29.12.2014 Views

How We Do It in MISO

How We Do It in MISO

How We Do It in MISO

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Ramp Products - Methodology<br />

• The Up Ramp Capability and <strong>Do</strong>wn Ramp Capability<br />

products that enable creation of additional rampable<br />

capability to better meet variable net load<br />

– Extends the concept of Headroom/Ramp Constra<strong>in</strong>ts currently<br />

implemented <strong>in</strong> Day Ahead Commitment function<br />

• Ramp Capability Requirements <strong>in</strong> Real Time will<br />

address both observed variations <strong>in</strong> forecasted NSI,<br />

load and renewable generation and also uncerta<strong>in</strong>ty<br />

due to forecast errors<br />

• Ramp Capability Requirements <strong>in</strong> Day Ahead market<br />

will fulfill anticipated ramp capability needed <strong>in</strong> Real<br />

Time<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!