26.10.2014 Views

EUROPEAN METROPOLITAN TRANSPORT AUTHORITIES ... - EMTA

EUROPEAN METROPOLITAN TRANSPORT AUTHORITIES ... - EMTA

EUROPEAN METROPOLITAN TRANSPORT AUTHORITIES ... - EMTA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

On Passenger Rights<br />

Background:<br />

DG-MOVE launched a study on passenger rights in urban public transport early this year running<br />

until September 2012. The contracted consultancy firm Grimaldi E Associati is investigating the<br />

state-of-the-art in the field as well as the possible charters and/or service guaranties that public<br />

transport systems offer.<br />

A questionnaire has been drafted. Thanks to UITP EuroTeam, the information has been circulated.<br />

UITP also drafted a response. The questionnaire targeted two sectors: the transport operators and<br />

the transport users’ association.<br />

<strong>EMTA</strong> thinks that some key actors have been overlooked in the process and namely the Transport<br />

Authorities. The subject of Passenger Rights in Urban Transport is an on-going concern for <strong>EMTA</strong><br />

who organised in the Spring 2010 in Budapest a hearing with the participation of the European<br />

Passenger Federation EPF and the European Centre of Employers and Enterprises providing public<br />

services CEEP.<br />

The conclusions of the debate have been published and sent to the European Parliament TRAN<br />

Committee and the European Commission DG-MOVE in May 2010.<br />

<strong>EMTA</strong> is pleased to share again with DG-MOVE and the Consultancy firm Grimaldi E Associati “The<br />

Conclusions after passenger rights hearing15-16 April 2010” (see Annex I)<br />

************<br />

On Revisiting the 4 th railway package with possible impact on Regulation 1370/2007<br />

Background:<br />

The European Commission (EC) DG-MOVE organized a Conference on the PSO Regulation<br />

1370/2007 last November 14 2011 presenting the results of a survey conducted by the<br />

Consultancy firm DLA-Piper through the years 2010-2011 on the implementation of the<br />

Regulation.<br />

The survey pointed out several difficulties assorted with remarks and possible ways of solving.<br />

Following this Conference, and the conclusions of the survey, and taking advantage of preparing<br />

the ground for the revision of the 4th Railway Package tentatively scheduled to be issued in the<br />

Autumn 2012 and including several regulatory issues, DG-MOVE is considering including revisiting<br />

the PSO 1370/2007 Regulation, and to start with, Article 5.6 (see below) that defines the<br />

awarding scheme for railway transport contracts (Article 5.6 concerns regional and suburban<br />

trains. Metro and tram contracts are excluded).<br />

<strong>EMTA</strong> is organising a round table during its Spring 2012 General Assembly in Prague 24-25 May<br />

with the participation of the DG-MOVE Unit A5 Infringements and Legal matters to debate on the<br />

impact of the review of he 4 th Railway package on the implementation of the Regulation<br />

1370/2007.<br />

The conclusions of the round table will be drafted and forwarded to the DG-MOVE and the<br />

European parliament TRAN Committee.<br />

************<br />

<strong>EUROPEAN</strong> <strong>METROPOLITAN</strong> <strong>TRANSPORT</strong> <strong>AUTHORITIES</strong><br />

c/o S.T.I.F 41, rue de Châteaudun F-75009 Paris, FRANCE<br />

Tel : +33 (0) 1 53 59 21 00 – Fax : + 33 (0) 1 53 59 21 33 – e-mail : contact@emta.com<br />

http://www.emta.com<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!