P3 2009 Pavement <strong>Perform<strong>an</strong>ce</strong> Prediction Symposium: July 15-17, 2009, Laramie, Wyoming<br />

Pavement Instrumentation Response<br />

• FWD conducted on top <strong>of</strong> each earth pressure<br />

cell after construction<br />

– Structural <strong>an</strong>alyses performed using KENPAVE (calculated)<br />

– Pressure cell nearest to the loading surface shows the best<br />

agreement with the calculated values<br />

– Difference between measured <strong><strong>an</strong>d</strong> calculated values could be<br />

attributed to the major assumptions <strong>of</strong> elastic theory used by<br />

KENPAVE (e.g., all layers are assumed to be infinite, static load,<br />

etc.)<br />

Stress (psi)<br />

Pressure Cell<br />

Location<br />

Natural<br />

Subgrade<br />

Stabilized<br />

Subgrade<br />

Aggregate<br />

Base<br />

Load (lbs.)<br />

Measured<br />

Calculated<br />

Percent<br />

Difference<br />

6,000 1.1 2.6 131<br />

9,000 1.5 3.8 162<br />

12,000 2.2 5.1 133<br />

15,000 3.1 6.4 104<br />

6,000 3.7 4.9 34<br />

9,000 4.5 7.4 63<br />

12,000 6.4 9.8 54<br />

15,000 8.5 12.3 45<br />

6,000 9.1 9.5 4<br />

9,000 11.6 14.2 22<br />

12,000 17.3 18.9 9<br />

15,000 22.6 23.6 5