English Heritage Stonehenge Environmental Improvements Project ...
English Heritage Stonehenge Environmental Improvements Project ...
English Heritage Stonehenge Environmental Improvements Project ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1.0 INTRODUCTION<br />
1.1 Purpose of the Survey<br />
1.1.1 This report sets out the results of a botanical survey for the <strong>Stonehenge</strong> <strong>Environmental</strong><br />
<strong>Improvements</strong> <strong>Project</strong>. The purpose of this study is to inform a baseline against which the<br />
effects of development options and proposals can be assessed in relation to impacts on<br />
ecological and nature conservation resources..<br />
1.1.2 The scope of the study includes:<br />
• Identification of plant species and communities present within and around shortlisted site<br />
option Appraisal Areas; and<br />
• Evaluation of the identified plant species and communities in relation to their nature<br />
conservation importance.<br />
1.2 Study Area<br />
1.2.1 The Study Areas within and around the shortlisted site options for new visitor facilities 1 chosen<br />
for the purposes of the botanical surveys are shown on Figure 1.1.<br />
1<br />
The Future of <strong>Stonehenge</strong> – Public Consultation (<strong>English</strong> <strong>Heritage</strong>, July 2008)<br />
September 2008 1 Phase II Botanical Surveys<br />
11108605R_Botanical_DW_09-08<br />
Chris Blandford Associates