09.11.2014 Views

Metro Stations in Bengaluru.pdf - Apurva Bose Dutta

Metro Stations in Bengaluru.pdf - Apurva Bose Dutta

Metro Stations in Bengaluru.pdf - Apurva Bose Dutta

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project Report<br />

they need to collaborate with a<br />

structural eng<strong>in</strong>eer<strong>in</strong>g firm. Thus<br />

came <strong>in</strong> our collaboration with SNC<br />

Laval<strong>in</strong>, an eng<strong>in</strong>eer<strong>in</strong>g and<br />

construction company. SPAN, a<br />

structural eng<strong>in</strong>eer<strong>in</strong>g firm (which<br />

is currently do<strong>in</strong>g the Hyderabad<br />

and Chennai <strong>Metro</strong>) was bought<br />

over by SNC Laval<strong>in</strong> for the same.<br />

SNC Laval<strong>in</strong>’s responsibility for this<br />

project was structural design and<br />

project coord<strong>in</strong>ation while DKA was<br />

head<strong>in</strong>g the architectural, MEP and<br />

fire fight<strong>in</strong>g.” The project got<br />

launched <strong>in</strong> 2007; the east-west<br />

stations are look<strong>in</strong>g forward to<br />

completion <strong>in</strong> Dec 2010 and the<br />

north-south <strong>in</strong> Dec 2012.<br />

DKA has been <strong>in</strong>to commercial<br />

architecture for sometime and have<br />

been work<strong>in</strong>g on contemporary<br />

designs. They are work<strong>in</strong>g towards<br />

open<strong>in</strong>g offices <strong>in</strong> Kolkata and<br />

Chennai. The <strong>Metro</strong> project was the<br />

first of its k<strong>in</strong>d which they decided<br />

to work on, all thanks to senior<br />

partner Br<strong>in</strong>da Kannan who has<br />

worked on three underground metro<br />

projects and two airport term<strong>in</strong>als<br />

<strong>in</strong> London before she moved down<br />

to India to form DKA three years<br />

back. Without mak<strong>in</strong>g any other<br />

metro stations as their reference,<br />

the firm thus plunged <strong>in</strong>to the<br />

project. A lot of calculations are<br />

<strong>in</strong>volved <strong>in</strong> the design of the metro<br />

s<strong>in</strong>ce it needs to have a dynamic<br />

structural design. Talk<strong>in</strong>g about the<br />

complications <strong>in</strong> design<strong>in</strong>g a project<br />

as challeng<strong>in</strong>g as this, Indraneel<br />

<strong>in</strong>forms us, “Any build<strong>in</strong>g takes<br />

dead load and thus requires a four<br />

po<strong>in</strong>t check. In the case of metro<br />

stations, they take load pass<strong>in</strong>g<br />

78 NBM&CW FEBRUARY 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!