Table 2 : Requirements for Various Cargo Handling Facilities<br />

Additional Facility<br />

新 增 設 施<br />

Year<br />

年 份<br />

2005 2010 2 0 1 5 2020<br />

Container Terminal Berth<br />

(assumed berth length=320m)<br />

貨 櫃 碼 頭 泊 位<br />

( 假 設 泊 位 長 度 =320 米 )<br />

0 2 9 13<br />

Mid-stream Berth 1<br />

(assumed berth length=55m)<br />

中 流 作 業 泊 位<br />

1<br />

( 假 設 泊 位 長 度 =55 米 )<br />

0 0 0 0<br />

River Trade Terminal Berth<br />

(assumed berth length=50m)<br />

內 河 碼 頭 泊 位<br />

( 假 設 泊 位 長 度 =50 米 )<br />

0 0 20 29<br />

1 On the assumption that two mid-stream sites will be provided in Tsing Yi South<br />

(ex power plant) and Tsing Yi Southeast by 2005.<br />