Effective January 2, 1979 Town Ordinance 4.02 created a Water and Sewer Commission for the Town of <strong>East</strong><br />

<strong>Hampton</strong>, which is designated as the Water Pollution Control Authority. The Authority is responsible for the<br />

operation of the Town’s water and wastewater systems under Chapter 102 and 103 of the Regulations of<br />

<strong>Connecticut</strong> State Agencies. The Water Pollution Control Authority is a seven member board which meets every<br />

first Tuesday of the month.<br />

In 1978, an inter-municipal agreement between <strong>East</strong> <strong>Hampton</strong> and Colchester (Joint Facilities)<br />

was entered into which governed the construction and operation of the Joint Facilities Water Pollution Control<br />

Plant located in <strong>East</strong> <strong>Hampton</strong>. This wastewater treatment facility originally was intended for the public<br />

sewerage needs of <strong>East</strong> <strong>Hampton</strong> and Colchester and was designed to process an average daily flow of 3.9<br />

million gallons. Final design approval from the <strong>Connecticut</strong> Department of Environmental Protection (<strong>CT</strong>DEP)<br />

allowed for future expansion capabilities to 7.0 mgd in order to regionalize the area by including portions of<br />

the towns of <strong>East</strong> Haddam, Lebanon, Marlborough and Hebron. Currently parts of <strong>East</strong> <strong>Hampton</strong>, Colchester<br />

and Hebron are being served. In 2006, the <strong>CT</strong>DEP approved the request of the Joint Facilities to add the eastern<br />

portion of Portland to the planning area. In 2009, Marlborough will be completing a major wastewater project<br />

to connect its central business district and surrounding areas of Lake Terramuggus. The treatment process<br />

utilizes an activated sludge system to remove approximately 90% of the major pollutants and for over 25 years<br />

this system has faithfully accommodated the needs of the served communities.<br />

To keep the waters of the state clean the Joint Facilities consists of the Public Utilities Administrator, a<br />

Superintendent, a staff of five certified wastewater operators, one laboratory technician and one fulltime and<br />

one part-time office staff. In addition to operating the wastewater treatment plant and collections systems in<br />

Colchester and <strong>East</strong> <strong>Hampton</strong> the Joint Facilities also provides contract services to Hebron and in 2009 the Town<br />

of Marlborough. In the Town of <strong>East</strong> <strong>Hampton</strong> the WPCA is directly responsible for over 34 miles of collection<br />

system and 20 lift stations. The <strong>East</strong> <strong>Hampton</strong> WPCA operating budget ending June 30, 2009 was<br />

$964,676.00, which included $620,239.00 as <strong>East</strong> <strong>Hampton</strong>’s share of the Joint Faculties budget.<br />

Users of the <strong>East</strong> <strong>Hampton</strong> wastewater system currently pay $270.00 per Equivalent Dwelling Unit (EDU) for the annual<br />

use of the system. Users that have a grinder pump that is maintained by the WPCA pay an additional $80.00 per year.<br />

Based upon the population served this user rate is at the median of a 16 town average. Pursuant to regulations established<br />

by the State Department of Environmental Protection (<strong>CT</strong>DEP) the WPCA operates under an “<br />

” i.e. all fees<br />

paid by the users of the system must be used for the operations and maintenance of the wastewater system. There is no<br />

Town tax revenue used for the operations or maintenance of the wastewater system.<br />

In 2002 the Commissioner of the Department of Environmental Protection ordered that a Facility Planning Study be<br />

commissioned to investigate the improvements necessary at the Joint Facilities Water Pollution Control Plant and collection<br />

systems within the Towns. This study was necessary in order to achieve future State and Federal water quality goals while<br />

providing for expected future growth within the wastewater service areas of a seven (7) town region as portions of the east<br />

side of Portland were added to the regional plan. In June of 2005 the Joint Facilities submitted its’ Facility Plan to the DEP<br />

containing $25,000,000.00 of wastewater improvements for the next 20 years. The plan is under review by the <strong>CT</strong>DEP.<br />

Although development in the Town has slowed, the WPCA completed one of the largest infrastructure projects since the<br />

wastewater system was built with the addition of the Marlborough Wastewater system. This 225,000 gallon per day project<br />

was conceived in 2002 and provided the Town a unique opportunity to provide wastewater service to the Town’s Design<br />

Development Zone (DDZ) along Route 66. By designing a collection system that took advantage of the work the Town of<br />

Marlborough was performing in <strong>East</strong> <strong>Hampton</strong>, the WPCA installed multiple piping to accommodate the DDZ. These three<br />

wastewater collection systems were installed in the one trench allowing the Town’s DDZ to be served at a fraction of the<br />

cost. All funding for this project was generated thru the WPCA, no tax dollars were used.<br />

24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!