DATE CLIENT / OWNER VESSEL / HULL NO DESCRIPTION OF WORK<br />
Jun-04 KEPPEL FELS / ENSCO<br />
120 MEN JACK UP RIG / B264 ENSCO<br />
107<br />
DESIGN,SUPPLY,INSTALL & COMMISSIONING OF HVAC SYSTEM,ELECTRICAL SWITCH<br />
GEARS & CONTROLS SPACE & REFRIGERATION SYSTEMS<br />
Feb-04 KEPPEL FELS / CONSAFE<br />
400 MEN SEMI / SAFE CONCORDIA B261<br />
DESIGN,SUPPLY,INSTALL & COMMISSIONING OF MAIN AIR CONDITIONING ,<br />
MECH.VENTILATION,ELECTRICAL SWITCH GEARS & CONTROLS SPACE &<br />
REFRIGERATION SYSTEMS<br />
Oct-03 YANTAI RAFFLES / BP SHIPPING 4 X 93M PSV/ IMT992 145-148<br />
TURNKEY CONTRACTOR FOR DESIGN, SUPPLY, INSTALLATION & COMMISSIONING<br />
OF HVAC SYSTEMS<br />
Oct-03<br />
LABROY SHIPBUILDING / EMAS<br />
OFFSHORE<br />
300 MEN BARGE / H489<br />
DESIGN,SUPPLY AND COMMISSIONING OF MAIN AIR CONDITIONING AND<br />
REFRIGERATION SYSTEMS<br />
Jul-03<br />
KEPPEL FELS / ENSCO<br />
120 MEN JACK UP RIG / ENSCO 106<br />
B257<br />
DESIGN,SUPPLY,INSTALL & COMMISSIONING OF HVAC SYSTEM,ELECTRICAL SWITCH<br />
GEARS & CONTROLS SPACE & REFRIGERATION SYSTEMS<br />
Jul-03 ZHENJIANG / SEALION OFFSHORE 60M PSV/ ZJS200301 DESIGN,SUPPLY,INSTALLATION & COMMISSIONING OF REFRIGERATION SYSTEMS<br />
Jul-03 JAYA SHIPBUILDING 2 X 48M AHST DESIGN,SUPPLY & COMMISSIONING OF HVAC & REFRIGERATION SYSTEMS<br />
May-03 ZHENJIANG SHIPYARD,CHINA 3 X 75M PSV / VZJ689-01-03 DESIGN,SUPPLY,INSTALLATION & COMMISSIONING OF REFRIGERATION SYSTEMS<br />
Apr-03<br />
WAI GAO QIAO / BOHAI<br />
CORPORATION<br />
170,000DWT FPSO / 1010<br />
DESIGN,SUPPLY, COMMISSIONING OF MAIN AIR CONDITIONING SYSTEM,ELECTRICAL<br />
SWITCH GEARS & CONTROLS SPACE & REFRIGERATION SYSTEMS<br />
Mar-03 JINGJIANG SUMEC / JAYA HOLDINGS<br />
2 X 200 MEN BARGE / JSS02C-029,<br />
JSS02C-030<br />
DESIGN,SUPPLY,INSTALL & COMMISSIONG GOF MAIN AIR CONDITIONING AND<br />
REFRIGERATION SYSTEMS<br />
Jan-03 PPL SHIPYARD / SANTA FE<br />
Dec-02<br />
JURONG SHIPYARD / PETROBAS<br />
BRAZIL<br />
120 MEN JACK UP RIG / R183<br />
FSO-P-50<br />
DESIGN,SUPPLY,INSTALL, COMMISSIONING OF MAIN AIR CONDITIONING,<br />
MECH.VENTILATION,ELECTRICAL SWITCH GEARS & CONTROLS SPACE &<br />
REFRIGERATION SYSTEMS<br />
INSTALL & COMMISSIONING OF MAIN AIR CONDITIONING AND VENTILATION SYSTEMS