30.10.2014 Views

Active Procurement Contracts - Empire State Development - New ...

Active Procurement Contracts - Empire State Development - New ...

Active Procurement Contracts - Empire State Development - New ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Nixon Peabody LLP 212 12/20/01 1,441,700 1,324,012 117,688<br />

Sentry Hospitality 1815 11/19/03 4,759,000 3,501,712 1,257,288<br />

Seneca Niagara Falls Gaming 2407 04/04/01 99,800 86,800 13,000<br />

Wendel Duchscherer Architects 2510 10/27/04 412,060 405,288 6,772<br />

Cannon Design 2523 11/03/04 80,000 48,058 31,942<br />

Didonato Associates 3489 02/01/06 592,957 381,897 211,060<br />

Mid City Office Equipment 3782 06/16/06 17,037 12,102 4,935<br />

Cayuga Piping 3814 06/30/06 117,000 86,159 30,841<br />

Christa Construction LLC. 3870 07/19/06 260,000 192,754 67,246<br />

Tunney Electric, Inc. 3935 08/14/06 92,190 78,582 13,608<br />

Clarin Div. of Greenwich Industries LP. 4226 12/01/06 225,748 225,317 430<br />

Legal counsel with respect to real estate development including<br />

condemnation matters related to the re-development of Downtown<br />

Niagara Falls.<br />

Management agreement to operate USA's Niagara owned<br />

Convention and Conference Center located at 101 Old Falls Street<br />

in Niagara Falls.<br />

Lease rental for USA Niagara's office located at 345 3rd Street in<br />

Niagara Falls.<br />

Construction Administration for landscape architectural and design<br />

services related to the re-development of the portion of Third Street.<br />

Additional urban re-development design studies on five parcels<br />

within Niagara Falls <strong>Empire</strong> Zone.<br />

Engineering/Landscape and architectural urban design services<br />

relating to the Downtown Niagara Falls Entertainment District phase<br />

II Project.<br />

Provide labor to install furniture and planters for Conference Center<br />

Dining Room.<br />

Provide removal of existing HVAC rooftop unit and installation of<br />

new rooftop unit in connection to the Conference Center Niagara<br />

Falls.<br />

Provide all interior general trades work, including selective<br />

demolition, cold-formed metal framing, woodwork and insulation for<br />

the Conference Center Niagara Falls.<br />

Provide electrical work for the renovation of the dining room in<br />

connection with the Conference Center Niagara Falls Project.<br />

Provide furniture and equipment for the Conference Center Dining<br />

Room.<br />

TOTAL - NIAGARA DEVELOPMENT 15 10,803,325 8,968,378 1,834,947<br />

CONTRACTS BEING ROUTED AND OR BOARD APPROVED - USA NIAGARA<br />

Various Vendors 7,500,000<br />

Cannon Design 2523 76,950<br />

M&T Bank 671,990<br />

Nixon Peabody LLP 212 500,000<br />

Sub-total 4 1,248,940<br />

Litigation expenses related to USA Niagara's acquisition and<br />

operation of the Niagara Falls Convention Center.<br />

Amendment - Four (4) additional improvements to the Conference<br />

Center, including redesign of elevation, rooftop mechanical wall,<br />

entry doors and mechanical design for retail space.<br />

Acquisition of existing leased machinery and equipment, by USA<br />

Niagara, for the Niagara Falls Convention Center.<br />

Amendment - Legal counsel with respect to real estate<br />

development including condemnation matters in connection with the<br />

re-development of Downtown Niagara Falls.<br />

BKLYN BRIDGE PARK<br />

Total contracts and or board approved 12,052,265 8,968,378 1,834,947

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!