14.11.2014 Views

Passendro Gold Project - AXMIN Inc.

Passendro Gold Project - AXMIN Inc.

Passendro Gold Project - AXMIN Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Passendro</strong>: Planned Transportation Routes<br />

Note – the river route involves off-loading<br />

at Pointe Noire, transfer by train to<br />

Brazzaville and loading on to river barges<br />

for transport to Bangui, CAR. It is open for<br />

6-7 months of the year (May-November).<br />

Fuel is imported to Matadi by barge and<br />

then piped to a large storage facility in<br />

Kinshasa before loading into barges for<br />

transport up river to Bangui.<br />

River Route – Brazzaville/Kinshasa to Bangui<br />

Rail Route – Point Noire to Brazzaville<br />

Road Route – Matadi to Kinshasa<br />

Road Route – Douala to Site<br />

19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!