04.11.2014 Views

Neptune Caisson Pump [PDF] - Blackhawk Environmental Company

Neptune Caisson Pump [PDF] - Blackhawk Environmental Company

Neptune Caisson Pump [PDF] - Blackhawk Environmental Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DRIVE ROD/PISTON INSTALLATION<br />

Step 4<br />

A. Uncoil piston-rod-assembly<br />

(Lay coil out in open area. Stand in middle<br />

of coil when uncoiling.)<br />

(Caution: Coil under tension!)<br />

B. Slide drive piston down riser pipe to<br />

bottom. The minimum radius of<br />

curvature of the piston rod when<br />

retrieved is 2.5 feet, which equals<br />

760 mm. Use rag during drive-rod<br />

installation to prevent damage from<br />

flange edge.<br />

Piston Rod<br />

Discharge Tee<br />

Well cap / seal<br />

Riser Pipe<br />

Wellhead<br />

Note: Piston will have much more<br />

resistance for the final 2-3 ft. of install.<br />

Deep Set<br />

Piston<br />

CONNECTION OF ROD TO TOP HEAD DRIVE MOTOR<br />

Step 5<br />

Drive Motor Rod<br />

Compression Nut<br />

Piston Rod<br />

A. Rod bottomed out –<br />

mark rod.<br />

B. Lift rod up and cut 20”<br />

below mark.<br />

6<br />

C. Attach compression fitting<br />

to the cut end of rod, and screw<br />

into drive motor rod.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!