July archive edition - Saratoga Bridges
July archive edition - Saratoga Bridges
July archive edition - Saratoga Bridges
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Mangino auto Dealership’s New Building<br />
Will Have More Customer Service Features<br />
<strong>Saratoga</strong> BUSINESS JoUrNaL • JULy 2013 • 11<br />
Esplanade Luxury apartments<br />
Continued From Page 1<br />
Mangino Buick GMC is building a facility with improvements for customers and employees<br />
and, once occupied, it will tear down the building it has used for more than 40 years.<br />
BY PAMELA FISHEr<br />
Mangino Buick GMC, located at 1484 <strong>Saratoga</strong><br />
road in Ballston Spa, is changing its dealership<br />
and will be building an entirely new structure with<br />
an updated showroom, service area and modernized<br />
services for its customers.<br />
This is the second renovation for the familyowned<br />
business, following the gutting and remodeling<br />
of the Mangino Chevrolet site in Amsterdam.<br />
The general contractor for both projects is JAG<br />
Construction Inc. in Queensbury.<br />
The dealership is making upgrades as required<br />
by General Motors. The auto maker issued a<br />
restructuring plan to all locations, calling for the<br />
same design and specifications from site to site.<br />
In conjunction with the plan, ralph Mangino,<br />
manager of the Ballston Spa site, said the time<br />
was right to modernize the building.<br />
Stock Studios Photography<br />
“We are tearing down our old building that<br />
has been here for more than 40 years and we are<br />
putting up a new state-of-the-art facility,” said<br />
Mangino. “Though it has served us very well, our<br />
building has become dated.”<br />
Mangino said the upgrades have been well<br />
received in Amsterdam, and will provide greater<br />
comfort and amenities for customers, including<br />
a modernized service area.<br />
“They will be able to drive right up and not get<br />
out of their cars. There is going to be a nice, new<br />
waiting area with Wi-Fi and a flatscreen television.<br />
Customers are going to be able to pick up brand<br />
new cars inside so the weather is not going to be<br />
an issue anymore.”<br />
Mangino said the service department is receiving<br />
the first updates, and despite construction,<br />
Continued On Page 13<br />
The Esplanade luxury apartment complex in Mechanicville, shown in this architect’s<br />
rendering, will include a Riverwalk boardwalk along the Hudson River.<br />
by pergolas and fireplaces and will connect to<br />
an outdoor pool and bath house.<br />
The riverwalk will also connect to biking<br />
and hiking paths. A nearby reflecting pool and<br />
fountain will convert into a skating rink in the<br />
winter, making the area the center of activity<br />
even in the winter.<br />
Many of the residential units will also look<br />
out to the Hudson. The project will offer apartments<br />
with one, two, and three bedrooms,<br />
and will be between 641 to 1,700 square feet,<br />
designed around an open kitchen and living<br />
room. Many will also have a balcony or terrace.<br />
Apartments will feature the latest technical<br />
advances in construction, with wireless internet<br />
service throughout.<br />
“The Esplanade will be geared, in large<br />
part, to accommodate the recent growth in<br />
Courtesy Eastview Development<br />
employment in <strong>Saratoga</strong> and Albany counties,<br />
in particular those working for GlobalFoundries,”<br />
kohn said.<br />
The Esplanade is five miles from Luther<br />
Forest Technology Park in Malta.<br />
Location of the complex will be another<br />
plus for both its residents and the city of<br />
Mechanicville, he said. residents will have the<br />
convenience of a supermarket and other shopping<br />
just across the street, while downtown<br />
merchants will have the potential of hundreds<br />
of new customers.<br />
Ground for The Esplanade was broken in<br />
the spring and construction is ongoing. It is<br />
expected to be completed late next year.<br />
For more information on The Esplanade,<br />
contact kohn at (917) 930-1327, or visit<br />
www. Eastviewdev.com.