Kol Torah Schedule and Announcements PARSHAS METZORA
Kol Torah Schedule and Announcements PARSHAS METZORA
Kol Torah Schedule and Announcements PARSHAS METZORA
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Building Update #26<br />
Our Deck<br />
The roof is really moving along. They have put down the deck, which covers the steel beams<br />
<strong>and</strong> is what the basic structure for the roofing.<br />
Here is the view of the top of the Shul looking<br />
toward Fallstaff.<br />
Aron<br />
Here is the top of the men’s section looking<br />
towards the rear of the parking lot.<br />
This picture shows the top of the social hall. The<br />
man is st<strong>and</strong>ing over the hall in the rear of the<br />
shul. Our air conditioning <strong>and</strong> heating unit sits<br />
there <strong>and</strong> the hole is for the ductwork that will<br />
run in <strong>and</strong> out of the units.