27.11.2014 Views

2005 Solar Decathlon Rules and Regulations

2005 Solar Decathlon Rules and Regulations

2005 Solar Decathlon Rules and Regulations

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Summary of Revisions<br />

March 12, 2004<br />

• Activated links to <strong>Solar</strong> <strong>Decathlon</strong> Accessibility Requirements <strong>and</strong> Guidelines <strong>and</strong> Battery Requirements <strong>and</strong> Guidelines documents.<br />

• Revised Regulation 10.3 to achieve consistency with 2003 International Codes <strong>and</strong> 2002 National Electric Code.<br />

• Moved battery-related requirements from Regulation 10.3 to the Battery Requirements <strong>and</strong> Guidelines document.<br />

• Revised Regulation 10.5.5: House Entryways.<br />

November 2, 2004<br />

• Revised Regulation 10.2: National Park Service (NPS) <strong>Regulations</strong> regarding teams’ financial responsibilities for any damage they cause to the<br />

National Mall.<br />

• Added an additional minimum load to Regulation 10.3.3: Structural to be used in structural design for “means of egress” components.<br />

• Provided clearer solar envelope drawings (Figures 1 <strong>and</strong> 2) in Regulation 10.5.2. Note that the dimensions have not changed.<br />

<strong>2005</strong> <strong>Solar</strong> <strong>Decathlon</strong> <strong>Rules</strong> <strong>and</strong> <strong>Regulations</strong><br />

<strong>Regulations</strong><br />

November 2, 2004 Page 22 of 22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!