Metro Stations in Bengaluru.pdf - Apurva Bose Dutta
Metro Stations in Bengaluru.pdf - Apurva Bose Dutta
Metro Stations in Bengaluru.pdf - Apurva Bose Dutta
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Project Report<br />
they need to collaborate with a<br />
structural eng<strong>in</strong>eer<strong>in</strong>g firm. Thus<br />
came <strong>in</strong> our collaboration with SNC<br />
Laval<strong>in</strong>, an eng<strong>in</strong>eer<strong>in</strong>g and<br />
construction company. SPAN, a<br />
structural eng<strong>in</strong>eer<strong>in</strong>g firm (which<br />
is currently do<strong>in</strong>g the Hyderabad<br />
and Chennai <strong>Metro</strong>) was bought<br />
over by SNC Laval<strong>in</strong> for the same.<br />
SNC Laval<strong>in</strong>’s responsibility for this<br />
project was structural design and<br />
project coord<strong>in</strong>ation while DKA was<br />
head<strong>in</strong>g the architectural, MEP and<br />
fire fight<strong>in</strong>g.” The project got<br />
launched <strong>in</strong> 2007; the east-west<br />
stations are look<strong>in</strong>g forward to<br />
completion <strong>in</strong> Dec 2010 and the<br />
north-south <strong>in</strong> Dec 2012.<br />
DKA has been <strong>in</strong>to commercial<br />
architecture for sometime and have<br />
been work<strong>in</strong>g on contemporary<br />
designs. They are work<strong>in</strong>g towards<br />
open<strong>in</strong>g offices <strong>in</strong> Kolkata and<br />
Chennai. The <strong>Metro</strong> project was the<br />
first of its k<strong>in</strong>d which they decided<br />
to work on, all thanks to senior<br />
partner Br<strong>in</strong>da Kannan who has<br />
worked on three underground metro<br />
projects and two airport term<strong>in</strong>als<br />
<strong>in</strong> London before she moved down<br />
to India to form DKA three years<br />
back. Without mak<strong>in</strong>g any other<br />
metro stations as their reference,<br />
the firm thus plunged <strong>in</strong>to the<br />
project. A lot of calculations are<br />
<strong>in</strong>volved <strong>in</strong> the design of the metro<br />
s<strong>in</strong>ce it needs to have a dynamic<br />
structural design. Talk<strong>in</strong>g about the<br />
complications <strong>in</strong> design<strong>in</strong>g a project<br />
as challeng<strong>in</strong>g as this, Indraneel<br />
<strong>in</strong>forms us, “Any build<strong>in</strong>g takes<br />
dead load and thus requires a four<br />
po<strong>in</strong>t check. In the case of metro<br />
stations, they take load pass<strong>in</strong>g<br />
78 NBM&CW FEBRUARY 2010