Technical services catalogue 2013 (PDF) - Photokina
Technical services catalogue 2013 (PDF) - Photokina
Technical services catalogue 2013 (PDF) - Photokina
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
T.02 – Water, exhaust vent,<br />
compressed air installations<br />
Price list <strong>2013</strong> · <strong>Technical</strong> <strong>services</strong> 12<br />
Description Price in € Unit Pictures<br />
Water supply. Includes all supply (1/2’’) and drainage (1 1/2’’) and odour trap (plastic, 40 mm) in<br />
compliance with the German Drinking Water Ordinance to the closest connecting point (pipelines<br />
up to 8 m) on the stand (usage of a different connecting point incurs a charge for the exhibitor).<br />
Also includes shut-off valve and 1 appliance connection<br />
Additional appliance connection(s)<br />
(Distance from water supply point < 1 m)<br />
Rental equipment – available only when ordering water supply<br />
T.03 – Hanging objects<br />
344.50 per item<br />
117.50 per item<br />
Low-pressure tap unit 43.00 per item<br />
5 l electric boiler(s) 67.00 per item<br />
Standard tap(s) or swivel tap(s) 28.00 per item<br />
Extraction units with an air exhaust pipe in Halls 1 – 11 on request<br />
Compressed air supply<br />
Connection from the hall mains to the stand is via rigid piping, 1⁄2”, max. 500 l/min. (in Halls 6-9,<br />
larger numbers upon request), max. pressure 8 bar in Halls 2-11<br />
Description Price in € Unit Pictures<br />
Suspension equipment incl. wire cable<br />
depending on ceiling structure, without special constructions that might be needed<br />
(provision on a for-hire basis, load capacity per suspension point)<br />
Fees for possibly required special built-to-measure constructions (pre-riggs) can be inquired<br />
individually.<br />
T.04 – Stand security<br />
on request<br />
on request per item<br />
Description Price in € Unit Pictures<br />
Stand security: The hourly rate applies for the duration of the event and during the construction<br />
and dismantling periods, including all additional costs.<br />
17.70 hourly rate<br />
>> back to product description<br />
<strong>Technical</strong> <strong>services</strong>