C: Technical Criteria<br />

Operating Experience<br />

(1) Please list all independent power projects in respect of which the Applicant (or,<br />

in the case of a consortium applicant, the Operating Member (or the Lead<br />

Member)) has successfully owned and/or operated in the past 15 (fifteen) years:<br />

Project Name Offtaker Name Location Country Completion<br />

Date<br />

Megawattage<br />

(2) Please list each combined-cycle power project with a generating capacity of 200<br />

MW or more which is connected to the national power grid in the country in<br />

which such project is located in respect of which the Applicant (or, in the case of<br />

a consortium applicant, the Operating Member (or the Lead Member)) has<br />

successfully owned and/or operated over a period of not less than past two years:<br />

Project Name Offtaker Name Location Country Completion<br />

Date<br />

Megawattage<br />

(3) Do all of the projects cited in the response to questions (1) and (2) above meet<br />

the criteria for “successful” operation and management set out in Section 3.1.2 of<br />

Section II-H of the Pre-Qualification Document ____ Yes ____ No<br />

(4) Have the calculations of megawattage for purposes of the responses to questions<br />

(1) and (2) above been made in accordance with the requirements of Section<br />

3.1.3 of Section II-H of the Pre-Qualification Document ____ Yes ____ No<br />

Development Experience<br />

25