30.12.2014 Views

updated South Central Regional Transportation Safety Plan (SCRTSP)

updated South Central Regional Transportation Safety Plan (SCRTSP)

updated South Central Regional Transportation Safety Plan (SCRTSP)

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Strategy 2.2: Conduct daytime and nighttime seatbelt checkpoints<br />

Step #<br />

Action Step<br />

Leader<br />

Description Output Measure Outcome Measure Timeline Budget STATUS<br />

Aug. 2013<br />

2.2.1 Local PD’s Enforce daytime/nighttime strict # of warnings<br />

seatbelt<br />

checkpoints on downtown areas # of citations<br />

and high-traffic rural locations issued<br />

Reduction in<br />

unrestrained fatalities and<br />

serious injuries<br />

3 years<br />

Completed<br />

2.2.2 Houma PD Coordinate with school principals # of schools<br />

to conduct checkpoints around participating<br />

school zones and provide reward<br />

to incentivize.<br />

# of warnings<br />

# of citations<br />

issued<br />

Strategy 2.3: Improve the capacity for law enforcement to enforce seatbelt use<br />

Reduction in unrestrained<br />

fatalities and serious injuries,<br />

specifically for youth<br />

1 year Underway<br />

Step #<br />

Action Step<br />

Leader<br />

Description Output Measure Outcome Measure Timeline Budget STATUS<br />

Aug. 2013<br />

2.3.1 Troop C Purchase portable light trailers that<br />

may be of use by police<br />

departments to light dark<br />

locations or stretch a roadway<br />

section during nighttime<br />

checkpoints<br />

# of warnings<br />

# of citations<br />

issued<br />

Reduction in unrestrained<br />

fatalities and serious injuries<br />

6 months<br />

to 1 year<br />

Completed<br />

Output measures generally refer to the calculation, recording, or tabulation of the results of an activity, effort, program, or process that can be expressed<br />

quantitatively.<br />

Outcome measures generally are the results of an activity, plan, process, or program and how that result compares to what was originally intended.<br />

Timeline<br />

Budget<br />

3 to 6 months Small (under $25,000)<br />

6 months to a year Modest ($26,000 to $50,000)<br />

1 year Medium ($51,000 to $100,000)<br />

2 years High ($100,000 to $300,000)<br />

3 years + Substantial ($300, 000 +)<br />

Ongoing<br />

Updated August 2013 <strong>South</strong> <strong>Central</strong> <strong>Regional</strong> <strong>Transportation</strong> <strong>Safety</strong> <strong>Plan</strong> (<strong>SCRTSP</strong>) – Occupant Protection Page 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!