<strong>Drainage</strong> <strong>Design</strong> <strong>Manual</strong> for Maricopa County<br />

<strong>Hydrology</strong>: Rainfall<br />

drainage areas in Maricopa County, the local storm will produce both the largest flood peak discharge<br />

and the greatest run<strong>of</strong>f volume. Based on a review <strong>of</strong> meteorologic studies for Arizona<br />

(U.S. Army Corps <strong>of</strong> Engineers, 1974 and 1982a) and a consideration <strong>of</strong> severe storms in Maricopa<br />

County, it was determined that the 6-hour local storm should be used as the design storm<br />

criteria for watersheds in Maricopa County with drainage areas <strong>of</strong> 20 square miles and less.<br />

The 6-hour local storm for watersheds between 20 and 100 square miles may be the required<br />

design storm criteria, as discussed below. The general design storm for watershed areas<br />

between 20 and 500 square miles is the 24-hour storm.<br />

For drainage areas between the critical flood-producing upper limit for local storms (100 square<br />

miles) and the lower limit for general storms (20 square miles), it cannot be determined whether a<br />

local storm or a general storm will produce the greatest flood peak discharges or the maximum<br />

flood volumes. For such drainage areas, generally between 20 and 100 square miles, it is necessary<br />

to consider both general storms and local storms. This may require that site-specific general<br />

storm criteria be developed for the watershed and that various local storms with critical storm<br />

centering assumptions be developed using the criteria in this manual. Both <strong>of</strong> these storm types<br />

would be modeled and executed in the watershed model to estimate flood discharges and run<strong>of</strong>f<br />

volumes. It is possible, in certain situations, that the local storm could result in the largest peak<br />

discharge and that the general storm could result in the largest run<strong>of</strong>f volume.<br />

The <strong>Drainage</strong> Policies and Standards for Maricopa County stipulates that the 100-year, 2-hour<br />

rainfall be used for the design <strong>of</strong> stormwater storage facilities. As such, criteria are provided in<br />

this manual to define the 100-year, 2-hour rainfall for use in Maricopa County.<br />

Record floods for large drainage areas, similar to the Salt River Watershed near Phoenix, were<br />

produced by large-scale general storms <strong>of</strong> multiple-day duration and relatively low rainfall intensities.<br />

Therefore, based on that observation, for drainage areas larger than 500 square miles it<br />

was determined that the general storm should be used as the design storm criteria. Because <strong>of</strong><br />

the complexity <strong>of</strong> design criteria for such large areas as well as other considerations, design rainfall<br />

criteria are not defined in this manual. General storm criteria are to be defined for such large,<br />

regional flood studies on a case-by-case basis so that the most appropriate meteorologic and<br />

hydrologic factors (possibly also including snowmelt for stream baseflow and watershed antecedent<br />

moisture conditions) can be properly considered in the flood analysis.<br />

The design rainfall criteria to be used in the unincorporated areas <strong>of</strong> Maricopa County are summarized<br />

in the <strong>Drainage</strong> Policies and Standards for Maricopa County. The specific procedures<br />

that are needed to define the design rainfall for the 100-year, 2-hour storm, the 6-hour local storm<br />

and the 24-hour general storm are provided in the following sections. Refer to the Policies and<br />

Standards manual <strong>of</strong> the municipality for design rainfall criteria in the incorporated areas <strong>of</strong> Maricopa<br />

County.<br />

August 15, 2013 2-3