishing treatment may cause<br />

cracks during curing, cracks resulting from loss of plasticity, wastage due to dehydration or<br />

cracks caused by the heat of the curing process Itemperature gradients.<br />

'" Inadequate day-to-day maintenance - badly cleaned out joints may result in<br />

un<strong>for</strong>eseen loads.<br />

'" Environmental impact - hostile environment, e.g. cracks caused by chloride induced corrosion on<br />

rein<strong>for</strong>cement.<br />

'" Impacts from traffic, subsidence etc ..<br />

'" Accidental impacts - traffic collisions.<br />

'" In-service impacts - secondary damage.<br />

Possible Measurements<br />

'" Measuring the width and pattem of cracks<br />

'" Removal of concrete specimens, drilling out cores or thin sli cing.<br />

Degree of Damage/Consequences<br />

The degree of damage should be assessed in relation to the location of the cracks, extent, cause,<br />

probable development and the amount of stress the elements have been subjected to. In addition,<br />

climate impact may be of importance here.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 153


9.2 CONCRETE ELEMENTS<br />

Serious cracks and fi ssures can indicate too Iowa carrying capacity. They can also lead to corrosion<br />

of the rein<strong>for</strong>cement which also affects carrying capacity. Cracks or fi ssures pennitting the passage<br />

of dampness will be substantially more dangerous than dry cracks when taking corrosion Qfthe<br />

rein fo rcement into account.<br />

In most cases cracks and fi ssures wi ll be of consequence <strong>for</strong> maintenance costs and also <strong>for</strong> the<br />

environment dependent on their location.<br />

The followi ng rul e of thumb can be used to determine the degree of damage <strong>for</strong> cracks or fissures<br />

which could affect future maintenance costs:<br />

Sli ghtly Aggressive Environment (SAE): Crack/fissure < 0,5 mm 1M<br />

Crack/fissure 0,5· ],0 mm<br />

2M<br />

Crack/fissure > 1,0 mm<br />

3M<br />

Aggressive Environment CAE): Crack/fissure < 0,2 mm 1M<br />

Crack/fissure 0,2-0,5 mm<br />

2M<br />

Crack/fissure > 0,5 mm<br />

3M<br />

Cracks or fi ssures penetrated by dampness must always be assessed as irthey were located in an<br />

aggressive environment. Cracks or fissures in concrete situated in an aggressive environment<br />

should be checked fo r corrosion of the rein <strong>for</strong>cement by cutting away specimens in a few places.<br />

Conditions which Trigger Maintenance<br />

Very often cracks or fissures have been caused by other fonns o r damage such as de<strong>for</strong>mation,<br />

movement, lack of cleaning etc. Measures must be taken against primary damage be<strong>for</strong>e carrying<br />

out procedures fo r cracks and fissures. Similarly measures are required to be taken against cracks<br />

and fi sssures be<strong>for</strong>e other kinds of damage can develop, e.g. corrosion of the rein<strong>for</strong>cemellt, which<br />

can result in reduced carrying capacity and increased maintenance costs.<br />

Procedures<br />

Surface treatment, which provides permanent cover of the cracks/fi ssures.<br />

* Scaling of cracks/fissures<br />

* Injection of cracks/fi ssures<br />

* Strengthening<br />

~ FLEXURAL MOMENT<br />

JTOR510N<br />

"-~-I<br />

I<br />

/ //<br />

SHEARING<br />

!<br />

~L ______ -----1t<br />

CO"" "'""" COAD<br />

Fig1lre showillg diiferelll killlis of cracks!fi.HIIIY!S which call be caused by ex/ernalloalls<br />

154 <strong>Handbook</strong> f or <strong>Bridge</strong> <strong>Inspections</strong>


9.2 CONCRETE ELEMENTS<br />

Plastic Settlement Crack<br />

~~~?f ./<br />

T " A (<br />

If<br />

Crazing<br />

(ratk Caused by Reaction to Alkali<br />

Crack Caused by Thermal COlltraction<br />

(Heat During the Curing Process)<br />

Crack caused by ther al contraction<br />

eat un"g! ecurin9Process",,) ... ",~~<br />

Plastic Settlement Crack<br />

Crazing<br />

Plastic Settlement Crack<br />

Cracks Caused by Corrosion of the Rein<strong>for</strong>cement<br />

Figure showillg examples of differel1l types of c/'Gch 10 be/oulld ill COl/crete bridges.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 155


9.2 CONCRETE ELEMENTS<br />

Example 9.2-8<br />

Cracks on the deck of a suspension bridge caused<br />

by blocked joints. A total collapse is not anticipated.<br />

Refer to Chapter 9.8 <strong>for</strong> joints.<br />

Type of damage: 204<br />

Cracks in Concrete Element<br />

Cause of Damage & Consequences: 3C<br />

Cause of Damage: 44<br />

Inadequate Maintenance<br />

Procedures:<br />

Chi selling out the concrete; casting ornew cross<br />

beams; installation of tight joints. To be carried oul<br />

within one year.<br />

Example 9.2-9<br />

Cracks under a bearing whi ch has been sited too<br />

near the edge.<br />

Type of damage: 204<br />

Cracks in Concrete Element<br />

Cause of Damage & Consequences: 4C<br />

Cause of Damage: 13<br />

Poor Design Solutions<br />

Procedures:<br />

Reli eve pressure on the bearing immediately;<br />

strengthening the bearing shelfwithin a year.<br />

Example 9.2·10<br />

Cracks on a pier caused by a reaction to alkali. The<br />

cracks arc up to I mm wide and located in a aggres·<br />

sive environment.<br />

Type of damage: 204<br />

Cracks in Concrete Element<br />

Cause of Damage & Consequences: 3M<br />

Cause of Damage: 25<br />

A Ikaline reactive Aggregates<br />

Procedures:<br />

Joints above the pi er should be sealed \ ... ·ithin 2<br />

years in order to reduce water leakages down on the<br />

pIer.<br />

156 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions


Example 9.2-11<br />

9.2 CONCRETE ELEMENTS<br />

Cracks on a retaining wall caused by a reaction to<br />

alakali (con finned by structural analysis). De-icing<br />

salt on the pavement is normally not used. The<br />

width of the cracks does not exceed 0.8 mm. The<br />

site is not very accessible, and the public rarely go<br />

there.<br />

Type of damage:<br />

Cracks in Concrete Element<br />

Cause of Damage & Conseq uences:<br />

Cause of Damage:<br />

Alkaline reactive Aggregates<br />

204<br />

2M, IE<br />

25<br />

Procedures:<br />

Surface water should be drained orfand the bridge<br />

deck treated with waterproofing layer. This should<br />

be carri ed out within 5 years.<br />

Example 9.2-12<br />

Cracks in a concrete beam due to bowing. Statical<br />

calculations indicate that there is adequate rein<strong>for</strong>cement.<br />

Type of damage: 204<br />

Cracks in Concrete Element<br />

Cause of Damage & Consequences: 2M<br />

Cause of Damage: 61<br />

Traffi c Loads<br />

Procedures:<br />

Treatment of the surface within 5 years with a coating<br />

of material designed <strong>for</strong> covering cracks.<br />

Example 9.2-13<br />

Crack in a wing wall due to subsidence.<br />

Type of damage: 204<br />

Cracks in Concrete Element<br />

Cause of Damage & Consequences: 2M<br />

Cause of Damage: 82<br />

Consequenti al/Secondary Damage<br />

Procedures:<br />

Follow up by taking levell ing measurements. Once<br />

the subsidence has stopped the cracks can be injection<br />

filled.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions 157


9.2 CONCRETE ELEMENTS<br />

Example 9.2-14<br />

Cracks in the side wa ll of an abutment due to skewed<br />

settlement. There is only minor traffic on the<br />

road. The settlement process has ceased.<br />

Type of damage: 204<br />

CracksIFissures of Concrete Element<br />

Cause of Damage & Consequences: 2.\1<br />

Cause of Damage: 82<br />

Consequential/Secondary Damage<br />

Procedure:<br />

Replace with lighter intil (E PS) together with injecti<br />

on of the cracks within 5 years.<br />

Example 9.2-15<br />

Cracks on lOp ofa pier caused by subsidence of the<br />

abutment. The settlement process has ceased, and<br />

the carrying capacity remains intact.<br />

Type of Damage: 204<br />

Cracks in Concrete Element<br />

Cause of Damage & Consequences: 3.\1<br />

Cause of Damage: 82<br />

ConsequcntiallSecondmy Damage<br />

Procedures:<br />

Cracks to be sealed within one yea.<br />

Example 9.2-16<br />

Settlement crocks which occurred during the casting<br />

process.<br />

Type of Damage: 204<br />

Crocks inConcrete Element<br />

Cause of Damage & Consequences: 3.\1<br />

Cause of Damage: 38<br />

Construction Fault<br />

Procedures:<br />

Seal the crocks within one year.<br />

158 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions


Example 9.2-17<br />

9.2 CONCRETE ELEMENTS<br />

Through cracks in a newly cast bridge deck caused<br />

by the curing temperature when casti ng on to cold<br />

concrete.<br />

Type of damage: 204<br />

Cracks in Concrete Element<br />

Cause of Damage & Consequences: 3M<br />

Cause of Damage: 35<br />

Inadequate curing Procedures<br />

Procedures:<br />

Cracks to be injection filled within onc year.<br />

Example 9.2-18<br />

Dampness and lime precipita tion in a crack on the<br />

underneath orthe deck of a prefabricated footbridge.<br />

None of the cracks exceed 0.7 mm in width.<br />

Type of damage: 204<br />

Cracks in Concrete Element<br />

207<br />

Leakage/Dampness of Concrete<br />

Cause of Damage & Consequences: 3M<br />

Cause of Damage: 67<br />

Shrinkage/creeping<br />

Procedures:<br />

Cracks to be sealed within 2 years.<br />

Example 9.2-19<br />

Lime precipitation in shrinkage cracks in a culvert<br />

due to earlier water penetration which has now<br />

dried out after the lime products closed the cracks;<br />

the leakage then stopped. There is a lot of pedestrian<br />

traffic through this culvert.<br />

Type of damage:<br />

Cracks in Concrete Element<br />

Cause of Damage & Consequences:<br />

Cause of Damage:<br />

Shrinkage/creeping<br />

204<br />

(M,3E<br />

67<br />

Procedures:<br />

The surface of the concrete should be sandblasted<br />

within one year in order to improve its appearance.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 159


9.2 CONCRETE ELEMENTS<br />

205 Ruptures of Concrete Element<br />

Description<br />

Extensive damage to the whole or part of a bridge element, c.g. cracks or areas of broken orf concretc.<br />

Cause of Damage<br />

* Design fault - attention has not been paid to concentrated loads; there is little room <strong>for</strong><br />

expanSion.<br />

* Construction fau lt - post-tensioning be<strong>for</strong>e the concrete had achieved its prescribed fi rmness can<br />

lead to rupture.<br />

* Insufficient day-to day maintenance.<br />

* Impacts from traffic, ground pressure and the li ke.<br />

* Accidents - e.g. traffic impacts.<br />

* In-service damage - e.g. secondary damage.<br />

Degree of Damage/ Conseq uences<br />

The degree of damage should be assessed based on its location, size and probable development. A<br />

high degree of damage shou ld be allocated to load bearing elements.<br />

For load bearing elements, ruptures will affect the carrying capacity. Regarding non-load bearing<br />

elements, a rupture may affect traffic safety, future maintenance costs and/or the environment.<br />

Conditions which trigger Maintenance<br />

Immediate acti on must be taken if the bridge's canying capacity is to low or traffic safety has been<br />

reduced.<br />

If the damage has affected maintenance costs, acti on should be taken be<strong>for</strong>e other damage leading<br />

to increased maintenance costs develops.<br />

Procedures<br />

* Mechanical repairs<br />

* Replacement<br />

* Strengthening.<br />

160 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions


Example 9.2-20<br />

9.2 CONCRETE ELEMENTS<br />

Broken cross-beam Of sllspcnsion bridge resulting<br />

from blockedjoint .<br />

Type of Damage: 205<br />

Ruptures of Concrete El ement<br />

Degree of Damage ICon sequences: 3C<br />

Cause of Damage: 82<br />

Consequential/Secondary Damage<br />

Procedures:<br />

Existing cross-beam to be CUi away and replaced<br />

within onc year.<br />

Exam ple 9.2-21<br />

Broken beam res ulting from a traffic accident.<br />

Reduced carrying capaci ty as well as the ri sk of<br />

pieces of concrete fall ing off.<br />

Type of Damage: 205<br />

Ruptures of Concrete El ement<br />

Degree of Damage & Consequences: 4C, 4T<br />

Cause of Damage: 71<br />

Vehicular Impaci Damage<br />

Procedures:<br />

<strong>Bridge</strong> to be closed to traffi c until repairs effected.<br />

Example 9.2-22<br />

Broken ba llast wall due to movement in an abut ­<br />

ment caused by ground prcssurc.<br />

Type of Damage: 205<br />

Rupture of Concrete Element<br />

Degree of Damage & Consequences: 2M<br />

Causc ofDamagc: 62<br />

Soi I Pressure<br />

82<br />

Consequential/Secondary Damage<br />

Pr ocedures:<br />

Replace with lighter in fi ll materials (EPS) and<br />

effect repairs to the ballast wall within 5 years.<br />

<strong>Handbook</strong> <strong>for</strong> Bri dge Inspect ions 161


9.2 CONCRETE ELEMENTS<br />

206 Damage to Concrete Surface<br />

Treatment<br />

Descri ption<br />

Damage to the surface treatment of concrete bridge elements, i.c. water repellent impregnation,<br />

painting/coating, whitewashing/pore filling. Flaking, cracking, bli stering, and discoloration can be<br />

incl uded here; additionally, the surface treatment might not fu lftl lhe required in-service standards.<br />

Surface treatment applied to concrete must be able to protect the concrete from environmental<br />

impacts and improve its general appearance.<br />

Cause of Damage<br />

• Design Fault - incorrect type of surface treatment chosen.<br />

• Material Fault - incorrect type of surface treatment applied.<br />

• Construction Fault - poor pre-treatment of the surface, or the material was appl ied during damp<br />

or cold weather.<br />

• Insufficient operation/maintenance of the surface treatment.<br />

• Environmental impacts - a hosti le environment can break down the surface treatment faster than<br />

expected<br />

• In-service damage - regul ar wear and tear.<br />

Possible Materials Testing<br />

• Thickness of the surface treatment<br />

• Adhesion between the surface layer and concrete.<br />

• Impregnation depth to concrete of repellent impregnation.<br />

• Measuring chloride content and depth of carbonisation.<br />

Degree of Damage/Consequences<br />

All types of surface treatment gradually become broken down by the environmental influence. The<br />

degree of damage a ll ocated shall reflect the time remaining be<strong>for</strong>e the surface treatment requires<br />

renewal, i.e. be<strong>for</strong>e it loses its protective properties. Damage to the surface treatment wi ll affect<br />

maintenance costs and result in increased chl oride penetration and speed of development of carbonisation.<br />

These last two items can, in addition, lead to corrosion of the rein<strong>for</strong>cement and to spalling.<br />

162 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong>


9.2 CONCRETE ELEMENTS<br />

If the damage is extensive and/or the surface treatment has lost its protective qualities, a new layer<br />

of surface treatment must be appl ied. When the damage is minor, action need only be taken be<strong>for</strong>e<br />

any other types of damage develope and be<strong>for</strong>e the damage becomes so extensive that the enticre<br />

surface treatment has to be renewed.<br />

Conditions which trigger Maintenance<br />

Procedures:<br />

. Regular cleaning and renewal orthe surface treatment<br />

. Removal orthe existing treatment and the application ora new coating.<br />

Example 9.2-23<br />

Localised spall ing of the surface treatment ofa<br />

concrete parapet.<br />

Type of Damage: 206<br />

Damage to the Concrete Surface Treatment<br />

Degree of Damagei<br />

Consequences:<br />

Cause of Damage:<br />

Construction Fault<br />

3M, 2E<br />

38<br />

Procedures:<br />

Maintenance measures to be taken within three<br />

years <strong>for</strong> damaged surface treatment.<br />

Example 9.2-24<br />

Surface treatment damaged by wind and weather.<br />

This bridge has been greatl y subjected to chl oride<br />

attack, and the surface treatment has no longer any<br />

of its protective qualit ies. The appearance o f the<br />

bridge can hardly be described as attmctive.<br />

Type of Damage: 206<br />

Damage to the Concrete Surface Treatment<br />

Degree of Damage/<br />

Consequences:<br />

Cause of Damage:<br />

Inadequate Maintenance<br />

Normal Wear and Tear<br />

3M, 3E<br />

44<br />

81<br />

Procedures:<br />

The ent ire surface treatment should be removed and<br />

renewed within three years.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> <strong>Inspections</strong> 163


9.2 CONCRETE ELEMENTS<br />

207 LeakagesJ1)ampness of<br />

Concrete<br />

Description<br />

This covers water seeping through cracks, leakage between prefabricated concrete elements and/or<br />

dampness attack resulting fro m leaks or fa iled attention to detai ls. Leakages Idampncss attacks can<br />

produce corrosion orthe rein<strong>for</strong>cement and spall ing to the covering. Leakage leads to discoloration<br />

of the concrete (lime deposits on the surface).<br />

Cause of Damage<br />

* Design Fault - unsuccessful design causing leakage/dampness ..<br />

* Material Fault - incorrect composition of the concrete can lead to porosity so that the concrete is<br />

not water resistant.<br />

* Construction Fault - concrete has nol been correctly vibrated which has resulted in porosity.<br />

* Depressions cause insufficient drainage of water and the risk ofleakage and dampness attacks.<br />

* Insufficient day· to-day operation/or maintenance.<br />

* In-service damage, e.g. secondary damage.<br />

Degree of Damage/Consequences<br />

The degree of damage should be selected depending on the age of the bridge, the extent of the lea·<br />

kage/dampness impact and the speed at which other damage can develop.<br />

Leakage/dampness impact can affect maintenance costs and/or traffic safety in so far as icicles and<br />

icy road surfaces can <strong>for</strong>m in winter.<br />

Conditions which Trigger Maintenance Measures<br />

Measures should be taken to stop leakage/dampness impact be<strong>for</strong>e the risk arises of other damage<br />

develop ing such as corrosion oflhe re in<strong>for</strong>cement and spalling. If, fo r example, reduced traffic<br />

safety or icy sections can result from leakage/dampness impact, then immediate action must be<br />

taken.<br />

Procedures<br />

* Sealing, injection fill ing<br />

* Alteration to the water drainage system<br />

* Mechanical repairs to the concrete<br />

* Installation of new waterproofing layer on the bridge deck.<br />

164 <strong>Handbook</strong> <strong>for</strong> Bri dge Inspect ions


Example 9.2-25<br />

9.2 CONCRETE ELEMENTS<br />

Leakage through joints between concrete elements<br />

because ofinadequalc seal ing ca using a dampness<br />

attack on the underside orthe bridge.<br />

The elements are prestressed and there<strong>for</strong>e particularly<br />

vulnerable to corrosion of the rein<strong>for</strong>cement.<br />

The bridge deck has been exposed to de-icing salt.<br />

Type of Damage: 207<br />

LeakagelDampness of Concrete<br />

Degree of Damage &<br />

Consequences:<br />

3M<br />

Cause of Damage: 38<br />

Construction Fault<br />

Procedures:<br />

In sta llation ornew waterproofing layer on the bridge<br />

deck within one year<br />

Example 9.2-26<br />

Leakage through joints between the clements of a<br />

pedestrian culvert because of inadequate seal ing.<br />

Type of Damage:<br />

Lcakage/Dampncss of Concrete<br />

Degree of Damage &<br />

Conseq uences:<br />

Cause of Damage:<br />

Construction Fault<br />

207<br />

3T, 2M<br />

38<br />

Procedures:<br />

The joints should be sealed within three years.<br />

Example 9.2-27<br />

Serious leakage in the region of a power cable duct.<br />

There is a pathway under the bridge.<br />

Type of Damage: 207<br />

Leakage/Dampness of Concrete<br />

208<br />

Di scoloration of Concrete Element<br />

Degree of Damage ICon sequences: 2M, 2E<br />

Cause of Damage : 38<br />

Construction Fault<br />

Procedures:<br />

Leakage to be sealed within five years.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions 165


9.2 CONCRETE ELEMENTS<br />

Example 9.2-28<br />

Leakage through the bridge deck over a small ,<br />

badl y cast area. The bridge is approx imately 30<br />

years old and has not been salted.<br />

Type of Damage: 207<br />

Leakage/Dampness of Concrete<br />

211<br />

Honeycombing<br />

Degree ofDamagc/Consequcnces: 2M<br />

Cause of Damage: 38<br />

Construction Fault<br />

Procedures:<br />

Installation of new waterproofing layer and wearing<br />

course within five years<br />

Example 9.2-29<br />

Dampness and li me deposits on the underside of the<br />

bridge deck indicate the existence of<br />

leakages/dampness impact <strong>for</strong> some time. Both the<br />

wearing surface and the membrane are worn<br />

through.<br />

Type of Damage: 207<br />

Leakage/Dampness of Concrete<br />

Degree ofDamagc/Conscqucnces: 2M<br />

Cause of Damage: 82<br />

Conseq uentiaVSccondary Damage<br />

Procedures:<br />

Installation of new waterproofing layer and wea~<br />

ring course within five years.<br />

Example 9.2-30<br />

Leakage between cross ~ beams has been caused by<br />

porous concrete and leaky joints directly above the<br />

c ross~beams. The water has worn away the surface<br />

treatment of the steel.<br />

Type of Damage: 207<br />

Leakage/dampness of Concrete Element<br />

Degree of Da mage & Consequences: 3M<br />

Cause of Damage:<br />

II<br />

Incorrect Choice of Materials 38<br />

Construction Fault<br />

Procedures:<br />

No action is required <strong>for</strong> the concrete cross~beams.<br />

The joints, however, must be cleaned out and sealed<br />

within three years. In addition, the steel elements<br />

should be painted.<br />

166 <strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions


9.2 CONCRETE ELEMENTS<br />

Example 9.2-31<br />

Leakage through the bridge deck made of very<br />

poor, porous concrete has resulted in severe corrosion<br />

orthe re in fo rcement, spalling and crumbling<br />

concrete.<br />

Type of Damage: 207<br />

Leakage/Dampness of Concrete<br />

209<br />

Insufficien t/damaged covering<br />

210<br />

213<br />

Spalling of Concrete Element<br />

214<br />

Corrosion of the Rein<strong>for</strong>cement<br />

Degree of Damage/Consequences: 3C<br />

Cause of Damage: 38<br />

Construction Fault<br />

Procedures:<br />

Rebui lding ofhridge deck within I year.<br />

Example 9.2-32<br />

Leakage through the cast-joints of a retaining wall<br />

leads to weathering orthe concrete. The retaining<br />

wall is located adjacent and parallell to the road.<br />

Type of Damage: 207<br />

Leakage/Dampness of Concrete<br />

208<br />

Di scoloration of Concrete Element<br />

210<br />

Weathering of Concrete<br />

Degree of Damage/Consequences: 1 C, 2M, 3E<br />

Cause of Damage: 38<br />

Construction Fault<br />

Procedures:<br />

Inj ection filling of the cast joints, and cleaning<br />

up/treatment of the surface material within three<br />

years.<br />

<strong>Handbook</strong> <strong>for</strong> <strong>Bridge</strong> Inspect ions 167