Issue 99 - Nasho Front Page
Issue 99 - Nasho Front Page
Issue 99 - Nasho Front Page
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
• The Buildings can be upgraded to ensure they are fit use and that can include air conditioning.<br />
• Additional large items of memorabilia (guns, troop carriers etc) may be sourced by NSAA to be located<br />
within the new precinct<br />
• Option would be available for NSAA to use one / two of their buildings as part of the retail component<br />
of the Etro, (e.g. newsagent, Post Office, food outlet) either to operate themselves or to lease to an<br />
operator. The reduced size of the development will reduce the available market.<br />
• The buildings that would be available to the public include the Chapel; the Everyman’s Hut as a<br />
community hall and the museum. However it was noted the museum may need additional security as a<br />
result of de-commissioned rifles etc being stored there.<br />
• A Parade Ground or assembly area for up to 300 people on certain days is essential – estimated area is<br />
approx 600m2. This cannot be used as a car park during normal times but can be a paved public area for<br />
all to use. The size of the parade ground is yet to be determined and no set size has been agreed. (Fit for<br />
purpose will be the criteria.)<br />
• The Precinct will be a feature of the Etro. It is unlikely to be located in the conservation zone, although<br />
it could front it.<br />
• Monuments – feature flagpole, and memorial wall and walk,<br />
• Security of the heritage buildings important – advised of proposed on-site security – including cameras<br />
plus option for caretaker residential flat in the Etro.<br />
• Urged NSAA to continue existing work to maintain momentum in view of time lapse and to maintain<br />
an acceptable appearance.<br />
BUILDINGS<br />
Before and after – the derelict Chapel, restored for services and commemorations<br />
PAGE 4