Edison Township Public Meeting Silver Lake Solar Farm - PSEG
Edison Township Public Meeting Silver Lake Solar Farm - PSEG
Edison Township Public Meeting Silver Lake Solar Farm - PSEG
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
A<br />
D<br />
V<br />
A<br />
N<br />
C<br />
E<br />
D<br />
S<br />
O<br />
L<br />
A<br />
R<br />
P<br />
R<br />
O<br />
D<br />
U<br />
C<br />
T<br />
S<br />
PV<br />
Inverter<br />
3<br />
Meter<br />
Main<br />
Distribution<br />
Panel<br />
Emergency<br />
Power<br />
Panel<br />
T<br />
R S<br />
A W<br />
N I<br />
S T<br />
F C<br />
E H<br />
R<br />
Generator<br />
1 In a power outage, the existing emergency power system<br />
automatically disconnects from the outside electric grid<br />
2 The Generator starts<br />
The Inverter re-starts in a special “Generator Support Mode” and<br />
3<br />
automatically shares the building’s s emergency power load with the<br />
Generator, keeping fuel use to a minimum<br />
• When power is restored, the Inverter goes back to normal mode,<br />
supplying solar power to the building<br />
• The entire process is fully automated<br />