Site EILs<br />

(mg/kg)<br />

Depth (m) Cu Zn Ni CrIII<br />

0-1 205 465 50 410<br />

1-2 200 610 85 410<br />

Phase 2 Tier 1 ecological risk assessment<br />

Site metal <strong>levels</strong><br />

Depth (m) Cu Zn Ni CrIII<br />

0-1 540 890 660 1100<br />

1-2 170 470 380 400<br />

Questi<strong>on</strong>s<br />

Are results greater than EILs ? YES , Cu, Zn, Ni and CrIII exceed EILs - further ERA or<br />

management required.<br />

Depth (m) Cu Zn Ni CrIII<br />

0-1 Y Y Y Y<br />

1-2 N N Y N<br />

Note: Y indicates site EIL exceeded, N indicates EIL not exceeded.<br />

Outcome<br />

Results of Tier 1 assessment show exceedances of the HIL <strong>for</strong> Ni and<br />

EILs <strong>for</strong> Cu, Zn, Ni and CrIII and will in<strong>for</strong>m further assessment or<br />

management acti<strong>on</strong>s.<br />

3.5.1 Minor exceedance of investigati<strong>on</strong> <strong>levels</strong><br />

In cases of minor exceedance of investigati<strong>on</strong> or screening <strong>levels</strong>, a qualitative risk<br />

assessment may be sufficient. Case study 1 provides an example of a minor exceedance<br />

where qualitative assessment of the extent and depth of c<strong>on</strong>taminati<strong>on</strong> <strong>for</strong> the proposed land<br />

use may be c<strong>on</strong>sidered. A qualitative or quantitative risk assessment may lead to no further<br />

acti<strong>on</strong> being required or the development of site-specific resp<strong>on</strong>se <strong>levels</strong> generated by risk<br />

assessment and agreed to in c<strong>on</strong>sultati<strong>on</strong> between the professi<strong>on</strong>als assessing the site,<br />

auditors, third party reviewers and/or the regulatory authorities.<br />

In additi<strong>on</strong>, appropriate investigati<strong>on</strong>, screening and/or resp<strong>on</strong>se <strong>levels</strong> need to be<br />

developed when:<br />

• investigati<strong>on</strong> or screening values are not available <strong>for</strong> c<strong>on</strong>taminants of c<strong>on</strong>cern and/or<br />

data are not available to enable the derivati<strong>on</strong> of guideline values<br />

• site c<strong>on</strong>diti<strong>on</strong>s, receptors and/or exposure pathways differ significantly from those<br />

assumed in the derivati<strong>on</strong>s of investigati<strong>on</strong> or screening <strong>levels</strong>.<br />

Where <strong>soil</strong> c<strong>on</strong>centrati<strong>on</strong>s exceed the site-specific resp<strong>on</strong>se <strong>levels</strong>, resp<strong>on</strong>ses may range from<br />

in<strong>for</strong>ming landowners and users about the nature of c<strong>on</strong>taminati<strong>on</strong> and applying<br />

appropriate site management plans, to large-scale remediati<strong>on</strong>. The nature of the resp<strong>on</strong>se<br />

must be determined <strong>on</strong> a site-specific basis.<br />