29.12.2014 Views

East Port of Spain Strategic Development Plan - WordPress – www ...

East Port of Spain Strategic Development Plan - WordPress – www ...

East Port of Spain Strategic Development Plan - WordPress – www ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EAST PORT OF SPAIN STRATEGIC DEVELOPMENT PLAN<br />

2 DRAINAGE<br />

PROJECT ACTIVITIES KEY STAKEHOLDERS TIMEFRAME<br />

2.1 Commission Drainage Study<br />

(To investigate drainage issues in<br />

wider <strong>East</strong> <strong>Port</strong>-<strong>of</strong>-<strong>Spain</strong> which<br />

impact on Beetham)<br />

• Review existing literature/studies<br />

on Drainage in the <strong>Port</strong> <strong>of</strong> <strong>Spain</strong><br />

area e.g. NIDCO, Genivar and<br />

Millette report<br />

• Develop a Terms <strong>of</strong> Reference for<br />

the consultant to review drainage<br />

study<br />

• Execute tender process to identify<br />

suitable consultant<br />

• Select and hire consultant<br />

• Conduct drainage study for<br />

<strong>East</strong> <strong>Port</strong> <strong>of</strong> <strong>Spain</strong> Area<br />

2.2 Drain Rehabilitation • Clean and clear drains throughout<br />

<strong>East</strong> <strong>Port</strong> <strong>of</strong> <strong>Spain</strong><br />

• Construct and rehabilitate roadside<br />

curb and slipper drains and box<br />

drains<br />

• Install silt traps as appropriate<br />

• EPOS DC<br />

• EPOS DC<br />

• EPOS DC<br />

• EPOS DC<br />

• EPOS DC<br />

• Consultant<br />

• EPOSDC<br />

• <strong>Port</strong> <strong>of</strong> <strong>Spain</strong> City Corporation<br />

• San Juan/Laventille Corporation<br />

• Drainage Division, MOWT<br />

• Phase 1<br />

• Phase 1 - 2<br />

2.3 Flood Control • Improve drainage outflow<br />

southwards across Beetham<br />

Highway<br />

• Construct retention ponds with<br />

pumps<br />

• Install silt traps as appropriate<br />

• EPOSDC<br />

• Drainage Division, MOWT<br />

• Phase 2 - 3<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!