General Assembly - UNIDIR
General Assembly - UNIDIR
General Assembly - UNIDIR
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A/56/359<br />
2001 a 2002 a Increase/<br />
1999 2000 (estimates) (estimates) decrease<br />
Resource requirements (1) (2) (3) (4) (4-3)<br />
B. Programme support costs<br />
(5% of total A, less United<br />
Nations subvention) 22.7 e 41.5 52.7 46.7 (6.0)<br />
Total expenditure<br />
(total A + B) 902.4 1 085.2 1 320.5 1 193.9 (126.6)<br />
C. Operating cash reserve<br />
(At least 15% of total A,<br />
less United Nations<br />
subvention) 100.0 130.8 158.2 140.1 (18.1)<br />
Grand total A + B + C 1 002.4 1 216.0 1 478.7 1 334.0 (144.7)<br />
a These figures may be increased upon confirmation of current funding proposals.<br />
b Part of the 2000 salaries and related staff costs have been charged in 2001.<br />
c Includes part of the 2000 salaries and related staff costs. Based on standard salary costs for<br />
2000 — version 13, applicable to Geneva.<br />
d Based on standard salary costs for 2001 — version 13, applicable to Geneva.<br />
e Takes into account the reversal of miscalculation in programme support costs in 1998<br />
($10,800).<br />
18