14.11.2014 Views

Capstone Presentation - LSU Campus Sustainability

Capstone Presentation - LSU Campus Sustainability

Capstone Presentation - LSU Campus Sustainability

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Wired in series using the leads provided with the<br />

panels<br />

Grounding lugs are connected to the aluminum<br />

frame of each panel<br />

• #6 bare copper grounding wire is routed to each panel<br />

All wiring routed to a solar combiner box<br />

containing a 15 amp fuse<br />

Power routed through the column and exits the<br />

footing 18” below ground

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!