07.11.2014 Views

Multiple Launcher Rocket System (MLRS)

Multiple Launcher Rocket System (MLRS)

Multiple Launcher Rocket System (MLRS)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Multiple</strong> <strong>Launcher</strong><br />

<strong>Rocket</strong> <strong>System</strong><br />

(MLRS)<br />

White Sands Missile Range<br />

Michael Walker


M270 MLRS <strong>Launcher</strong>s<br />

• NATO Developed<br />

• Used during Desert Storm<br />

• Traverse time of 93 sec.<br />

• Minimum time for firing is 3 minutes for<br />

M270 <strong>Launcher</strong>


M270 <strong>Launcher</strong>s (cont.)<br />

• Fully traced, self-propelled, self loading<br />

fire unit<br />

• Designed to increase standard artillery fire<br />

power<br />

• Can be reloaded within minutes


M270 MLRS <strong>Launcher</strong>s (cont.)<br />

• M270 <strong>Launcher</strong> Limitations<br />

– Developed using 1970’s Technology<br />

• Caused maintainability problems<br />

• Old processors prevents software updates to<br />

accommodate weapon system upgrades.<br />

– Replacement Components no Longer<br />

Manufactured


M270 <strong>Launcher</strong>s (cont.)<br />

• The <strong>Launcher</strong> has two modes


MLRS Weapons<br />

• M270 has two Launch Pod Assemblies<br />

(LPA)<br />

• Each LPA contains 6 rockets or 1 missile<br />

• <strong>Rocket</strong> has 644 bomblets<br />

• Missile has 950 bomblets


M26 <strong>Rocket</strong>


ATACMS Missile


Improved Fire Control <strong>System</strong><br />

(IFCS)<br />

LOW COST<br />

FIRE<br />

CONTROL<br />

PANEL


M270A1 Test Objectives<br />

• Must meet performance of the MLRS<br />

• Decrease cage travel time during missions<br />

• Increase worst aim point by approximately<br />

83%


Test Program<br />

• Conducted to coordinate, support, and<br />

document the hardware<br />

• Address a full complement of tests from<br />

component level development to<br />

environmental tests


Tests<br />

• Structure Test<br />

– Measure stress levels on launcher structure<br />

• Subsystem Performance Test<br />

– Tests for reliability and endurance<br />

• Engineering Development Test<br />

– Test prototype hardware and software<br />

• Integration Test<br />

– Verifies performance


FCS Mission Processing<br />

• Methods of Fire Control<br />

– Fire when ready<br />

• Allows operator to arm and fire himself<br />

– At my command<br />

• Fire command fires weapons on command<br />

–On call<br />

• Places the mission into a storage buffer for future<br />

execution<br />

– Time on target<br />

• Used to fire on a target at a specific time

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!