4 Details of job contʼd<br />
General condition of asbestos materials Good Poor<br />
The main type of asbestos<br />
Chrysotile Crocidolite ✔ Amosite Other (please specify)<br />
Lagging solid around valves, impact damage on straight section<br />
✔<br />
5 What combination of control measures will be used to reduce exposure as low as is reasonably practicable<br />
✔<br />
✔<br />
PAS 60-1 controlled wet-strip equipment<br />
Wrap and cut technique<br />
Intact removal of whole AIB panels/tiles, etc<br />
RPE<br />
✔<br />
✔<br />
Shadow vacuuming<br />
Enclosure of work under negative pressure<br />
Decontamination procedures using an asbestos decontamination unit<br />
Other - please describe<br />
Lagged small section (c.2m length + associated valve) at 4m height. Boiler house to be treated as enclosure: fixed<br />
items covered, area cleaned prior to work. Needle pattern as per method statement (2 lines of 10 needles at "2 o'clock"<br />
and "10 o'clock"). Anticipate c. 6 - 8 hours to achieve sufficient wetting.<br />
Space constraints in boiler room area: airlocks at top of stairs above boiler room - transit via rear yard. NPU rating =><br />
1000cfm, vented internally, reassurance air monitoring required. Additional trunking for roving head to eliminate dead<br />
spots.<br />
How will the work be supervised and monitored (Tick all issues that apply)<br />
✔<br />
✔<br />
Viewing panels CCTV Enclosure entry Other (please specify)<br />
Supervisor to be on site throughout job, entering enclosure (at minimum) to confirm sufficient wetting prior to removal.<br />
CCTV. Senior management may visit as part of routing performance monitoring regime.<br />
List the main non-asbestos risks associated with the work (see note 5)<br />
Small tower scaffold required - erected by trained personnel.<br />
Tripping hazards - trunking etc. to be managed by supervisor.<br />
DCU in main yard - liaison with client & temp barriers to ensure no FLT activity near DCU / transit route<br />
Size of job (area or volume) (see note 6)<br />