uec_presentation_sep.. - Uranium Energy Corp.
uec_presentation_sep.. - Uranium Energy Corp.
uec_presentation_sep.. - Uranium Energy Corp.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
33<br />
GOLIAD ISR PROJECT -<br />
STAGE: NEAR TERM PRODUCTION<br />
6.9 mm lb. NI 43-101 Compliant Resource:<br />
-Measured & Indicated 5.4 million lbs. and Inferred 1.5 million lbs. U3O8 at avg. grade of 0.078<br />
Exciting “Blue Sky” Potential- <strong>Uranium</strong> mineralization remains open laterally in all directions.<br />
Final stages of permitting for production:<br />
Permits Received Permits Pending Production Status<br />
Class III Injection Well Permit (mine permit)<br />
Two Class I Injection Well Permits (disposal<br />
well permits)<br />
Production Area Authorization for its first<br />
production area<br />
Permit by Rule (air permit exemption); and<br />
Draft Radioactive Material License Final Radioactive Material License Commence construction<br />
State-approved Aquifer Exemption<br />
Concurrence with the Aquifer<br />
Exemption from the regional EPA<br />
Commence in-situ<br />
recovery of uranium