Redevelopment - City of Crystal
Redevelopment - City of Crystal
Redevelopment - City of Crystal
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
edeveloped within the 20 year time frame. Instead, this plan should be viewed as a menu from<br />
which citizens, developers, the Planning Commission, the EDA and the <strong>City</strong> Council may<br />
compare and contrast various redevelopment opportunities within the city, and select the best<br />
project sites from among the 22 areas described in this chapter.<br />
5. <strong>Redevelopment</strong> projects may trigger, or be triggered by, adjacent public improvements such as<br />
roadway reconstruction, water and sewer upgrades, streetscaping, etc. In cases where near-term<br />
public improvements are being considered in a potential redevelopment area, but no<br />
redevelopment project is imminent, due consideration will be given to the impact <strong>of</strong> said<br />
improvements on the future redevelopment potential <strong>of</strong> the area.<br />
DESCRIPTIONS OF SPECIFIC POTENTIAL REDEVELOPMENT AREAS<br />
Area #1 - Lakeland Avenue from 60 th to 62 nd . This area is identified as a potential redevelopment area<br />
in the current Comprehensive Plan. Existing uses include auto-oriented commercial and single family<br />
residential. The residential parcels along Lakeland Avenue are relatively deep and the houses are<br />
generally in fair to poor condition. The right-in and right-out accesses at 60 th and 62 nd Avenues will be<br />
eliminated upon reconstruction <strong>of</strong> Bottineau Boulevard. The best post-redevelopment uses would be<br />
light industrial, destination <strong>of</strong>fice/showroom, <strong>of</strong>fice/warehouse, but not residential uses or general<br />
retail/service uses. The site design <strong>of</strong> any redevelopment would need to be sensitive to the residential<br />
area directly to the east.<br />
Area #2 - <strong>Crystal</strong> Airport. The <strong>Crystal</strong> Airport is one <strong>of</strong> six “reliever” airports owned & operated by<br />
the Metropolitan Airports Commission (“MAC”). Closure and redevelopment <strong>of</strong> the <strong>Crystal</strong> Airport site<br />
are preferred under the current Comprehensive Plan, mainly due to safety concerns (hundreds <strong>of</strong> housing<br />
units in the safety zones) and little local benefit from the facility. MAC is currently considering a Long<br />
Term Comprehensive Plan (“LTCP”) for the facility by which it would eliminate two <strong>of</strong> the four<br />
runways (one primary and one crosswind) and attempt to redevelop a small share <strong>of</strong> the site for as-yetundetermined<br />
non-aviation purposes. MAC has not indicated that they intend to close the facility, but<br />
the type <strong>of</strong> aviation using this airport is in decline, regionally and nationally. At any point in the future,<br />
it is conceivable that MAC would determine that the continued operation <strong>of</strong> the <strong>Crystal</strong> Airport is no<br />
longer warranted. The 436 acre airport site (336 in <strong>Crystal</strong>) <strong>of</strong>fers the greatest opportunity in the<br />
northwest suburbs and along the Bottineau transit corridor for significant infill development including<br />
new employment centers and housing. For this reason the entire airport site remains a potential<br />
redevelopment area.<br />
Area #3 - Lakeland Avenue from 56 th to 58 th . This area is identified as a potential redevelopment area<br />
in the current Comprehensive Plan. Existing uses are mostly commercial including the former <strong>Crystal</strong>-<br />
Pierz Marine. There will be impacts from the Bottineau Boulevard reconstruction project due to<br />
elimination <strong>of</strong> the existing frontage road and construction <strong>of</strong> a new “backage” road which will form the<br />
approximate border between non-residential uses along Bottineau Boulevard and the residential uses to<br />
the east. The right-in and right-out access to Bottineau Boulevard at 58 th Avenue / Airport Road will<br />
remain but it will be reconfigured to improve safety and traffic flow. This area would not be quite as<br />
isolated as Area #1, and therefore it might also be able to accommodate some destination retail or <strong>of</strong>fice<br />
uses.<br />
CRYSTAL COMPREHENSIVE PLAN - FOR MET COUNCIL SUBMITTAL - 5/19/2009 PAGE 38 OF 120